Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 37 of 138  Not logged in ELOG logo
ID Date Author Category Type Module Target/Numberdown Subject
  2655   Monday, August 12, 2024, 15:55 Aaron TamSouth Hot-CellStandard OperationTM2Ta#67 LP-SISTarget Loading

 Ta#67 Target loaded onto TM2

Leak check passed

Electrical test passed after loosening off target electrode conductor screws, and torqueing by feel 

 

  2656   Tuesday, August 13, 2024, 08:39 Frank SongSouth Hot-CellStandard OperationTM2Ta#67electrical check/leak check

 TM2 with new target Ta#67 had been electric/leak checked before moving to ITE. See attachment pls.

Attachment 1: TM2_with_Ta@67_electric_and_leak_check_on_SHC.pdf
TM2_with_Ta@67_electric_and_leak_check_on_SHC.pdf
  2657   Tuesday, August 13, 2024, 14:18 Frank SongITEStandard OperationTM2Ta#67Module Connection

 TM2 with new target Ta#67 was connected in ITE, all TP are running at their full speed now.

Attachment 1: TM2_with_Ta#67_connection_in_ITE_20240813.pdf
TM2_with_Ta#67_connection_in_ITE_20240813.pdf TM2_with_Ta#67_connection_in_ITE_20240813.pdf TM2_with_Ta#67_connection_in_ITE_20240813.pdf TM2_with_Ta#67_connection_in_ITE_20240813.pdf
  2666   Monday, August 19, 2024, 15:29 Frank SongITW/ITEStandard OperationTM2Ta#67shielding blocks transfer

 5 shielding blocks have been transferred from ITW to ITE, MAA has been secured after moving.

  2695   Tuesday, October 01, 2024, 09:16 Frank SongITEStandard OperationTM2Ta#67module disconnection

 TM2 with spent target Ta#67 was disconnected in ITE. see attachment pls.

Attachment 1: TM2_with_spent_target_Ta#67_disconnection_in_ITE_2024-10-01.pdf
TM2_with_spent_target_Ta#67_disconnection_in_ITE_2024-10-01.pdf TM2_with_spent_target_Ta#67_disconnection_in_ITE_2024-10-01.pdf TM2_with_spent_target_Ta#67_disconnection_in_ITE_2024-10-01.pdf
  2697   Tuesday, October 01, 2024, 12:40 Aaron TamSouth Hot-CellStandard OperationTM2Ta#67Target Ta#67 Removed from TM2

 October 1, 2024 - Aaron Tam 

Ta#67 LP-SIS removed from TM2

Ta#67 is sitting in SHC awaiting PIE 

TM2 Containment Box Cover has not been reinstalled 

Photos of target removal and module attached 

Attachment 1: Containment_Box.jfif
Attachment 2: Containment_Box_Cover_Internal.jfif
Attachment 3: Target_Fasteners_on.jfif
Attachment 4: Target_Fasteners_off.jfif
Attachment 5: Service_Tray_no_Target.jfif
Attachment 6: Ta#67_Left.jfif
Attachment 7: Ta#67_Right.jfif
Attachment 8: Ta#67_Top.jfif
Attachment 9: Ta#67_Bottom.jfif
  2702   Thursday, October 10, 2024, 10:24 Aaron TamSouth Hot-CellStandard OperationTM2Ta#67Ta#67 PIE

 Post Irradiation Examination

October 9, 2024 - Aaron Tam w/ Chad Fisher, Aurelia Laxdal, and Lucas Backes 

PIE conducted by Chad with direction from Aurelia. Aaron and Lucas observing/documenting 

Goal: Thin foil target material is somewhat novel, and we should characterize the differences if there are any. 

Photos of the pre-examined target can be seen on ELOG 2697  on Tuesday October 1, 2024, when the target was removed from TM2

Notes:

  • Right most inner/outer target conductor bolts was sitting proud and had threads showing, photo attached
  • Some Black deposit was found on the inside of the heatshield directly below the extraction tube, and loose in powder form inside the heatshield. 
  • Target tube seems to have more of a crystalline texture than previous examinations.
  • When Target tube was being removed, one of the target electrode conductors broke off
  • some dimple texture was found on the target tube windows and this was further explored by prying a channel through the length of one side of the tube to get a better look

Target pieces were placed loosely back within the heatshield, and the lid loosely placed back on.

