Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 69 of 139  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Category Type Module Target/Numberdown Subject Text Attachments
  277   Monday, March 25, 2013, 14:19 Travis CaveConditioning StationStandard OperationTM4CS Test Target #1module moveTM#4 with the CS Test target has been moved
from the conditioning station to the south
hot cell. Move went well.
  
  2373   Tuesday, October 04, 2022, 07:19 Frank SongNorth Hot-CellStandard OperationTM4C#4electrical check an electrical was done for TM4 with
target C#4 installed on NHC.
 tm4_with_C#4_installed.png 
  2374   Wednesday, October 05, 2022, 09:31 David WangConditioning StationStandard OperationTM4C#4HS line helium pressure test. TM4 with C#4 at TCS.TM4 HS line helium pressure test is done.
70psi helium pressure@ 3XE-8 atm.cc/sec .
No leak. 
  
  2376   Tuesday, October 11, 2022, 12:39 Frank SongITEStandard OperationTM4C#4Module Connection TM4 with Target C#4 was connected
in ITE.
 TM4_with_C#4_connection_in_ITE.png 
  2388   Tuesday, November 22, 2022, 09:44 Frank SongITEStandard OperationTM4C#4module disconnectionTM4 with C#4 was disconnected in ITE  TM4_with_C#4_disconnected_in_ITE.png 
  2390   Tuesday, November 22, 2022, 12:41 Frank SongNorth Hot-CellStandard OperationTM4C#4electrical check TM4 with C#4 is checked on NHC
right after moving from ITE.
 TM4_with_C#4_electrical_check_right_after_moving_to_NHC.png 
  2394   Thursday, November 24, 2022, 11:32 Adam NewsomeSpent Target VaultStandard OperationTM4C#4C#4 Spent Target Moved to Storage VaultC#4 spent target was moved to the storage
vault, in pail 277. Dose rate at approximately
1 m when leaving the hot cell was 164 mSv/h.
 Target_Index_2022-11-24.pdf 
  2395   Tuesday, November 29, 2022, 11:03 Adam NewsomeITEStandard OperationTM4C#4TM4 Move - TCS to ITETM4 was moved from the Conditioning Station
to the East Target Station with C#4. 
  
  2397   Thursday, December 01, 2022, 13:45 Carla BabcockNorth Hot-CellStandard OperationTM4C#4Post irradiation inspection C#4Post irradiation inspection of C#4 which
was running in TM4/ITE was conducted at the
NHC on Nov. 22 2022.
 20221122_152435.jpg20221122_153033.jpg20221122_152407.jpg 
  2252   Monday, October 04, 2021, 09:27 Frank SongITWStandard OperationTM2C#3Module Connection TM2 been connected with new target
C#3 in ITW. 
 IMG_3711.jpgIMG_3712.jpgIMG_3713.jpgIMG_3714.jpg 
  2253   Monday, October 04, 2021, 09:33 Frank SongNorth Hot-CellStandard OperationTM2C#3TM2 with target connection test the test was done when TM2 sit on
NHC.
 IMG_3710.jpg 
  2262   Tuesday, November 09, 2021, 09:58 Frank SongITWStandard OperationTM2C#3module disconnection the module TM2 with target C#3 was
disconnected at ITW and is being remoted
moving to SHC.
 IMG_4315.jpg 
  2266   Wednesday, November 10, 2021, 11:06 Travis CaveSpent Target VaultStandard Operation C#3Spent Target Move The spent C#3 target has been moved
from the south hot cell to the spent target
vault it was placed in pail #270 and put
 Target_Index_2021-11-10.pdf 
  2156   Monday, October 19, 2020, 12:52 David WangSouth Hot-CellStandard OperationTM2C#2TM2 electrical and leak check at SHCTM2 electrical check and leak check are
done at SHC with C#2 target installed. The
results are good.  
 Tm3_bunker_set_up_018.JPG 
  2157   Tuesday, October 20, 2020, 10:14 Travis CaveITWStandard OperationTM2C#2Module move TM#2 with C#2 has been moved from
the south hot cell to the West Target Station.
  
  2167   Thursday, November 19, 2020, 12:00 Adam NewsomeSpent Target VaultStandard Operation C#2Spent Target MoveC#2 has been moved from the south hot cell
to the spent target  vault. It is in spot
8A of the vault in pail # 235 and was 185
  
  2103   Wednesday, June 17, 2020, 09:49 chad fisherSouth Hot-CellStandard OperationTM4C#1C#1 installedTarget C#1 has been installed on TM4 with
new high current fasteners torqued to 130in
lbs.
 C#1_Target.jpg 
  2104   Wednesday, June 17, 2020, 09:53 David WangSouth Hot-CellStandard OperationTM2C#1C#1 target electrical check and leak check at SHC.Target to HS is 400 ohm. The rest check
is good. See attachment.
 C#1_target_electrical_and_leak_check.pdf 
  2106   Thursday, June 18, 2020, 13:22 David WangITWStandard OperationTM2C#1Remove of TM2 from ITE to SHC.Remotely remove TM2 from ITW to SHC. The
move is good.  Shielding plug is put
back to ITW. 
  
  2115   Friday, July 03, 2020, 06:57 David WangITWStandard OperationTM2C#1TM2 CONNECTION CHECKLIST SEE ATTACHMENTS. EVERYTHING IS GOOD.  TM2_C#1_CONNECTION_CHECKLIST.pdf 
ELOG V2.9.2-2455