  1778   Friday, September 07, 2018, 10:47 David WangITERepairTM4UCx24TM4 TP2 replacementTM4 TP2 could not be started  after
module was connected back to ITE on Sep 04th.
It was replaced with a new pump on Sep 05th.
  
  1792   Tuesday, September 25, 2018, 07:54 David WangConditioning StationRepairTM3 TM3 is connected for HV test at TCS.water loops are by passed on top. All bias,
EE, and  EL are tied together. Started
water system.
  
  1795   Wednesday, September 26, 2018, 07:14 David WangConditioning StationRepairTM3 TM3 HV test at TCS.I did a HV test on TM3 at TCS yesterday.
HV Ramp up speed: 1KV per 5 minutes when
below 30KV,1KV per 10 minutes from 30-36KV.
  
  1801   Tuesday, October 09, 2018, 12:32 David WangConditioning StationRepairTM4 TM4 steers 4 pin feedthrough CF flangeTM4 Steers 4 pin feedthrough CF flange
is replaced due an inside feed through insulator
broken. CF 25 cooper seal is replaced with
  
  1805   Monday, October 22, 2018, 14:05 Travis CaveITWRepair  Module move ITW Exit #2 has been moved from the
west station to the south hot cell for a
bellows repair.
  
  1807   Tuesday, October 23, 2018, 10:53 chad fisherSouth Hot-CellRepair  Exit 2 EastCover 1 was removed from the exit module.
Confirmed with David that the actuator rod
that needed to be disconnected was the far
 20181023_104541.jpg 
  1809   Thursday, October 25, 2018, 11:03 chad fisherSouth Hot-CellRepair  Exit 2 WestActuator arms, lemos, lemos and banana
plug block have been disconnected in preparation
for raising of the service tray. Aaron has
 8x 
  1811   Monday, October 29, 2018, 10:43 David WangConditioning StationRepair  ITW exit 2 leak check at TCS.I did a leak check this morning on exit
2 module at TCS. LD base  leak rate
is 4.00XE-9atm.cc/sec, Base pressure is 0.00
  
  1821   Wednesday, November 14, 2018, 16:10 Anders MjosITWRepairTM2UC#25ITW:FC5 safety signal troubleshootingMeasured resistance on safety limit switches
for FC5 on Exit Module 2. Determined that
the in connected signal did not work (shows
 2018-11-13_FC5.pdf 
  1824   Thursday, November 22, 2018, 08:55 Anders MjosITWRepairTM2UC#25ITW:FC5 safety signal limit switch installedYesterday Diagnostics group installed a
temporary external limit switch to provide
the in signal to the safety system.
 FC5_limit_switch.jpg 
  1826   Monday, November 26, 2018, 12:19 chad fisherNorth Hot-CellRepair  East ManipulatorIn preparation for removing the slave for
replacement I discovered that the timing
screw in the handle cable drum (master side)
 20181126_113326.jpg20181126_113338.jpg 
  1837   Friday, December 07, 2018, 08:47 chad fisherNorth Hot-CellRepair  North hot cell spare slave repairThe tong cable on the spare north hot cell
slave has been repaired. Slave came from
the factory with the tong cables straddling
 20181207_083906.jpg 
  1838   Friday, December 07, 2018, 10:37 chad fisherNorth Hot-CellRepair  Ariel connector testCompleted testing of connectors for Ariel
using the north hot cell.
Video can be found on docushare;
  
  1844   Thursday, January 03, 2019, 13:30 David WangITWRepair  ITH:MP1ITH:MP1 inlet pressure showed 10torr after
power outage during holiday. All ITE/W turbo-pumps
were tripped because of it. Removed one shielding
  
  1845   Thursday, January 03, 2019, 13:41 David WangCraneRepair  Target hall crane PLC issue.Target hall crane did not work properly
after power outage during Christmas time.
The only movement could be operated is crane
  
  1852   Wednesday, January 09, 2019, 13:29 David WangITWRepair  ITH:MP1ITH: MP1 has been replaced due to its poor
performance.  Its motor and power cable
are taken out and reused on new pump. Vacuum
  
  1863   Monday, January 28, 2019, 10:41 David WangConditioning StationRepairTM2 TM2 water lines helium pressure test at TCSleak detector base LR: 0.0Xe-9atm.cc/sec.
helium 70 psi. test time : 3 minutes for
each circuit.The results in atm.cc/sec are
  
  1870   Tuesday, February 19, 2019, 10:20 chad fisherSouth Hot-CellRepairTM2 Containment box removedContainment box has been removed from TM2
in preparation for source tray removal. I
will walk Aaron through removal of the optics
  
  1871   Tuesday, February 19, 2019, 11:56 chad fisherSouth Hot-CellRepairTM2 Optics tray removalAaron has removed the optics tray in TM2
in preparation for source tray removal.
  
  1872   Wednesday, February 20, 2019, 09:07 chad fisherSouth Hot-CellRepairTM2 Module side waterblock jigI have installed the module side water
block jig.
  