Awaiting pail loading, and move to storage vault

 

Attachment 1: Black_deposit_loose_inside_heatshield_(2).jfif
Attachment 2: Black_deposit_loose_inside_heatshield.jfif
Attachment 3: Black_Deposit_on_heatshield_(2).jfif
Attachment 4: Black_Deposit_on_heatshield.jfif
Attachment 5: Closer_Look_at_Broken_off_Conductor_piece.jfif
Attachment 6: Closer_look_Dimple_texture_on_target_tube_window_ENTRANCE_(2).jfif
Attachment 7: Closer_look_Dimple_texture_on_target_tube_window_ENTRANCE_(4).jfif
Attachment 8: Closer_look_Dimple_texture_on_target_tube_window_ENTRANCE.jfif
Attachment 9: Closer_look_Dimple_texture_on_target_tube_window_EXIT_(2).jfif
Attachment 10: Closer_look_Dimple_texture_on_target_tube_window_EXIT.jfif
Attachment 11: Conductor_Screw_sitting_proud_(1).jfif
Attachment 12: Conductor_Screw_sitting_proud.jfif
Attachment 13: Copper_Colour_Pattern_(2).jfif
Attachment 14: Copper_Colour_pattern.jfif
Attachment 15: Crystalline_Texture_on_target_tube_(1).jfif
Attachment 16: Crystalline_Texture_on_target_tube.jfif
Attachment 17: Entrance_Window_inside_heatshield.jfif
Attachment 18: Entrance_Window_outside_Heatshield.jfif
Attachment 19: Exit_Window_inside_Heatshield.jfif
Attachment 20: Exit_window_outside_heatshield.jfif
Attachment 21: f8ccf123-0d03-47b8-86c9-27ae5b29c70d.jfif
Attachment 22: f5747a26-1431-4506-8127-e30b1e829339.jfif
Attachment 23: fbcb86a1-2d48-46a9-a64f-f5bcb01959fa.jfif
Attachment 24: Open_Target_tube_dimple_feature.jfif
Attachment 25: Operation_Target_Tube_removal_(2).jfif
Attachment 26: Operation_Target_Tube_removal.jfif
Attachment 27: Procedure_Ripping_into_target_tube_(2).jfif
Attachment 28: Procedure_Ripping_into_target_tube_(4).jfif
Attachment 29: Procedure_Ripping_into_target_tube_(5).jfif
Attachment 30: Procedure_Ripping_into_target_tube_(6).jfif
Attachment 31: Procedure_Ripping_into_target_tube.jfif
Attachment 32: Target_Electrode_Conductor_removed.jfif
Attachment 33: Target_Tube_Window_ENTRANCE.jfif
Attachment 34: Target_window_ENTRANCE.jfif
Attachment 35: Target_window_EXIT.jfif
  2492   Wednesday, October 04, 2023, 10:41 Frank SongSouth Hot-CellStandard OperationTM2Ta#66electrical check/leak check

 TM2 with new target Ta#66 had an electrical check and leak check on SHC. 

Attachment 1: TM2_with_Ta#66_electical_and_leak_check_in_SHC_2023-10-04.pdf
TM2_with_Ta#66_electical_and_leak_check_in_SHC_2023-10-04.pdf
  2493   Thursday, October 05, 2023, 13:50 Frank SongITWStandard OperationTM2Ta#66Module Connection

 TM2 with new target Ta#66 was connected in ITW. 

Attachment 1: TM2_with_Ta#66_connection_in_ITW_2023-10-04.pdf
TM2_with_Ta#66_connection_in_ITW_2023-10-04.pdf TM2_with_Ta#66_connection_in_ITW_2023-10-04.pdf TM2_with_Ta#66_connection_in_ITW_2023-10-04.pdf TM2_with_Ta#66_connection_in_ITW_2023-10-04.pdf
  2514   Wednesday, January 03, 2024, 13:55 David WangITWStandard OperationTM2Ta#66Disconnect TM2 in ITW.

TM2 has been disconnected in ITW. All water lines are nitrogen purged. Filled 60 psi argon to all Tm2 water lines for module storage in winter shut down.

Attachment 1: TM2_with_Ta#66_was_disconnected_in_ITW_2024-01-02.pdf
TM2_with_Ta#66_was_disconnected_in_ITW_2024-01-02.pdf TM2_with_Ta#66_was_disconnected_in_ITW_2024-01-02.pdf TM2_with_Ta#66_was_disconnected_in_ITW_2024-01-02.pdf
  2515   Wednesday, January 03, 2024, 14:03 David WangITWStandard OperationTM2Ta#66ITW primary and secondary vacuum vessel leak check and TM2 water lines helium pressure test.

ITW primary and secondary vacuum vessel leak check and TM2 water lines helium pressure test are done today. No major concern. see attachment for small air to vacuum leak we found.  TM2 water lines helium pressure test is fine.   HS and window line leak rate are 1.4Xe-8 atm.cc/sec. all other water lines are below 3.0XE-9atm.cc/sec.

