Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 235     Entry time: Friday, January 18, 2013, 09:10
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: CS Test Target #1 
Subject: Electrical check 

Electrical check performed on the CS Test Target #1 at the south hot cell. See PDF for details.

Attachment 1: CS_Test_Target_#1_Elec_check.PDF  236 kB  | Show | Hide all
ELOG V2.9.2-2455