Message ID: 67     Entry time: Thursday, February 12, 2015, 14:29
Author: Keith C Ng 
Category: Primary Beamlines 
Type: Development 
Subject: T1 M13Q1Q2 blank off work 

Removed M13 B1 magnet from beam line without issues, Q2 vacuum box is covered with bag and vacuum box "extended" with air off. Field is now 3000uSv @ 1/2m from the open vacuum box where B1 magnet was.

 

20150212_ucnbuild_IMG_1266.JPG20150212_ucnbuild_IMG_1268.JPG20150212_ucnbuild_IMG_1271.JPG20150212_ucnbuild_IMG_1275.JPG