174
|
Wednesday, January 14, 2015, 13:46 |
Anders Mjos | Empty | | | Maintenance | Pumping down for water leak test | Wednesday, January 14, 2015, 13:46:
Roughing
Wednesday, January 14, 2015, 14:57: |
|
|
175
|
Thursday, January 22, 2015, 14:21 |
Anders Mjos | Empty | | | Problems resolved | CG1A replaced | See previous e-log entry
for details |
|
|
265
|
Tuesday, December 01, 2015, 11:35 |
Anders Mjos | Empty | 41077-5 | LP-SIS | In progress | Test#2: Measuring temp with thermocouple (away from centre) & 2C-IR | Data from thermocouple attached.
Raw data and Excel sheet with plot. |
|
|
281
|
Monday, March 14, 2016, 13:12 |
Anders Mjos | Ta | 41790-1 | LP-SIS | In progress | Ta#47 LP-SIS (with new center block) conditioning |
|
|
|
290
|
Tuesday, April 19, 2016, 09:28 |
Anders Mjos | Ta | 41790-1 | LP-SIS | Done | Ta#47 LP-SIS (with new center block) conditioning |
|
|
|
315
|
Thursday, August 18, 2016, 10:37 |
Anders Mjos | | | | Maintenance | New cooling lines for Heat Shield | Dan made a set of new cooling lines
for the Source Tray Heat Shield cooling yesterday.
No joints on the lines. Use same VCR fitting |
|
|
345
|
Monday, February 06, 2017, 11:17 |
Anders Mjos | | | | Problems resolved | IOC restart after power outagae | Dave Morris did a remote restart
of the IOC after the outage. Turbo pump started. |
|
|
352
|
Monday, March 13, 2017, 15:34 |
Anders Mjos | Ta | 41790-4 | LP-SIS | Done | Conditioning Ta#51 | Target container wrapped in 3x heat shield
foils and installed by JW
Monday, March 13, 2017, 15:33: |
|
|
366
|
Wednesday, May 10, 2017, 21:33 |
Anders Mjos | Empty | | TARGET BOAT | In progress | Conditioning Heat Shield for IGLIS UCx#20 - test stand is down |
|
|
|
472
|
Tuesday, November 26, 2019, 15:43 |
Anders Mjos | SiC | 42464-3 | HP-FEBIAD | Problems resolved | Water to vacuum leak on heat shield line | This morning, the vacuum responded to shutting
of the water of the heat shield circuit (leak
rate without pumping leveling out). The vacuum |
|
|
387
|
Tuesday, September 12, 2017, 13:08 |
Aaron Schmidt | | | | | Window shutter added | Tuesday, September 12, 2017, 12:00:
The coated back window was changed
to a shuttered window. |
|
|
406
|
Wednesday, April 25, 2018, 07:21 |
Aaron Schmidt | | | | Done | HS swap evap 2 | Wednesday, April 25, 2018, 07:05: TGHT
& TBHT off
Wednesday, April 25, 2018, 07:15: |
|
|
411
|
Friday, June 08, 2018, 08:33 |
Aaron Schmidt | | | | Problems resolved | Chiller tripped / Alarm | Alarm noted on passing Hot Lab. RPG notified,
no radiological hazards. ISAC ops contacted,
drop in DI water last night. |
|
|
412
|
Thursday, June 21, 2018, 11:38 |
Aaron Schmidt | Ta | 42218-9 | HP-SIS | Done | Conditioning Ta#56 | Ta#56 HP-SIS target description:
|
|
|
419
|
Tuesday, September 11, 2018, 10:47 |
Aaron Schmidt | | | | | Evap 2 step discrepancy | Tuesday, September 11, 2018, 10:45:
TGHT: 53.4 A TBHT: 57.75
Actual |
|
|
438
|
Tuesday, April 16, 2019, 13:40 |
Aaron Schmidt | | | | | Replace bottom insert on HS | Tuesday, April 16, 2019, 13:38: Replaced
the bottom insert on the heat shield.
Used small amount of isopropyl alcohol |
|
|
440
|
Tuesday, April 23, 2019, 13:55 |
Aaron Schmidt | Ta | 43044-4 | LP-SIS | In progress | Conditioning Ta#58 | Ta#58 LP-SIS |
|
|
443
|
Tuesday, May 14, 2019, 13:57 |
Aaron Schmidt | | | LP-FEBIAD | Done | Test FEBIAD | Tuesday, May 14, 2019, 13:56: Removed
old HS w/ flexible lines & swapped in
the FEBIAD. (HS waterlines are still purged.) |
|
|
444
|
Tuesday, May 21, 2019, 14:34 |
Aaron Schmidt | | | | | HS swap to EVAP 2 flex line. | Tuesday, May 21, 2019, 14:33: Install
flexible line evap 2 HS. |
|
|
457
|
Monday, September 16, 2019, 14:50 |
Aaron Schmidt | Ta | 44062-5 | LP-SIS | In progress | Conditioning Ta#59 | Ta#59 LP-SIS |
|