Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 13 of 25  Not logged in ELOG logo
Entry  Monday, March 18, 2019, 15:58, Darwin Ortiz Rosales, ZrC, 43044-5, LP-SIS, Done, Sintering ZrC IMG_3070.JPGIMG_3066.JPG

Monday, March 18, 2019, 15:51

Total number of foils: 555

Total mass of material including graphite foils: 478 grams

Total length packed 14.2 cm

container has 3 Ta heat shields.

No endcaps inserted to facilitate outgassing

Two TaC coated Ta wire springs inserted at either end to allow for ZrC expansion.

5 extra foils tucked beneath each spring for QC; total mass (10 discs) =1.0160 g

Desired temp = 1900 C, Auto ramping TGHT at  0.1 A/min to reach 280A A (Omega slope set = 0.990, approx 1400 C, Elog#427),  TGHT will be tapped up accordingly to reach desired temperature. 

TBHT will be set fixed at 230A (max). TBHT at 0.1 A/min to reach 230A.

Good vac at 3.00-5 Torr

Bad vac at 5.0e-5 Torr.

Currently being pumped down.


 Tuesday, March 19, 2019, 08:57

Current pressure IGP1 = 5.24e-07 Torr

Manually tapping to 40A on TBHT and TGHT

At 20 A IGP1 pressure trending up.  Will leave at 20A until trending down.

Pressure @ 20 A set, peaked ~1.8e-06 Torr after 1 hour


Tuesday, March 19, 2019, 10:32

Tapping manually to 50 A on TBHT and TGHT while monitoring IGP1 pressure

Tapped to 25 A and IGP1 pressure trending up.  Will allow to stabilize.

Tuesday, March 19, 2019, 11:34

Pressure stabilized at ~3.25e-06 Torr

Tapped up to 30 A on both TGHT and TBHT

Pressure stabilized at ~6.6e-06

Tapped up to 34A on both TGHT and TBHT

Pressure stabilized at ~1.2e-05 Will allow to drop before proceeding


 Tuesday, March 19, 2019, 13:43

Tapped up to 40A waiting for pressure to stabilize

Pressure shot up ~8.5e-05, therefore tapped down TGHT to 35A (At 35A TGHT current value fluctuates, probably better to ramp up to 36A)

Will let pressure drop before proceeding with TGHT heating

Ramped TGHT to 36A, IGP1 pressure still trending down and current measurements stable.

 Starting autoramp at 0.3A/min for both TGHT and TBHT until 280A and 230A respectively

Initial TGHT Current: 33.6A, 0.05V

Initial TBHT Current: 38.6A, 0.48V

IGP1 = 4.9e-05 Torr


Wednesday, March 20, 2019, 09:41

 TGHT has only ramped to 45.7 A, 0.085V

TBHT has only ramped to 50.2A, 0.62V

IGPI pressure ~4.0 e-5 Torr

Stopping ramp and monitoring pressure to see if it drops appropriate levels.

 


Wednesday, March 20, 2019, 14:10  

IGP1 pressure = 7.6e-06 Torr

TGHT 47.7Z, 0.16V

TBHT 50.1A, 0.63V

Autoramp at 0.1A/min both TGHT and TBHT to 280A and 230A respectively.


 Thursday, March 21, 2019, 08:12

IGP1 = 3.1e-05 Torr

TGHT = 51.4 A, 0.18V

TBHT=61.9A, 0.87V

Stopped autoramp

Manually ramping TGHT and TBHT while monitoring pressure

 Rampted up TGHT to 54A (reading 65 A), 0.5V and TBHT to 68A, 0.9V

Allowing pressure to stabilize


Manually tapped TGHT to 80A, .81V

Manually tapped TBHT to 90A, 1.3V

IGP1 = .0002 Torr

Will leave over night to allow pressure to drop


Friday, March 22, 2019, 08:17

IGP1 = 6.6e-06

TGHT = 88.8A, 0.81V

TBHT = 90.1A, 1.3V

Will manually tap ~100A on both TBHT and TGHT

Friday, March 22, 2019, 12:18

IGP1 = 1.28e-05 Torr

TGHT = 100.9A, 1.0V

TBHT = 101.2A, 1.5V

will allow pressure to drop slightly the autoramp at 0.1A/min for both TGHT and TBHT until 280A and 230A respectively


Friday, March 22, 2019, 14:51

IGP1= 7.4 e-06 Torr

TGHT = 100.8A, 1.0V

TBHT= 101.5A, 1.5V

Started autoramp at 0.1A/min for both TGHT and TBHT until 280A and 230A respectively


Tuesday, March 26, 2019, 08:18

IGP1 oscillated around ramping trip point 3.0e-05 while current slowly ramped to 280A (reached sometime during the night).

