Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2662     Entry time: Friday, August 16, 2024, 13:29
Author: Frank Song 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: Ta#68 
Subject: electrical check/leak check 

 New target Ta#68 is installed on TM4 and be leak/electric checked. Pls see attachment.

Attachment 1: TM4_with_Ta#68_electric_and_leak_check_on_SHC_2028-08-16.pdf  63 kB  | Show | Hide all
ELOG V2.9.2-2455