Message ID: 69     Entry time: Tuesday, February 17, 2015, 16:02
Author: Keith C Ng 
Category: Primary Beamlines 
Type: Development 
Subject: M13Q1Q2 vacuum box anchor (part of UCN work) 

The replacement pin drive anchor (see TB22300) for M13 Q1Q2 vacuum box lowered into initial position. The original B1 base plate was able to rock when weight was placed upon it; A concrete block was used to counterweight the base while the new pin drive was being installed. The pindrive has not been adjusted into final position.