2655
|
Monday, August 12, 2024, 15:55 |
Aaron Tam | South Hot-Cell | Standard Operation | TM2 | Ta#67 LP-SIS | Target Loading | Ta#67 Target loaded onto TM2
Leak check passed
Electrical test passed after loosening |
|
2656
|
Tuesday, August 13, 2024, 08:39 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | Ta#67 | electrical check/leak check | TM2 with new target Ta#67 had been
electric/leak checked before moving to ITE.
See attachment pls. |
|
2657
|
Tuesday, August 13, 2024, 14:18 |
Frank Song | ITE | Standard Operation | TM2 | Ta#67 | Module Connection | TM2 with new target Ta#67 was connected
in ITE, all TP are running at their full
speed now. |
|
2666
|
Monday, August 19, 2024, 15:29 |
Frank Song | ITW/ITE | Standard Operation | TM2 | Ta#67 | shielding blocks transfer | 5 shielding blocks have been transferred
from ITW to ITE, MAA has been secured after
moving. |
|
2695
|
Tuesday, October 01, 2024, 09:16 |
Frank Song | ITE | Standard Operation | TM2 | Ta#67 | module disconnection | TM2 with spent target Ta#67 was disconnected
in ITE. see attachment pls. |
|
2697
|
Tuesday, October 01, 2024, 12:40 |
Aaron Tam | South Hot-Cell | Standard Operation | TM2 | Ta#67 | Target Ta#67 Removed from TM2 | October 1, 2024 - Aaron Tam
Ta#67 LP-SIS removed from TM2
Ta#67 is sitting in SHC awaiting |
9x |
2702
|
Thursday, October 10, 2024, 10:24 |
Aaron Tam | South Hot-Cell | Standard Operation | TM2 | Ta#67 | Ta#67 PIE | Post Irradiation Examination
October 9, 2024 - Aaron Tam w/
Chad Fisher, Aurelia Laxdal, and Lucas Backes |
35x |
2492
|
Wednesday, October 04, 2023, 10:41 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | Ta#66 | electrical check/leak check | TM2 with new target Ta#66 had an
electrical check and leak check on SHC. |
|
2493
|
Thursday, October 05, 2023, 13:50 |
Frank Song | ITW | Standard Operation | TM2 | Ta#66 | Module Connection | TM2 with new target Ta#66 was connected
in ITW. |
|
2514
|
Wednesday, January 03, 2024, 13:55 |
David Wang | ITW | Standard Operation | TM2 | Ta#66 | Disconnect TM2 in ITW. | TM2 has been disconnected in ITW. All water
lines are nitrogen purged. Filled 60 psi
argon to all Tm2 water lines for module storage |
|
2515
|
Wednesday, January 03, 2024, 14:03 |
David Wang | ITW | Standard Operation | TM2 | Ta#66 | ITW primary and secondary vacuum vessel leak check and TM2 water lines helium pressure test. | ITW primary and secondary vacuum vessel
leak check and TM2 water lines helium pressure
test are done today. No major concern. see |
|
2518
|
Wednesday, January 10, 2024, 11:24 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#66 | Spent Target Move | The spent Ta#66 was moved from the
south hot cell to the spent target vault,
it was placed in pail#285 and placed in spot |
|
2523
|
Friday, January 12, 2024, 11:25 |
David Wang | South Hot-Cell | Standard Operation | TM2 | Ta#66 | Ta#66 post operation electrical check at SHC | Ta#66 post operation electrical check was
done at SHC this Monday. See attachment.
|
|
2524
|
Wednesday, January 17, 2024, 20:09 |
Carla Babcock | South Hot-Cell | Standard Operation | | Ta#66 | Ta#66 post irradiation inspection | On Jan. 9 we did the PIE on Ta#66. Opened
the heat shield and removed the EE. The inside
of the heat shield was very black with lots |
|
2582
|
Friday, May 03, 2024, 12:20 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#66 | Target repacked | The Ta#66 target was repacked after
the parasitic target was removed it was place
in a new pail (#290) and place back in spot |
|
2485
|
Tuesday, August 29, 2023, 14:32 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta#65 | electrical check/leak check | TM4 with new target Ta#65 has been
E/L checked at NHCPost. |
|
2486
|
Tuesday, August 29, 2023, 14:32 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta#65 | electrical check/leak check | TM4 with new target Ta#65 has been
E/L checked at NHCPost. |
|
2488
|
Wednesday, September 06, 2023, 08:07 |
Frank Song | ITE | Standard Operation | TM4 | Ta#65 | Module Connection | TM4 was connected in ITE with new
target Ta#65 installed. see attachment in
detail. |
|
2498
|
Tuesday, November 07, 2023, 13:42 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | Ta#65 | electrical check with the spent target | TM4 with spent target Ta#65 was electrical
checked right after being moved to SHC. |
|
2499
|
Tuesday, November 07, 2023, 13:55 |
Frank Song | ITE | Standard Operation | TM4 | Ta#65 | module disconnection | TM4 with spent target Ta#65 was disconnected
in ITE and moved to SHC. |
|