  RH-ISAC, Page 69 of 140  Not logged in ELOG logo
ID Date Author Category Type Module Target/Numberdown Subject
  249   Tuesday, February 26, 2013, 13:24 Travis CaveConditioning StationStandard OperationTM4CS Test Target #1module move

TM#4 with CS Test Target #1 (dummy target) moved from the conditioning station to the east target station. Move went well.

  255   Friday, March 08, 2013, 15:50 Bevan MossITEStandard OperationTM4CS Test Target #1Module Move from ITE to SHC

 Today David and I moved the module from ITE to the SHC. Move went very smoothly, David operated the cameras and has had basic training in how to manually lock out the controls.

  260   Wednesday, March 13, 2013, 14:31 Bevan MossConditioning StationStandard OperationTM4CS Test Target #1Module Move

 TM4 with CS Test Target #1 was moved from the SHC to the Conditioning Station. All went well. The welding cables came a little close to the cage, David will bend them in more in the future.

  261   Wednesday, March 13, 2013, 15:26 Bevan MossConditioning StationDevelopmentTM4CS Test Target #1Roughing Started

 Roughing pumps were turned on at 15:23 13/03/2013.

  265   Thursday, March 14, 2013, 11:25 Bevan MossConditioning StationStandard OperationTM4CS Test Target #1Turbos Started

 Turbos started at 11:14. TP1S achieved full speed in less than 2 minutes. TP1 and 2 tripped at 9 minutes. Restarted and reached at speed after another 1 minute 20 seconds.

  267   Monday, March 18, 2013, 12:03 Bevan MossConditioning StationRepairTM4CS Test Target #1Turbo Pump 1 Failure and Venting

 Over the weekend Turbo pump one failed. It was attempted to restart the turbo in soft start but that also failed. Although the Vacuum was good enough to operate both Turbos are required to pass commissioning. As such the pumps were turned off at ~10:00 today. Venting started at 12:00.

  268   Monday, March 18, 2013, 12:39 Bevan MossConditioning StationRepairTM4CS Test Target #1TGHT PS Failure

The Model of the Power Supply (PS) is TSQLG 480-20/1500 and serial number is 2755.02.01.01.09.

We went to test the PS and supplied the required 480V and turned the local switch to on. At this point nothing happened, the controls screen didn’t light up nothing. We tried to run the PS in remote mode as that is what it had previously been set at and again there was no response. At this point I called the electrician the check that we were in fact supplying 480V. He checked all the way to the contactor inside of the PS (see attached picture). He also checked the 3 larger fuses and 6 smaller ones, they have not failed.

I have inquired with Jens Lassen who is more familiar with these PS and he has not had this issue before. He is going to have another look at the PS with the electrician specifically checking the 24VDC for the control board. Any further information or checks you could provide would be very helpful.

 This PS is needed for commissioning of a system and unfortunately this failure has come at a very in opportune time.  Although the PS is show to be several years old we have not actually used it aside from some minor tests ie does it turn on (it has previously).  I have phoned the manufacture to determine what else can be check and what the next steps are. Werner requested that I send an email (completed) so he could give it to their engineers.

  269   Monday, March 18, 2013, 15:28 Bevan MossConditioning StationStandard OperationTM4CS Test Target #1Vented With Argon

 The conditioning station has been vented with argon. Time taken is not known but it is less than 3 hours. See attached picture for convectron gauge readings. CG1A is in air.

  270   Tuesday, March 19, 2013, 09:55 Bevan MossConditioning StationStandard OperationTM4CS Test Target #1Turbo pump 1 replaced roughing started

 David replaced the broken turbo pump this morning and I have started roughing at 9:54.

  271   Tuesday, March 19, 2013, 13:49 Bevan MossConditioning StationStandard OperationTM4CS Test Target #1Tubros Started

 Turbo Pumps have been started and are in normal operation. TP1 which has recently been replaced was started in soft start and had no issues. TP2 was started normally and tripped prior to reaching speed. It was left for a while and restarted. When restarted it was still at 17KRPM, it reached normal operation.

  275   Monday, March 25, 2013, 09:35 Bevan MossConditioning StationStandard OperationTM4CS Test Target #1Cooling Package and Vacuum Stopped

 The cooling package and vacuum was stopped today at 9:26 so the module can be move.

  277   Monday, March 25, 2013, 14:19 Travis CaveConditioning StationStandard OperationTM4CS Test Target #1module move

TM#4 with the CS Test target has been moved from the conditioning station to the south hot cell. Move went well.

  2373   Tuesday, October 04, 2022, 07:19 Frank SongNorth Hot-CellStandard OperationTM4C#4electrical check

 an electrical was done for TM4 with target C#4 installed on NHC.

  2374   Wednesday, October 05, 2022, 09:31 David WangConditioning StationStandard OperationTM4C#4HS line helium pressure test. TM4 with C#4 at TCS.

TM4 HS line helium pressure test is done. 70psi helium pressure@ 3XE-8 atm.cc/sec . No leak.

  2376   Tuesday, October 11, 2022, 12:39 Frank SongITEStandard OperationTM4C#4Module Connection

 TM4 with Target C#4 was connected in ITE.

  2388   Tuesday, November 22, 2022, 09:44 Frank SongITEStandard OperationTM4C#4module disconnection

TM4 with C#4 was disconnected in ITE

  2390   Tuesday, November 22, 2022, 12:41 Frank SongNorth Hot-CellStandard OperationTM4C#4electrical check

 TM4 with C#4 is checked on NHC right after moving from ITE.

  2394   Thursday, November 24, 2022, 11:32 Adam NewsomeSpent Target VaultStandard OperationTM4C#4C#4 Spent Target Moved to Storage Vault

C#4 spent target was moved to the storage vault, in pail 277. Dose rate at approximately 1 m when leaving the hot cell was 164 mSv/h. The pail has been placed in vault location 4C. See updated vault layout attached.

  2395   Tuesday, November 29, 2022, 11:03 Adam NewsomeITEStandard OperationTM4C#4TM4 Move - TCS to ITE

TM4 was moved from the Conditioning Station to the East Target Station with C#4.

  2397   Thursday, December 01, 2022, 13:45 Carla BabcockNorth Hot-CellStandard OperationTM4C#4Post irradiation inspection C#4

Post irradiation inspection of C#4 which was running in TM4/ITE was conducted at the NHC on Nov. 22 2022.

The yields from this target had been dropping and its behaviour was erratic, with the voltages on the tube and target jumping all over the place sometimes. The ion current on the FCs followed the voltages. We took this to mean the target container was breaking down.

Upon inspection we found the container looked pretty damaged - highly crystallized and distorted. The container had gone banana-shaped, but not in the usual direction. It had curved  in the direction of the ion source (see photos). The heat shield and other surrounding components were super clean, no deposits or marks at all.