Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
2657
Entry time:
Tuesday, August 13, 2024, 14:18
Author:
Frank Song
Category:
ITE
Type:
Standard Operation
Module:
TM2
Target/Number:
Ta#67
Subject:
Module Connection
TM2 with new target Ta#67 was connected in ITE, all TP are running at their full speed now.
Attachment 1:
TM2_with_Ta#67_connection_in_ITE_20240813.pdf
143 kB
|
Show
|
Hide all
ELOG V2.9.2-2455