IGP1= 7.8e-06 Torr

TGHT= 283.4A, 4.2V

TBHT= 233.1A, 4.1V

Will continue ramp TGHT @0.2A/min up to 400A  (Omega slope set = 0.990, approx 1800 C, Elog#427)


Wednesday, March 27, 2019, 09:39

Target has been at 400A, OMEGA ~1400C since ~7pm of previous evening

TGHT = 400.2A, 6.45V

TBHT= 233.1A, 4.16V

IGP1= 3.1e-07 Torr

Autoramp TGHT to440A @0.2A/min

 Stopped autoramp at TGHT = 427.4 A and 7.00V, OMEGA= 1492 C

Wednesday, March 27, 2019, 14:14

Restarted TGHT autoramp @.2A/min up to 440A


Friday, March 29, 2019, 12:06

Changed OMEGA slope to 1.09 after checking with the analog pyrometer

IGP1 = 1.65e-07 Torr

TGHT = 441.3A, 7.5V

TBHT= 233.0A, 4.2V

Tapping TGHT to 450A @ ~1A/min while monitoring pressure

TGHT remained at 451A, 7.8 V  and  TBHT at 233.2A, 4.2 V,  for 10.5 hours while OMEGA Temperature ~1810 C.

Ramp-down was initiated with IGP1 = 1.7e-07 Torr

Ramp rate = 2A/min for TGHT and 1/min for TBHT


 Monday, April 01, 2019, 08:53

TGHT = 0A, 0.05V

TBHT= 0.01A, 0V

IGP1= 4.05e-08 Torr

Unloading Target


Target Final weight = 473 g

% Mass of ZrC+C+organics lost = 14.20 % compared to 13.95% theoretical organics content.

Final weight of 10 discs = 0.9250 g

% mass lost on this discs = 13.66%

The tube was slightly bent along the short axis

The discs expanded but more towards one side (possibly due to discrepancy in spring strength).

 One protective graphite disc added to each end

One end cap on each end

Entry  Wednesday, March 13, 2019, 15:43, Marla Cervantes, , 43630-6, , Done, Graphite insert test #4 

 Wednesday, March 13, 2019, 15:41

An uncoated tantalum tube was loaded with a graphite insert (with conical caps).

3 tantalum foils were wrapped around the tantalum tube and a Ta cap was added.

EVAP2 is currently pumping down

The tube will be hated for 5 days at 2000 C


Thursday, March 14, 2019, 10:07

IGP1 = 5.37e-7 Torr

The TGHT will be tapped manually to 50 A  

After aprox 1 hour IGP1 = 5.08e-7 Torr, TGHT=46.5 A, 0.224 V

Autoramp is set to 1A/min to 300 A

 Autoramp is set to 1A/min to 450 A

Autoramp was stopped at 425 A when 2000 C were achieved


 Sunday, March 17, 2019, 00:25

IGP1 = 2.03e-7 Torr

TGHT=424.2 A, 7.117 V, temp 1976 C


Sunday, March 17, 2019, 15:04 

IGP1 = 21.6e-7 Torr

TGHT=424.1 A, 7.085 V, temp 1967 C

cooling down -1 A/min

Entry  Thursday, March 07, 2019, 09:22, Darwin Ortiz Rosales, Empty, 40282-4, TARGET BOAT, Done, Transfer tube TaC coating (Legnaro) 

Thursday, March 07, 2019, 09:09

Transfer tube from Legnaro was coated with TaC.

The transfer tube was set in a tantalum boat and wrapped with 3 heat shields,

the legs of the transfer tube were let out of the shielding sheets.

Chamber pump down was started on Wednesday March 06, 2019.

Desired temperature TGHT = 1800 C, Omega slope set = 0.990.

IGP1= 4.48e-07 Torr

Will tap up TGHT manually to 40-50 A and monitor pressure.


