Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Beamlines  Not logged in ELOG logo
Message ID: 63     Entry time: Thursday, February 05, 2015, 16:06
Author: Keith C Ng 
Category: Primary Beamlines 
Type: Development 
Subject: T1 Q1Q2 blank off work 

Work continues on T1 M13Q1 joint:

- Discovered some sort of vacuum box brace restricting the collapse of the vacuum box when the air cylinders were actuated. Upon closer observation the air cylinders appear to work, unsure if the "retract" and "extend" port markings work as labeled.

- The brace appears not to be removable, further investigation of this piece is required.

 

20150205_ucnbuild_IMG_1229.JPG20150205_ucnbuild_IMG_1228.JPG20150205_ucnbuild_IMG_1225.JPG

 

- It is believed the piece is two plates attached to a ring surrounding the central bellows with a bar on the top to facilitate rotation of this blocking device.

0temp_bellowsblocker.JPG

 

 

ELOG V2.9.2-2455