Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2666     Entry time: Monday, August 19, 2024, 15:29
Author: Frank Song 
Category: ITW/ITE 
Type: Standard Operation 
Module: TM2 
Target/Number: Ta#67 
Subject: shielding blocks transfer 

 5 shielding blocks have been transferred from ITW to ITE, MAA has been secured after moving.

ELOG V2.9.2-2455