 Thursday, March 07, 2019, 10:57

The TGHT current was left at 40 A for 50 min, the pressure achieved was 6.15e-7 Torr

The TGHT was rised to 45 A 11:00 am the pressure rised to 6.18e-7 Torr (11:10am)

The TGHT was rised to 50 A 11:10 am the pressure rised to 6.81e-7 Torr (11:32am)

auto ramp was set to 1 A/min to 300 A

Good vacuum 3e-5 Torr

Bad vaccum 5e-5 Torr

auto ramp was set to 1 A/min to 400 A

auto ramp was set to 1 A/min to 470 A

Final conditions TGHT = 485 A, 8.25V Temperature = 1800 C

The transfer tube stayed at 1800 C for 4 hours

auto ramp was set to -1 A/min to 0 A. 


Friday, March 08, 2019, 16:53 

EVAP2 was vented with air and the transfer tube was unloaded

Entry  Thursday, February 21, 2019, 09:15, Darwin Ortiz Rosales, Empty, 42464-4, HP-FEBIAD, Done,  190225EVAP2Trend.png190225EVAP2Trendb.png

Thursday, February 21, 2019, 09:01

Container coated with TaC and wrapped with 2 Ta heat shields.

Desired temperature= 1900 C, Omega Slope set = 0.990, Auto TGHT at 0.2A/min to reach 400A, TGHT will be tapped up accordingly to reach desired Temp.

TBHT will be set fixed at 230 A (max). 

Good vac at 3.00e -5 Torr

Bad vac at 5.00e-5 Torr

Chamber pump down was started on Wednesday February 20th; however, this morning IEVAP2:TP1 and IEVAP2:BV1 were found in the OFF position.

There are no abnormal sounds from the roughing pump.

IGP1= 5.6e-2 Torr

Will turn on IEVAP2:BV1 and IEVAP:TP1 from the hot lab and listen for anything out of the ordinary.


 Friday, February 22, 2019, 09:56

Pumped down to IGP1=2.1 e-07

Will tap up TGHT and TBHTmanually and monitor the pressure.


Friday, February 22, 2019, 11:20

Manually tapped up TGHT (V~ 0.90) and TBHT(V ~0.99) to 90A

maximum pressure reached ~7.4e-06 Torr and trended down


Friday, February 22, 2019, 11:25

Initiating Autoramp @ 0.2 A/min for TGHT to reach 450A and TBHT to reach 230A

Estimated temperature for TGHT ~1200 C
 


 Friday, February 22, 2019, 15:42

TGHT @ 145 A and TBHT @ 138A

Changed Autoramp to 0.1 A/min  so that it will take over the weekend to reach 450A and 230A for TGHT and TBHT respectively.


Monday, February 25, 2019, 08:29

IGP1=1.1e-07 Torr, TGHT= 451.4 A, 6.7 V, TBHT = 233.1 A, 3.1 V

Omega T = 1197 C

Will manually tap up by increasing TGHT current by ~1A/min monitoring pressure.   Will allow system to stabilize ~1400 C.


 Monday, February 25, 2019, 11:14

 Trend forcast 1400 C at TGHT= 566.75 A (Line plot attached)

Actual but not stable ~1445-1452 C at 566 A

Will continue to manually increase current monitoring pressure


 Monday, February 25, 2019, 12:33

Omega T= 1679 C , TGHT = 657.7A, 10.52 V, TBHT = 233.2 A, 3.2 V

IGP1 = 1.4e-05 Torr slightly trending up.

Autoramp @ 1 A/min to a maximum of TGHT 780 A. 


Monday, February 25, 2019, 14:43

IGP1= 3.7e-06 Torr trending down slightly, TGHT = 780.3 A, 12.9 V

Omega T = 1931 C


Monday, February 25, 2019, 15:14

manually tap up to TGHT to 790 A


Monday, February 25, 2019, 15:36

IGP1= 2.9e-6 Torr trending down

TGHT = 784.3 A, 13.01 V

TGHT current set to 790 A

Omega T = 1940 C

Will leave over-night


 Tuesday, February 26, 2019, 08:23

IGP1= 7.85e-07 Torr Stable

TGHT = 784.32 A, 12.54 V

TBHT = 233.3 A, 3.2 V

OMEGA T = 1948 C

Initiating Auto-cool ramp at 2.0A/min and 1.0A/min for TGHT and TBHT respectively.


