Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1778     Entry time: Friday, September 07, 2018, 10:47
Author: David Wang 
Category: ITE 
Type: Repair 
Module: TM4 
Target/Number: UCx24 
Subject: TM4 TP2 replacement 

TM4 TP2 could not be started  after module was connected back to ITE on Sep 04th. It was replaced with a new pump on Sep 05th. The new pump works fine.

ELOG V2.9.2-2455