  ID Date Authordown Category Type Subject Text Attachments
  43   Friday, February 22, 2013, 17:27 Keith C NgM9RepairM9 Q1 Q2 removal, Q2 joint dissassemblyM9 Q2 15" pin drive was removed and
disconnected.
- Pin drive retention screw had to
 20130222_m9q1q2remove_P1020840.JPG20130222_m9q1q2remove_P1020832.JPG20130222_m9q1q2remove_P1020831.JPG 
  44   Monday, February 25, 2013, 16:37 Keith C NgM9MaintenanceM9 Q1 Q2 removal, Q2 seal disassemblyRemoved Q2 15" indium seal ring, discovered
seal contained rubber on both sides instead
of indium.
 7x 
  45   Wednesday, February 27, 2013, 16:15 Keith C NgM9MaintenanceM9 Q1 Q2 removal, rad waste pit prepRadioactive waste pit uncovered, red barrel
with unknown contents taken out for assessment.
R. Ralea from RPG determined barrel was too
  
  46   Friday, March 01, 2013, 15:28 Keith C NgM9MaintenanceRadadioactive Waste Pit OrganizingSuccessfully stacked old m20 q2 q2 magnet
assembly on top of old M9 Q1 Q2 magnet and
M11 septum magnet. See photos.
 20130301_radwastepit_P1020865.JPG20130301_radwastepit_P1020869.JPG20130301_radwastepit_P1020873.JPG 
  47   Monday, March 04, 2013, 16:48 Keith C NgM9MaintenanceM9 Q1 Q2 removal, preparationPreparing for M9 Q1,2 move:
1. Re-arranged/organized cables on
top of magnet.
 6x 
  48   Tuesday, March 05, 2013, 14:15 Keith C NgM9MaintenanceM9 Q1, 2 removalRemoved M9 Q1 Q2 from beam line 1A via
crane and transferred from beam line to radiation
waste storage.
 7x 
  49   Thursday, March 07, 2013, 08:35 Keith C NgM9RepairM9 T2 flange blank offWork on blank off of M9 T2 started: Cleared
away blocks making up bagging bunker. R.
Kuramoto took some initial photos of the
  
  50   Tuesday, March 12, 2013, 16:33 Keith C NgM9MaintenanceM9 T2 flange blank off, preparation Scraped M9 T2 flange, removed what little
indium was left on flange.
- Completed two passes, some indium
  
  51   Wednesday, March 13, 2013, 16:21 Keith C NgM9MaintenanceM9 T2 blanking off preparation 1. Re-scraped M9 T2 flange after reviewing
video of flange.
- Some indium remains on inside of
  
  52   Wednesday, March 20, 2013, 08:59 Keith C NgPrimary BeamlinesDevelopmentT2 M9 off beamline activitiesYesterday:
Did vacuum testing on MK2 8"
indium blank off; installed w/indium on test
  
  53   Tuesday, March 26, 2013, 09:04 Keith C NgM9RepairM9 Q1Q2 void inspectionYesterday: did visual, video inspection
and still imaging of T2 M9 Q1Q2 void. G.
Morris came down to work site for visual
 20130325_t2m9q1q2void_RHB_5726.JPG20130325_t2m9q1q2void_RHB_5728.JPG20130325_t2m9q1q2void_RHB_5742.JPG 
  54   Tuesday, April 09, 2013, 16:41 Keith C NgM9MaintenanceT2 M9 exit port blank offBlanked off T2 M9 exit port with indium
seal blank off.
 
 20130409_t2m9blankoff_RHB_5782.JPG20130409_t2m9blankoff_RHB_5783.JPG20130409_t2m9blankoff_RHB_5784.JPG20130409_t2m9blankoff_RHB_5785.JPG 
  55   Wednesday, April 10, 2013, 16:20 Keith C NgM9RepairM9 T2 flange blank offContinued with work on T2 M9 exit port
and area; Vacuum started after 13:00 hours
(due to vacuum pump issues at T2). He leak
  
  56   Thursday, April 11, 2013, 15:43 Keith C NgM9RepairT2 M9 exit port temporary shieldingInstalled shielding stand (TSH0094) for
T2 M9 exit port as per drawing TSH0095; three
steel blocks in total were lowered into the
 10x 
  57   Thursday, December 12, 2013, 14:21 Keith C NgPrimary BeamlinesRepairT2 suck tube active/contaminated water removalRemoved "suck tube" filled with
active/contaminated water from top of 1A
beam line blocks to meson extension hall
  
  59   Wednesday, January 14, 2015, 11:00 Keith C NgPrimary BeamlinesMaintenance1VQ4 & 1VQ6 beamtube removal (WR #2686)Disconnected and removed beam tube from
1VQ4, 5, 6.  
  
  60   Friday, January 23, 2015, 15:21 Keith C NgPrimary BeamlinesMaintenance1VQ4 joint section (WR #2686) 1VQ4 & 1VQ6 beamtube was installed
by UCN group. RH provisonally installed aluminum
indium carrier ring with no indium into joint
 20150123_ucnbuild_IMG_1197.JPG20150123_ucnbuild_IMG_1202.JPG20150123_ucnbuild_IMG_1205.JPG20150123_ucnbuild_IMG_1207.JPG20150123_ucnbuild_IMG_1209.JPG 
  61   Tuesday, February 03, 2015, 16:35 Keith C NgPrimary BeamlinesDevelopmentUCN T1 shutdown workRH bridge has been set up over T1 to Q1Q2
area, see images for radiation survey of
work area. Joint is still intact, work will
 INBOX)3363.jpegINBOX)33632.jpeg 
  62   Wednesday, February 04, 2015, 16:12 Keith C NgPrimary BeamlinesDevelopmentUCN T1 shutdown workUCN T1 work continues:
- Retracted Q1 T1 pindrive, took
34.5 turns. Pins left bolted to T1 monument.
  
  63   Thursday, February 05, 2015, 16:06 Keith C NgPrimary BeamlinesDevelopmentT1 Q1Q2 blank off workWork continues on T1 M13Q1 joint:
- Discovered some sort of vacuum
box brace restricting the collapse of the
 20150205_ucnbuild_IMG_1229.JPG20150205_ucnbuild_IMG_1228.JPG20150205_ucnbuild_IMG_1225.JPG0temp_bellowsblocker.JPG 