Wednesday, February 27, 2019, 08:10

IGP1 = 3.3 e-08 Torr Stable

TGHT = 0A, 0.05V

TBHT = 0.02A, 0. V

Will begin vacuum release


 

Entry  Wednesday, February 13, 2019, 10:08, Darwin Ortiz Rosales, , 43630-1 , , Done, Graphite insert test 3b 

 Wednesday, February 13, 2019, 10:04

A previously coated tantalum tube with 3 layers of shielding (Details in e-log 426) was loaded with a graphite insert. 

The tube was loaded in evaporator 2 and pumped down

The graphite insert will be heated to 2000 C for 1 week

IGP1=1.37e-07 Torr


 Wednesday, February 13, 2019, 10:27

IGP1= 1.46e-07 Torr

Manual tapping to 40A on TGHT

TGHT 40.7A, 0.104V

Autoramp started at 1A/min up to 400 A

Good Vacuum = 3.00e-05, Bad Vacuum = 5.00e-05


 Thursday, February 14, 2019, 08:42

IGP1= 2.2e-07 Torr, T=1705 C, TGHT 401A, 6.7 V

Manually tapping to 2000 C (Slow ~1 A/min) in 5 A increments followed by waiting for equillibrium


Thursday, February 14, 2019, 10:54

IGP1 = 1.4e-06 Torr, T = 2003 C, TGHT 500A, 9.1 V

Waiting for equillibrium

manually tapped TGHT to 503A,  T = 2003 C

Will leave for 1 week


Wednesday, February 20, 2019, 08:44

 IGP1= 1.37e-07 Torr, T=1943 C, THGT= 503 A, 8.9 V

Ramp-down @ 2A/min

 


Wednesday, February 20, 2019, 14:02  

1 hour since TGHT = 0 A

Venting will proceed.


 

Entry  Thursday, February 07, 2019, 15:20, Darwin Ortiz Rosales, Empty, 43630-1, , Done, TaC coating/sintering 

Thursday, February 07, 2019, 14:12

Tantalum tube coated with TaC and wrapped with 3 layers of Ta heat-shielding.

Desired temperature= 1900 Celsius (expected TGHT ~445A/7.5V)

EVAP2 Currently pumped down, heating will be initiated tomorrow.


Friday, February 08, 2019, 08:46

Current pressure IGP1 = 3.46e-07 Torr

Manual tapping to 50A on TGHT

TGHT 47.43A, 0.26V

Waiting for pressure to stabilize.


Pressure was going down so current was increased manually to 65 A to induce the outgassing.

TGHT 73.9A, 0.67V

MAx pressure IGP1 = 4.41e-6 Torr

After approx 1 hour

TGHT = 0.70 V  74.1 A

IGP1 = 1.63 e-6 Torr

Autoramp was set to 2 A/min for final current of 350 A

 


 Friday, February 08, 2019, 13:43

Autoramp TGHT reached 350 A /5.47 V, current temperature at 1660 Celsius

IGP1 = 3.0e-06 Torr/coming down

Increase TGHT to 400 A autoramp at 2A/min


 Friday, February 08, 2019, 14:39

TGHT reached 413 A, 6.8 V, pressure at 1.9 e-06 Torr coming down

Continue to tap up TGHT to reach 1900 C


Friday, February 08, 2019, 14:56

TGHT manually increased to 428 A, 7.18V, pressure at 2.0e-06 Torr coming down slowly

Temperature at 1903 C

Will continue to heat at ~1900 C for four hours before cooling down


 Friday, February 08, 2019, 21:00

TGHT 7.21 V, 429.75 A, 1873 C

IGP1 6.77e-7 Torr

The heater ramp is set to -2 A/min to 0 A.

Entry  Wednesday, January 23, 2019, 13:06, Marla Cervantes, , 43630-2, , Done, Graphite insert test #3 

 Wednesday, January 23, 2019, 13:01

A previously coated tantalum tube with 3 layers of shielding (Details in e-log 426) was loaded with a graphite insert. 

The tube was loaded in evaporator 2 and pumped down

The graphite insert will be heated to 2000 C for 3 weeks


 Thursday, January 24, 2019, 10:04

Pressure = 3.66e-7 Torr

TGHT manually tapped to 45 A

Final pressure = 3.8e-7 Torr

Set autoramp to 350 A @ 2A/min

TGHT = 1643 C

Set autoramp to 400 A @ 2A/min

TGHT = 1790 C

Started to tapped manually at approx 5 A every 30 s

Final TGHT => 1896 C, 8.16 V, 480.46 A

The current will stay at 480 A until temperature stabilizes. 

