  ID Date Author Categorydown Type Subject Text Attachments
  45   Wednesday, February 27, 2013, 16:15 Keith C NgM9MaintenanceM9 Q1 Q2 removal, rad waste pit prepRadioactive waste pit uncovered, red barrel
with unknown contents taken out for assessment.
R. Ralea from RPG determined barrel was too
  
  46   Friday, March 01, 2013, 15:28 Keith C NgM9MaintenanceRadadioactive Waste Pit OrganizingSuccessfully stacked old m20 q2 q2 magnet
assembly on top of old M9 Q1 Q2 magnet and
M11 septum magnet. See photos.
 20130301_radwastepit_P1020865.JPG20130301_radwastepit_P1020869.JPG20130301_radwastepit_P1020873.JPG 
  47   Monday, March 04, 2013, 16:48 Keith C NgM9MaintenanceM9 Q1 Q2 removal, preparationPreparing for M9 Q1,2 move:
1. Re-arranged/organized cables on
top of magnet.
 6x 
  48   Tuesday, March 05, 2013, 14:15 Keith C NgM9MaintenanceM9 Q1, 2 removalRemoved M9 Q1 Q2 from beam line 1A via
crane and transferred from beam line to radiation
waste storage.
 7x 
  49   Thursday, March 07, 2013, 08:35 Keith C NgM9RepairM9 T2 flange blank offWork on blank off of M9 T2 started: Cleared
away blocks making up bagging bunker. R.
Kuramoto took some initial photos of the
  
  50   Tuesday, March 12, 2013, 16:33 Keith C NgM9MaintenanceM9 T2 flange blank off, preparation Scraped M9 T2 flange, removed what little
indium was left on flange.
- Completed two passes, some indium
  
  51   Wednesday, March 13, 2013, 16:21 Keith C NgM9MaintenanceM9 T2 blanking off preparation 1. Re-scraped M9 T2 flange after reviewing
video of flange.
- Some indium remains on inside of
  
  53   Tuesday, March 26, 2013, 09:04 Keith C NgM9RepairM9 Q1Q2 void inspectionYesterday: did visual, video inspection
and still imaging of T2 M9 Q1Q2 void. G.
Morris came down to work site for visual
 20130325_t2m9q1q2void_RHB_5726.JPG20130325_t2m9q1q2void_RHB_5728.JPG20130325_t2m9q1q2void_RHB_5742.JPG 
  54   Tuesday, April 09, 2013, 16:41 Keith C NgM9MaintenanceT2 M9 exit port blank offBlanked off T2 M9 exit port with indium
seal blank off.
 
 20130409_t2m9blankoff_RHB_5782.JPG20130409_t2m9blankoff_RHB_5783.JPG20130409_t2m9blankoff_RHB_5784.JPG20130409_t2m9blankoff_RHB_5785.JPG 
  55   Wednesday, April 10, 2013, 16:20 Keith C NgM9RepairM9 T2 flange blank offContinued with work on T2 M9 exit port
and area; Vacuum started after 13:00 hours
(due to vacuum pump issues at T2). He leak
  
  56   Thursday, April 11, 2013, 15:43 Keith C NgM9RepairT2 M9 exit port temporary shieldingInstalled shielding stand (TSH0094) for
T2 M9 exit port as per drawing TSH0095; three
steel blocks in total were lowered into the
 10x 
  75   Monday, March 30, 2015, 16:10 Keith C NgM9RepairT2 area uncoveringStarted to uncover and create work space
around T2 M9 area, setup is mostly complete.
Some misc items to be craned into position.
  
  76   Wednesday, April 01, 2015, 16:07 Keith C NgM9MaintenanceT2 M9 area work1) Block and bridge setup is mostly complete
for T2 M9 sighting job. Waiting on approving
drawing TB22322 in order to continue with
  
  77   Tuesday, April 07, 2015, 08:27 Keith C NgM9Developmentm9 t2 alignment jobWork completed for Thursday:
1) Shielding filler blocks removed
from M9Q1Q2 hole. Highest field was 5mSv/h
 20150407_m9t2_P1030233.JPG 
  78   Tuesday, April 07, 2015, 16:09 Keith C NgM9Developmentm9 t2 alignment jobwork to prepare for installation of alignment
jigs on T2M9 and M9B1 continues:
1) Vented T2 volume and removed M9
  
  79   Wednesday, April 08, 2015, 14:18 Keith C NgM9Developmentm9 t2 alignment job1) Visual inspection of T2 M9 flange: no
obvious indium deposits on T2 flange knife
edge seen, left over indium from before 2013
 12x 
  80   Thursday, April 09, 2015, 17:20 Keith C NgM9Developmentm9 t2 alignment job1) Vented T2 and removed rubber seal blanking
plate, vacuum level appeared to be at normal
operating ranges prior to the indium seal
 20150409_m9t2_P1030246.JPG20150409_m9t2_P1030251.JPG20150409_m9t2_P1030256.JPG20150409_m9t2_P1030248.JPG 
  81   Friday, April 10, 2015, 16:25 Keith C NgM9Developmentm9 t2 alignment jobContinued with installation of target jigs:
1) Craned in equipment for alignment
group.
  
  82   Tuesday, April 14, 2015, 08:31 Keith C NgM9Developmentm9 t2 alignment jobYesterday:
1) Addressed mounting issue with
the 15" alignment jig: removed material
 20150414_m9t2_P1030289.JPG20150414_m9t2_P1030290.JPG20150414_m9t2_P1030295.JPG20150414_m9t2_P1030297.JPG 
  83   Thursday, April 16, 2015, 09:17 Keith C NgM9Developmentm9 t2 alignment jobYesterday (Apr 15):
1) Installed TB22265 on to M9 exit
port at 18:48 with no vacuum and left over
 9x 