  RH-Beamlines  Not logged in ELOG logo
Message ID: 76     Entry time: Wednesday, April 01, 2015, 16:07
Author: Keith C Ng 
Category: M9 
Type: Maintenance 
Subject: T2 M9 area work 

1) Block and bridge setup is mostly complete for T2 M9 sighting job. Waiting on approving drawing TB22322 in order to continue with installing sighting equipment.

2) He leak checked upstream of T2 and surrounding area. Appears to be a small leak at the M9T2 exit port through the blanking plate seal. Mode of failure undetermined at this time. Leak does not impact operation of beam line 1A according to vacuum group.