  70   Friday, February 20, 2015, 16:28 Keith C NgPrimary BeamlinesDevelopmentM13Q1Q2 vacuum box anchor (part of UCN work)Installed Q1Q2 pin drive and attempted
to align it to the vacuum box. Spent majority
of the day trying to align the pin drive/anchor.
  
  69   Tuesday, February 17, 2015, 16:02 Keith C NgPrimary BeamlinesDevelopmentM13Q1Q2 vacuum box anchor (part of UCN work)The replacement pin drive anchor (see TB22300)
for M13 Q1Q2 vacuum box lowered into initial
position. The original B1 base plate was
  
  68   Friday, February 13, 2015, 15:10 Keith C NgPrimary BeamlinesDevelopmentIVM3-IVQ4 indium joint section (WR #2686)Installed 4" indium seal at 1VM3 to
IVQ4. No real problems with installation.
 
 20150213_ucnbuild_IMG_1304.JPG20150213_ucnbuild_IMG_1305.JPG20150213_ucnbuild_IMG_1308.JPG 
  67   Thursday, February 12, 2015, 14:29 Keith C NgPrimary BeamlinesDevelopmentT1 M13Q1Q2 blank off workRemoved M13 B1 magnet from beam line without
issues, Q2 vacuum box is covered with bag
and vacuum box "extended" with
 20150212_ucnbuild_IMG_1266.JPG20150212_ucnbuild_IMG_1268.JPG20150212_ucnbuild_IMG_1271.JPG20150212_ucnbuild_IMG_1275.JPG 
  66   Wednesday, February 11, 2015, 16:46 Keith C NgPrimary BeamlinesDevelopmentT1 M13Q1Q2 blank off workwork continues on T1 M13 area for UCN.
- He leak checked T1 M13Q1 joint
(sealed with rubber) and surrounding uncovered
 vlcsnap-00010.jpgvlcsnap-00013.jpg20150211_ucnbuild_IMG_1258.JPG20150211_ucnbuild_IMG_1253.JPG 
  65   Tuesday, February 10, 2015, 16:15 Keith C NgPrimary BeamlinesDevelopmentT1 Q1Q2 blank off workRH beam line work for UCN continues at
T1.
- Attempted to scrape t1 flange,
 20150210_ucnbuild_IMG_1244.JPGvlcsnap-00014.jpg 
  64   Friday, February 06, 2015, 16:01 Keith C NgPrimary BeamlinesDevelopmentT1 M13Q1Q2 blank off workT1 M13Q1Q2 work continued:
- Removed T1 Q1 indium seal ring,
collapsed center vacuum box bellows using
 20150206_ucnbuild_IMG_1242.JPG20150206_ucnbuild_IMG_1241.JPG20150206_ucnbuild_IMG_1238.JPG20150206_ucnbuild_IMG_1236.JPG 
  63   Thursday, February 05, 2015, 16:06 Keith C NgPrimary BeamlinesDevelopmentT1 Q1Q2 blank off workWork continues on T1 M13Q1 joint:
- Discovered some sort of vacuum
box brace restricting the collapse of the
 20150205_ucnbuild_IMG_1229.JPG20150205_ucnbuild_IMG_1228.JPG20150205_ucnbuild_IMG_1225.JPG0temp_bellowsblocker.JPG 
  62   Wednesday, February 04, 2015, 16:12 Keith C NgPrimary BeamlinesDevelopmentUCN T1 shutdown workUCN T1 work continues:
- Retracted Q1 T1 pindrive, took
34.5 turns. Pins left bolted to T1 monument.
  
  61   Tuesday, February 03, 2015, 16:35 Keith C NgPrimary BeamlinesDevelopmentUCN T1 shutdown workRH bridge has been set up over T1 to Q1Q2
area, see images for radiation survey of
work area. Joint is still intact, work will
 INBOX)3363.jpegINBOX)33632.jpeg 
  60   Friday, January 23, 2015, 15:21 Keith C NgPrimary BeamlinesMaintenance1VQ4 joint section (WR #2686) 1VQ4 & 1VQ6 beamtube was installed
by UCN group. RH provisonally installed aluminum
indium carrier ring with no indium into joint
 20150123_ucnbuild_IMG_1197.JPG20150123_ucnbuild_IMG_1202.JPG20150123_ucnbuild_IMG_1205.JPG20150123_ucnbuild_IMG_1207.JPG20150123_ucnbuild_IMG_1209.JPG 
  59   Wednesday, January 14, 2015, 11:00 Keith C NgPrimary BeamlinesMaintenance1VQ4 & 1VQ6 beamtube removal (WR #2686)Disconnected and removed beam tube from
1VQ4, 5, 6.  
  
  57   Thursday, December 12, 2013, 14:21 Keith C NgPrimary BeamlinesRepairT2 suck tube active/contaminated water removalRemoved "suck tube" filled with
active/contaminated water from top of 1A
beam line blocks to meson extension hall
  
  56   Thursday, April 11, 2013, 15:43 Keith C NgM9RepairT2 M9 exit port temporary shieldingInstalled shielding stand (TSH0094) for
T2 M9 exit port as per drawing TSH0095; three
steel blocks in total were lowered into the
 10x 
  55   Wednesday, April 10, 2013, 16:20 Keith C NgM9RepairM9 T2 flange blank offContinued with work on T2 M9 exit port
and area; Vacuum started after 13:00 hours
(due to vacuum pump issues at T2). He leak
  
  54   Tuesday, April 09, 2013, 16:41 Keith C NgM9MaintenanceT2 M9 exit port blank offBlanked off T2 M9 exit port with indium
seal blank off.
 
 20130409_t2m9blankoff_RHB_5782.JPG20130409_t2m9blankoff_RHB_5783.JPG20130409_t2m9blankoff_RHB_5784.JPG20130409_t2m9blankoff_RHB_5785.JPG 
  53   Tuesday, March 26, 2013, 09:04 Keith C NgM9RepairM9 Q1Q2 void inspectionYesterday: did visual, video inspection
and still imaging of T2 M9 Q1Q2 void. G.
Morris came down to work site for visual
 20130325_t2m9q1q2void_RHB_5726.JPG20130325_t2m9q1q2void_RHB_5728.JPG20130325_t2m9q1q2void_RHB_5742.JPG 
  52   Wednesday, March 20, 2013, 08:59 Keith C NgPrimary BeamlinesDevelopmentT2 M9 off beamline activitiesYesterday:
Did vacuum testing on MK2 8"
indium blank off; installed w/indium on test
  
  51   Wednesday, March 13, 2013, 16:21 Keith C NgM9MaintenanceM9 T2 blanking off preparation 1. Re-scraped M9 T2 flange after reviewing
video of flange.
- Some indium remains on inside of
  
  50   Tuesday, March 12, 2013, 16:33 Keith C NgM9MaintenanceM9 T2 flange blank off, preparation Scraped M9 T2 flange, removed what little
indium was left on flange.
- Completed two passes, some indium
  