Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Beamlines  Not logged in ELOG logo
Message ID: 53     Entry time: Tuesday, March 26, 2013, 09:04
Author: Keith C Ng 
Category: M9 
Type: Repair 
Subject: M9 Q1Q2 void inspection 

Yesterday: did visual, video inspection and still imaging of T2 M9 Q1Q2 void. G. Morris came down to work site for visual inspection, noticed and was concerned about a few of the shielding blocks that were "contacting" the T2 monolith. Of note are the known "crumbling blocks" directly North and West of the T2 monolith and the pointy shielding block (2MB2, DWG# D-3399) North of the monolith which sits on top of a crumbling block. It was not certain if these shielding blocks were touching the monolith but there was no visible gap. See photos.

20130325_t2m9q1q2void_RHB_5726.JPG20130325_t2m9q1q2void_RHB_5728.JPG

 

 

Also installed an aluminum sheet metal dust cover over open B1 15" flange. See photo.

20130325_t2m9q1q2void_RHB_5742.JPG

 

 

 

Photos are located on: \\trwindata\groups\remote handling\Photos\2013\2013_m9q1q2_void

Videos are located on: \\trwindata\groups\remote handling\Videos\2013\2013_m9q1q2_inspection

ELOG V2.9.2-2455