The current was reduced to 476 A to stay at 1900 C


Friday, January 25, 2019, 17:16

Pressure = 3.22e-7 Torr

TGHT = 8.17 V, 477.65 A, 1882 C 


Monday, January 28, 2019, 09:09 

Pressure = 1.67e-7 Torr

TGHT = 8.07 V, 477.65 A, 1859 C 

The temperature readings are fluctuating between 1880 and 1859 C


Tuesday, January 29, 2019, 07:32

Pressure = 1.55e-7 Torr

TGHT = 8.17 V, 477.75 A, 1880 C 


Tuesday, January 29, 2019, 11:34

 Pressure = 1.55e-7 Torr

TGHT = 8.27 V, 477.56 A, 1897C 


Tuesday, January 29, 2019, 12:47 

 Pressure = 1.53e-7 Torr

TGHT = 8.19 V, 477.75 A, 1899C 


Tuesday, January 29, 2019, 13:38

 Pressure = 1.55e-7 Torr

TGHT = 8.25 V, 477.75 A, 1905C


Thursday, January 31, 2019, 16:12  

 Pressure = 1.40e-7 Torr

TGHT = 8.4 V, 476.81 A, 1918C


Thursday, January 31, 2019, 22:32

Pressure = 1.39e-7 Torr

TGHT = 8.37 V, 476.71 A, 1914C

The current will be ramped down @1 A/min


Friday, February 01, 2019, 09:58

 Last 22 A tapped to 0 manually

Tantalum tube was removed from the EVAP2

Entry  Friday, January 18, 2019, 15:11, Darwin Ortiz Rosales, Empty, 43044-5, LP-SIS, Done, TaC coating/sintering (training/online use)  

Friday, January 18, 2019, 15:00

Container was coated with TaC and wrapped with 3 Ta heat shields.

Desired temp = 1900 C, Omega slope set = 0.990, Auto ramping TGHT at 1A/min to reach 400A, TGHT will be tapped up accordingly to reach desired Temp.

TBHT will be set fixed at 230A (max). TBHT at 1A/min to reach 230A.

Good vac at 3.00-5 Torr

Bad vac at 5.0e-5 Torr.

Chamber is currently being pumped down.  Sintering will proceed next week.


 Monday, January 21, 2019, 10:17

Current pressure at IGP1 = 1.31e-7 Torr

Manual tapping to 50A on TBHT and TGHT

TBHT 38.75A, 0.41V

TGHT 37.5A, 0.07V

waiting for pressure to stabilize.

pressure  IGP1 8.0 e-7 Torr

Auto ramping TGHT at 1A/min to reach 400A, and TBHT at 1A/min to reach 230A.


 Tuesday, January 22, 2019, 09:34

TGHT reached 400A , 1800 C, however temperature dropped to 1785 C.

TGHT increased to 444A manually.  Temperature stabilized at 1880 C.  

After 10 hours, TGHT was ramped down @ 2A/min and TBHT @1A/min

Tuesday, January 22, 2019, 14:36: Evap 2 PS off. Turbo off (Around 14:10) Vented Evap 2 and removed the target container with Darwin. - AS.  

 

 

Entry  Wednesday, January 16, 2019, 11:53, Marla Cervantes, TaC, 43630-2, , Done, TaC coating/sintering for graphite insert test 

 Tuesday, January 15, 2018, 17:30

Tantalum tube was coated with TaC and wrapped with Ta heat-shield (3 layers)

Desired temp = 1900 C (expected TGHT ~445A/7.5V), TBHT will be set fixed at 230A (max).

EVAP2 currently pumping down.


 Pressure at IGP1 4.71 -7 Torr. 

Tapped up TGHT manually to 40 A

Waited ~1 hr for vacuum to stabilize.

IGP1 = 9.96-7 Torr

Good vac at 3.00e-5 Torr

Bad vac at 5.00e-5 Torr.

Initiating auto ramp for TGHT @ 1 A/min to a max set point of 350 A

Once max set points achieved, will tap up manually to final desired temperature of 1900 C


 Thursday, January 17, 2019, 15:31

The tube remained at ~1900 C for 6 hours.

