Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1852     Entry time: Wednesday, January 09, 2019, 13:29
Author: David Wang 
Category: ITW 
Type: Repair 
Module:  
Target/Number:  
Subject: ITH:MP1 

ITH: MP1 has been replaced due to its poor performance.  Its motor and power cable are taken out and reused on new pump. Vacuum group assembled them together, and installed the new pump. The new pump works fine.

ELOG V2.9.2-2455