Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2656     Entry time: Tuesday, August 13, 2024, 08:39
Author: Frank Song 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM2 
Target/Number: Ta#67 
Subject: electrical check/leak check 

 TM2 with new target Ta#67 had been electric/leak checked before moving to ITE. See attachment pls.

Attachment 1: TM2_with_Ta@67_electric_and_leak_check_on_SHC.pdf  63 kB  | Show | Hide all
ELOG V2.9.2-2455