Attachment 1: ITW_2024_shut_down_leak_check.pdf
ITW_2024_shut_down_leak_check.pdf
  2518   Wednesday, January 10, 2024, 11:24 Travis CaveSpent Target VaultStandard Operation Ta#66Spent Target Move

 The spent Ta#66 was moved from the south hot cell to the spent target vault, it was placed in pail#285 and placed in spot 5B of the vault. The target was 46.2mSv/hr when removed from the south hot cell. See the attached PDF for vault details.

Attachment 1: Target_Index_2023-01-10.pdf
Target_Index_2023-01-10.pdf
  2523   Friday, January 12, 2024, 11:25 David WangSouth Hot-CellStandard OperationTM2Ta#66Ta#66 post operation electrical check at SHC

Ta#66 post operation electrical check was done at SHC this Monday. See attachment.

Attachment 1: TM2_Ta66_post__oeration_electrical_check.pdf
TM2_Ta66_post__oeration_electrical_check.pdf
  2524   Wednesday, January 17, 2024, 20:09 Carla BabcockSouth Hot-CellStandard Operation Ta#66Ta#66 post irradiation inspection

On Jan. 9 we did the PIE on Ta#66. Opened the heat shield and removed the EE. The inside of the heat shield was very black with lots of flakes falling off. The target itself looked overheated, and the container looked pretty bad for a Ta target. The outside of the EE looked perfect but after removing it there was a lot of black stuff on the side and we saw that the Re foil was curled up. Jens said during the runtime that he saw something that looked like a wire in the beam path, so maybe this was it.

Attachment 1: 20240109_100926(1).jpg
20240109_100926(1).jpg
Attachment 2: 20240109_101053.jpg
20240109_101053.jpg
Attachment 3: 20240109_102409.jpg
20240109_102409.jpg
  2582   Friday, May 03, 2024, 12:20 Travis CaveSpent Target VaultStandard Operation Ta#66Target repacked

 The Ta#66 target was repacked after the parasitic target was removed it was place in a new pail (#290) and place back in spot 5B of the vault. See attached PDF for further details.

Attachment 1: Target_Index_2024-05-03.pdf
Target_Index_2024-05-03.pdf
  2485   Tuesday, August 29, 2023, 14:32 Frank SongNorth Hot-CellStandard OperationTM4Ta#65electrical check/leak check

 TM4 with new target Ta#65 has been E/L checked at NHCPost.

Attachment 1: TM4_electric_and_leak_check_after_Ta#65_installed_2023-08-29.pdf
TM4_electric_and_leak_check_after_Ta#65_installed_2023-08-29.pdf
  2486   Tuesday, August 29, 2023, 14:32 Frank SongNorth Hot-CellStandard OperationTM4Ta#65electrical check/leak check

 TM4 with new target Ta#65 has been E/L checked at NHCPost.

Attachment 1: TM4_electric_and_leak_check_after_Ta#65_installed_2023-08-29.pdf
TM4_electric_and_leak_check_after_Ta#65_installed_2023-08-29.pdf
  2488   Wednesday, September 06, 2023, 08:07 Frank SongITEStandard OperationTM4Ta#65Module Connection

 TM4 was connected in ITE with new target Ta#65 installed. see attachment in detail.

Attachment 1: TM4_with_Ta#65_connection_in_ITE_2023-09-05.pdf
TM4_with_Ta#65_connection_in_ITE_2023-09-05.pdf TM4_with_Ta#65_connection_in_ITE_2023-09-05.pdf TM4_with_Ta#65_connection_in_ITE_2023-09-05.pdf TM4_with_Ta#65_connection_in_ITE_2023-09-05.pdf
  2498   Tuesday, November 07, 2023, 13:42 Frank SongSouth Hot-CellStandard OperationTM4Ta#65electrical check with the spent target

TM4 with spent target Ta#65 was electrical checked right after being moved to SHC. 

Attachment 1: TM4_with_Spent_Target_Ta#65_electrical_check_on_SHC_2023-11-07.pdf
TM4_with_Spent_Target_Ta#65_electrical_check_on_SHC_2023-11-07.pdf
  2499   Tuesday, November 07, 2023, 13:55 Frank SongITEStandard OperationTM4Ta#65module disconnection

TM4 with spent target Ta#65 was disconnected in ITE and moved to SHC.

Attachment 1: TM4_with_Spent_Target_Ta#65_disconnection_in_ITE_2023-11-07.pdf
TM4_with_Spent_Target_Ta#65_disconnection_in_ITE_2023-11-07.pdf TM4_with_Spent_Target_Ta#65_disconnection_in_ITE_2023-11-07.pdf TM4_with_Spent_Target_Ta#65_disconnection_in_ITE_2023-11-07.pdf
ELOG V2.9.2-2455