Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2655     Entry time: Monday, August 12, 2024, 15:55
Author: Aaron Tam 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM2 
Target/Number: Ta#67 LP-SIS 
Subject: Target Loading 

 Ta#67 Target loaded onto TM2

Leak check passed

Electrical test passed after loosening off target electrode conductor screws, and torqueing by feel 

 

ELOG V2.9.2-2455