Tuesday, February 26, 2013, 13:24, Travis Cave, Conditioning Station, Standard Operation, TM4, CS Test Target #1, module move
|
TM#4 with CS Test Target #1 (dummy target) moved from the conditioning station to the east target station. Move went well. |
Friday, March 08, 2013, 15:50, Bevan Moss, ITE, Standard Operation, TM4, CS Test Target #1, Module Move from ITE to SHC
|
Today David and I moved the module from ITE to the SHC. Move went very smoothly, David operated the cameras and has had basic training in how to
manually lock out the controls. |
Wednesday, March 13, 2013, 14:31, Bevan Moss, Conditioning Station, Standard Operation, TM4, CS Test Target #1, Module Move
|
TM4 with CS Test Target #1 was moved from the SHC to the Conditioning Station. All went well. The welding cables came a little close to the cage,
David will bend them in more in the future. |
Wednesday, March 13, 2013, 15:26, Bevan Moss, Conditioning Station, Development, TM4, CS Test Target #1, Roughing Started
|
Roughing pumps were turned on at 15:23 13/03/2013. |
Thursday, March 14, 2013, 11:25, Bevan Moss, Conditioning Station, Standard Operation, TM4, CS Test Target #1, Turbos Started 
|
Turbos started at 11:14. TP1S achieved full speed in less than 2 minutes. TP1 and 2 tripped at 9 minutes. Restarted and reached at speed after
another 1 minute 20 seconds. |
Monday, March 18, 2013, 12:03, Bevan Moss, Conditioning Station, Repair, TM4, CS Test Target #1, Turbo Pump 1 Failure and Venting
|
Over the weekend Turbo pump one failed. It was attempted to restart the turbo in soft start but that also failed. Although the Vacuum was good
enough to operate both Turbos are required to pass commissioning. As such the pumps were turned off at ~10:00 today. Venting started at 12:00. |
Monday, March 18, 2013, 12:39, Bevan Moss, Conditioning Station, Repair, TM4, CS Test Target #1, TGHT PS Failure
|
The Model of the Power Supply (PS) is TSQLG 480-20/1500 and serial number is 2755.02.01.01.09.
We went to test the PS and supplied the required 480V and turned the local switch to on. At this point nothing happened, the
controls screen didn’t light up nothing. We tried to run the PS in remote mode as that is what it had previously been set at and again there was |
Monday, March 18, 2013, 15:28, Bevan Moss, Conditioning Station, Standard Operation, TM4, CS Test Target #1, Vented With Argon
|
The conditioning station has been vented with argon. Time taken is not known but it is less than 3 hours. See attached picture for convectron gauge
readings. CG1A is in air. |
Tuesday, March 19, 2013, 09:55, Bevan Moss, Conditioning Station, Standard Operation, TM4, CS Test Target #1, Turbo pump 1 replaced roughing started
|
David replaced the broken turbo pump this morning and I have started roughing at 9:54. |
Tuesday, March 19, 2013, 13:49, Bevan Moss, Conditioning Station, Standard Operation, TM4, CS Test Target #1, Tubros Started
|
Turbo Pumps have been started and are in normal operation. TP1 which has recently been replaced was started in soft start and had no issues. TP2
was started normally and tripped prior to reaching speed. It was left for a while and restarted. When restarted it was still at 17KRPM, it reached normal
operation. |
Monday, March 25, 2013, 09:35, Bevan Moss, Conditioning Station, Standard Operation, TM4, CS Test Target #1, Cooling Package and Vacuum Stopped
|
The cooling package and vacuum was stopped today at 9:26 so the module can be move. |
Monday, March 25, 2013, 14:19, Travis Cave, Conditioning Station, Standard Operation, TM4, CS Test Target #1, module move
|
TM#4 with the CS Test target has been moved from the conditioning station to the south hot cell. Move went well. |
Tuesday, October 04, 2022, 07:19, Frank Song, North Hot-Cell, Standard Operation, TM4, C#4, electrical check
|
an electrical was done for TM4 with target C#4 installed on NHC. |
Wednesday, October 05, 2022, 09:31, David Wang, Conditioning Station, Standard Operation, TM4, C#4, HS line helium pressure test. TM4 with C#4 at TCS.
|
TM4 HS line helium pressure test is done. 70psi helium pressure@ 3XE-8 atm.cc/sec . No leak. |
Tuesday, October 11, 2022, 12:39, Frank Song, ITE, Standard Operation, TM4, C#4, Module Connection
|
TM4 with Target C#4 was connected in ITE. |
Tuesday, November 22, 2022, 09:44, Frank Song, ITE, Standard Operation, TM4, C#4, module disconnection
|
TM4 with C#4 was disconnected in ITE |
Tuesday, November 22, 2022, 12:41, Frank Song, North Hot-Cell, Standard Operation, TM4, C#4, electrical check
|
TM4 with C#4 is checked on NHC right after moving from ITE. |
Thursday, November 24, 2022, 11:32, Adam Newsome, Spent Target Vault, Standard Operation, TM4, C#4, C#4 Spent Target Moved to Storage Vault
|
C#4 spent target was moved to the storage vault, in pail 277. Dose rate at approximately 1 m when leaving the hot cell was 164 mSv/h. The pail has been
placed in vault location 4C. See updated vault layout attached. |
Tuesday, November 29, 2022, 11:03, Adam Newsome, ITE, Standard Operation, TM4, C#4, TM4 Move - TCS to ITE
|
TM4 was moved from the Conditioning Station to the East Target Station with C#4. |
Thursday, December 01, 2022, 13:45, Carla Babcock, North Hot-Cell, Standard Operation, TM4, C#4, Post irradiation inspection C#4  
|
Post irradiation inspection of C#4 which was running in TM4/ITE was conducted at the NHC on Nov. 22 2022.
The yields from this target had been dropping and its behaviour was erratic, with the voltages on the tube and target jumping all over the place
sometimes. The ion current on the FCs followed the voltages. We took this to mean the target container was breaking down. |
|