Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2657     Entry time: Tuesday, August 13, 2024, 14:18
Author: Frank Song 
Category: ITE 
Type: Standard Operation 
Module: TM2 
Target/Number: Ta#67 
Subject: Module Connection 

 TM2 with new target Ta#67 was connected in ITE, all TP are running at their full speed now.

Attachment 1: TM2_with_Ta#67_connection_in_ITE_20240813.pdf  143 kB  | Show | Hide all
ELOG V2.9.2-2455