Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1792     Entry time: Tuesday, September 25, 2018, 07:54
Author: David Wang 
Category: Conditioning Station 
Type: Repair 
Module: TM3 
Target/Number:  
Subject: TM3 is connected for HV test at TCS. 

water loops are by passed on top. All bias, EE, and  EL are tied together. Started water system.

ELOG V2.9.2-2455