2698
|
Tuesday, October 08, 2024, 11:20 |
Aaron Tam | South Hot-Cell | Standard Operation | TM2 | Ta#68 | Ta#68 install onto TM2, w/ Troubleshooting | October 7, 2024 - Aaron Tam
Ta#68 HP-SIS checks performed at
B1 lab, moved to anteroom, and inserted into |
17x |
2701
|
Wednesday, October 09, 2024, 14:04 |
Frank Song | ITE | Standard Operation | TM2 | Ta#68 | Module Connection | TM2 with new target Ta#68 installed
is connected in ITE. Pls see form attached. |
|
2725
|
Tuesday, December 03, 2024, 10:10 |
Frank Song | ITE | Standard Operation | TM2 | Ta#68 | module disconnection | TM2 with spent target TA#68 was disconnected
in ITE and is being moved to SHC. All water
lines are purged for module storage. |
|
2728
|
Tuesday, December 03, 2024, 15:53 |
Aaron Tam | South Hot-Cell | Standard Operation | TM2 | Ta#68 | Ta#68 Removal | Note: Ta#68 had a difficult
install. See E-log ID# 2698 for more info
First look: |
22x |
2732
|
Wednesday, December 04, 2024, 14:30 |
Aaron Tam | South Hot-Cell | Standard Operation | | Ta#68 | Ta#68 PIE | Abstract:
This target has seen some irregular
beam patterns |
32x |
2733
|
Thursday, December 05, 2024, 11:43 |
Aaron Tam | South Hot-Cell | Standard Operation | | Ta#68 | Pail loading - Ta#68 & Others into Pail#300 | December 5, 2024 - Aaron Tam w/ help from
Chad, Peter and Adam at the Crane
Hot Cell Prep: |
    |
2734
|
Thursday, December 05, 2024, 12:00 |
Adam Newsome | Spent Target Vault | Standard Operation | | Ta#68 | Spent target move - Ta#68 in Pail 300 | Ta#68 spent target was moved in Pail 300
to storage vault location 5A. The dose rate
measured at the South Hot Cell was 429 mSv/h |
|
2658
|
Tuesday, August 13, 2024, 14:23 |
David Wang | ITE | Standard Operation | TM3 | Ta#67. | TM2 with Ta#target has been moved from SHC to ITE. | TM2 with Ta#target has been moved from
SHC to ITE. the move is smooth. |
|
2674
|
Friday, September 06, 2024, 10:01 |
David Wang | South Hot-Cell | Standard Operation | TM4 | Ta#67 back up. | TM4 has been moved from SMP to SHC. | TM4 has been moved from SMP to SHC. The
move is smooth. |
|
2655
|
Monday, August 12, 2024, 15:55 |
Aaron Tam | South Hot-Cell | Standard Operation | TM2 | Ta#67 LP-SIS | Target Loading | Ta#67 Target loaded onto TM2
Leak check passed
Electrical test passed after loosening |
|
2656
|
Tuesday, August 13, 2024, 08:39 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | Ta#67 | electrical check/leak check | TM2 with new target Ta#67 had been
electric/leak checked before moving to ITE.
See attachment pls. |
|
2657
|
Tuesday, August 13, 2024, 14:18 |
Frank Song | ITE | Standard Operation | TM2 | Ta#67 | Module Connection | TM2 with new target Ta#67 was connected
in ITE, all TP are running at their full
speed now. |
|
2666
|
Monday, August 19, 2024, 15:29 |
Frank Song | ITW/ITE | Standard Operation | TM2 | Ta#67 | shielding blocks transfer | 5 shielding blocks have been transferred
from ITW to ITE, MAA has been secured after
moving. |
|
2695
|
Tuesday, October 01, 2024, 09:16 |
Frank Song | ITE | Standard Operation | TM2 | Ta#67 | module disconnection | TM2 with spent target Ta#67 was disconnected
in ITE. see attachment pls. |
|
2697
|
Tuesday, October 01, 2024, 12:40 |
Aaron Tam | South Hot-Cell | Standard Operation | TM2 | Ta#67 | Target Ta#67 Removed from TM2 | October 1, 2024 - Aaron Tam
Ta#67 LP-SIS removed from TM2
Ta#67 is sitting in SHC awaiting |
9x |
2702
|
Thursday, October 10, 2024, 10:24 |
Aaron Tam | South Hot-Cell | Standard Operation | TM2 | Ta#67 | Ta#67 PIE | Post Irradiation Examination
October 9, 2024 - Aaron Tam w/
Chad Fisher, Aurelia Laxdal, and Lucas Backes |
35x |
2492
|
Wednesday, October 04, 2023, 10:41 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | Ta#66 | electrical check/leak check | TM2 with new target Ta#66 had an
electrical check and leak check on SHC. |
|
2493
|
Thursday, October 05, 2023, 13:50 |
Frank Song | ITW | Standard Operation | TM2 | Ta#66 | Module Connection | TM2 with new target Ta#66 was connected
in ITW. |
|
2514
|
Wednesday, January 03, 2024, 13:55 |
David Wang | ITW | Standard Operation | TM2 | Ta#66 | Disconnect TM2 in ITW. | TM2 has been disconnected in ITW. All water
lines are nitrogen purged. Filled 60 psi
argon to all Tm2 water lines for module storage |
|
2515
|
Wednesday, January 03, 2024, 14:03 |
David Wang | ITW | Standard Operation | TM2 | Ta#66 | ITW primary and secondary vacuum vessel leak check and TM2 water lines helium pressure test. | ITW primary and secondary vacuum vessel
leak check and TM2 water lines helium pressure
test are done today. No major concern. see |
|