Subject: M9 T2 blanking off preparation  

1. Re-scraped M9 T2 flange after reviewing video of flange.

- Some indium remains on inside of counter bore of flange, indium hard to remove due to current tooling.

 

2. Installed rubber spring loaded blank off flange to prevent debris from entering M9 T2 port.

- Will be removed once Q1Q2 void is cleaned and indium blank off plate is tested and prepared for use.

 

3. Continued cleaning of M9 Q1Q2 void.

- Attempted to wipe residue from bottom dead center of B1 15"knife  flange.  Did not fully clean, R. Kuramoto observed a thick viscous residue, "like tar"

- Started vacuuming of M9 Q1Q2 void