Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2664     Entry time: Friday, August 16, 2024, 15:32
Author: Aaron Tam 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: Ta#68 LP-SIS 
Subject: Target Ta#68 loaded onto TM4  

 Target Ta#68 loaded onto TM4 

-leak check passed

-Target electrode conductor screws torqued to 130 in-lbs

-electrical check passed

Containment box cover re-installed 

photo attached 

Attachment 1: Ta-68_Installed.jfif  223 kB
ELOG V2.9.2-2455