ID |
Date |
Author |
Target Material |
Target Oven W.O# |
Source |
Status |
Subject |
Text |
 |
64
|
Wednesday, March 13, 2013, 16:08 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | Thermal test | Wednesday, March 13, 2013
Thermocouple channels (see attached
PDF for photos) |
|
65
|
Thursday, March 14, 2013, 12:27 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | CTL thermal test 3 (w/o CTL block) | Thursday, March 12, 2013
The CTL was removed and target heated
to 580A / 300A |
 |
68
|
Friday, April 19, 2013, 15:27 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | CTL test | Target installed with 4 T/C
The target assembly is ITD0300 with
the CTL Cu cooling block slightly modified. |
|
70
|
Tuesday, April 23, 2013, 10:11 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | CTL test |
|
  |
71
|
Tuesday, April 30, 2013, 11:20 |
Anders Mjos | Empty | 38481-5 | HP-FEBIAD | Done | CTL thermal test | CTL block on T/C F/T Ch 1
Supply on Ch 3
HS Return on Ch 4 |
  |
92
|
Tuesday, October 29, 2013, 15:50 |
Anders Mjos | | | | In progress | Copper bars on TGHT and TBHT | Tuesday, October 29, 2013, 15:50:
Pumping down
Wednesday, October 30, 2013, 09:32: |
|
93
|
Friday, November 01, 2013, 17:20 |
Anders Mjos | | | | Problems | Backing pump needs new filter | The source of the poor vacuum in the backing
line seems to be related to a dirty filter.
We will try to find a replacement filter |
|
94
|
Monday, November 04, 2013, 14:02 |
Anders Mjos | | | | Maintenance | Backing pump replaced |
|
|
96
|
Thursday, November 07, 2013, 09:38 |
Anders Mjos | | | | Problems resolved | Heat Shield cooling line twisted | See attached photo.
The Heat Shield has been taken to
the Machine Shop for repair. |
 |
120
|
Friday, March 07, 2014, 10:34 |
Anders Mjos | | | | Problems resolved | TGHT2 water flow signal | There was no signal going from the coils
to the PLC. After manipulating the connection
points on the coil a signal could again be |
|
161
|
Friday, October 03, 2014, 13:02 |
Anders Mjos | Empty | | | Maintenance | Broken insulators |
|
 |
174
|
Wednesday, January 14, 2015, 13:46 |
Anders Mjos | Empty | | | Maintenance | Pumping down for water leak test | Wednesday, January 14, 2015, 13:46:
Roughing
Wednesday, January 14, 2015, 14:57: |
|
175
|
Thursday, January 22, 2015, 14:21 |
Anders Mjos | Empty | | | Problems resolved | CG1A replaced | See previous e-log entry
for details |
|
265
|
Tuesday, December 01, 2015, 11:35 |
Anders Mjos | Empty | 41077-5 | LP-SIS | In progress | Test#2: Measuring temp with thermocouple (away from centre) & 2C-IR | Data from thermocouple attached.
Raw data and Excel sheet with plot. |
   |
281
|
Monday, March 14, 2016, 13:12 |
Anders Mjos | Ta | 41790-1 | LP-SIS | In progress | Ta#47 LP-SIS (with new center block) conditioning |
|
|
290
|
Tuesday, April 19, 2016, 09:28 |
Anders Mjos | Ta | 41790-1 | LP-SIS | Done | Ta#47 LP-SIS (with new center block) conditioning |
|
 |
315
|
Thursday, August 18, 2016, 10:37 |
Anders Mjos | | | | Maintenance | New cooling lines for Heat Shield | Dan made a set of new cooling lines
for the Source Tray Heat Shield cooling yesterday.
No joints on the lines. Use same VCR fitting |
|
345
|
Monday, February 06, 2017, 11:17 |
Anders Mjos | | | | Problems resolved | IOC restart after power outagae | Dave Morris did a remote restart
of the IOC after the outage. Turbo pump started. |
|
352
|
Monday, March 13, 2017, 15:34 |
Anders Mjos | Ta | 41790-4 | LP-SIS | Done | Conditioning Ta#51 | Target container wrapped in 3x heat shield
foils and installed by JW
Monday, March 13, 2017, 15:33: |
|
366
|
Wednesday, May 10, 2017, 21:33 |
Anders Mjos | Empty | | TARGET BOAT | In progress | Conditioning Heat Shield for IGLIS UCx#20 - test stand is down |
|
|