Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1821     Entry time: Wednesday, November 14, 2018, 16:10
Author: Anders Mjos 
Category: ITW 
Type: Repair 
Module: TM2 
Target/Number: UC#25 
Subject: ITW:FC5 safety signal troubleshooting 

Measured resistance on safety limit switches for FC5 on Exit Module 2. Determined that the in connected signal did not work (shows not connected irregardless of FC position). Confirmed proper operation of the OUT limit. See attachment for details. The Harp 5 x and y signal connectors were checked and reconnected.

Attachment 1: 2018-11-13_FC5.pdf  84 kB  | Show | Hide all
ELOG V2.9.2-2455