Message ID: 64     Entry time: Friday, February 06, 2015, 16:01
Author: Keith C Ng 
Category: Primary Beamlines 
Type: Development 
Subject: T1 M13Q1Q2 blank off work 

T1 M13Q1Q2 work continued:

- Removed T1 Q1 indium seal ring, collapsed center vacuum box bellows using pneumatic cylinders. The bellows restraint was able to be rotated slightly so that the cylinders could be retracted. The brace/restraint bar could only be rotated until the bar made contact with the electrical connectors on Q1.

- T1 Q1 pins driven back down to anchor Q1 vacuum box.

- Separated Q2 B1 joint: Q2 vacuum box spring eyes are still partially trapped. Vacuum box cannot fully retract due to the bar from the bellows bracing/restraint contacting the field plate on Q1 magnet. The joint will have to be manually separated with some other means.

 

20150206_ucnbuild_IMG_1242.JPG20150206_ucnbuild_IMG_1241.JPG20150206_ucnbuild_IMG_1238.JPG20150206_ucnbuild_IMG_1236.JPG