Message ID: 85     Entry time: Monday, April 16, 2012, 16:17
Author: Bevan Moss 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM1 
Target/Number: No Target 
Subject: High Voltage Test 

 A high voltage test was completed on a target free TM1 in the conditioning station. Only the turbo pumps on the target module were operational due to phase 2 construction. Testing started at 2:51PM with the following vacuum gauge readings, 1.6 x 10^-6 Diagnostics Box, 7.4 x 10^-7 Service Cap, 2.0 x 10^-6 Containment Box. Voltage was increased ~3kV at a time every minute until 21 kV was reached with a current of 0 uA. Voltage was then increased in ~1.5kV steps every 2 minutes until 30 kV was reach at a current of 60uA. This was held for 7 minutes until a spark occurred and the current spiked to 300uA and the voltage dropped. The voltage was dropped back to zero. The vacuum gauges had increased and read the following  1.6 x 10^-6 Diagnostics Box, 7.9 x 10^-7 Service Cap, 2.1 x 10^-6 Containment Box. Testing was restarted 2 minutes later (the vacuum gauges were still recovering for ~ another 2 minutes) and the voltage was quickly increased to 24kV reaching a current of 100uA. at 3:22 The current then fluxuated but trended up for the next 12 minutes peaking at a total current of 240uA. After this point the current started deceasing, at 3:41 the testing was concluded and the average current was ~170uA. The vacuum gauge readings were 1.6 x 10^-6 Diagnostics Box, 7.4 x 10^-7 Service Cap, 2.0 x 10^-6 Containment Box. It was deemed that this is "not ideal but good enough" to put the target on.  The maximum known required voltage will be ~22kV for Berillium which TM1 should be capable of providing.

ELOG V2.9.2-2455