IGP1=5.8e-7 Torr

TGHT = 427 A, 7.23 V

Min Temperature = 1890 C


Thursday, January 17, 2019, 15:33

 Auto-ramp set to TGHT 0 A @ -2 A/min. 

Entry  Thursday, December 20, 2018, 10:27, Marla Cervantes, , 43630-6, , Done, Tantalum tube heating 

Thursday, December 20, 2018, 10:24

A tantalum tube was loaded in evaporator 2 on Wednesday 19/Dec/2018.

It is going to be heated to 2000 C during 3 weeks 

Pressure IGP1 =  4.88e-7 Torr

TGHT manually tapped to 40 A

Autoramp set to 2 A/min on TGHT to 400 A aiming for 1800 C

The system tripped due to a power outage.

the current went from 57 to 0 A.

The tube did not show damage signs.


 This experiment will be postponed.
Entry  Thursday, November 22, 2018, 10:19, Marla Cervantes, , 43630-7 , , Done, Graphite insert test #2 

 Thursday, November 22, 2018, 10:12

A previously sintered tantalum tube with 3 layers of shielding was loaded with a graphite insert.

The tube was loaded in evaporator 2 on Wednesday 21/11/2018 and pumped down

The graphite insert will be heated to 2000 C


current pressure IGP1 =  4.2e-7 Torr

TGHT manually tapped to 40 A

Autoramp set to 2 A/min on TGHT to 400 A aiming for 1800 C


 Thursday, November 22, 2018, 17:13

TGHT 401.25 A, 6.79 V

Temperature 1780 C

IGP1 7.89e-7 Torr

Tapping manually to reach 1800 C, final current 407.2 A, 6.96 V


  Friday, November 23, 2018, 17:13

Tapped manually to TGHT 469.0 A, 8.64 V

Temperature 2019 C

IGP1 2.68e-7 Torr


Thursday, November 29, 2018, 08:03

TGHT 469.0 A, 8.945 V

Temperature 2061 C

IGP1 2.12e-7 Torr


 Tuesday, December 04, 2018, 07:53

TGHT 469.1 A, 8.814 V

Temperature 1983 C

IGP1 1.52e-7 Torr


Wednesday, December 05, 2018, 21:30

 TGHT 469.1 A, 8.75 V

Temperature 1983 C

IGP1 1.22e-7 Torr


Thursday, December 06, 2018, 12:25

 TGHT 468.9 A, 8.66 V

Temperature 1977 C

IGP1 1.42e-7 Torr


Friday, December 07, 2018, 17:59

  TGHT 468.9 A, 8.80 V

Temperature 1977 C

IGP1 1.42e-7 Torr


Wednesday, December 12, 2018, 12:18 

TGHT 469.2 A, 8.7 V

Temperature 1945 C

IGP1 1.10e-7 Torr


Thursday, December 13, 2018, 10:42

TGHT 469 A, 8.7 V

Temperature 1939 C

IGP1 1.04e-7 Torr

Ramping temperature down at -2 A/min


 Friday, December 14, 2018, 10:42

TGHT 0.0 A, 0.051 V

IGP1 4.36e-8 Torr

Entry  Monday, November 19, 2018, 12:57, Marla Cervantes, Empty, 43630-7, , Done, TaC coating/sintering for graphite insert test TaC-coatingPlot.JPG

 Monday, November 19, 2018, 08:57

Tantalum tube was coated with TaC and wrapped with Ta heat-shield (3 layers)

Desired temp = 1900 C (expected TGHT ~445A/7.5V), TBHT will be set fixed at 230A (max).

Pressure at IGP1 2.61-7 Torr. 

Tapped up TGHT and TBHT manually to 40 A

Waited ~1 hr for vacuum to stabilize.

IGP1 = 4.27e-7 Torr

Good vac at 3.00e-5 Torr

Bad vac at 5.00e-5 Torr.

Initiating auto ramp for TGHT @ 1 A/min to a max setpoint of 350 A

Once max setpoints achieved, will tap up manually to final desired temperature of 1900 C


Monday, November 19, 2018, 18:14

Temperature was 1755 C at 350 A

IGP1 = 9.28e-7 Torr

Tapped manually to 393 A (6.83 V)

IGP1 = 1.4e-6 Torr

Temperature 1904 C

The tube will stay at max current point overnight.


Tuesday, November 20, 2018, 08:17

 IGP1 = 9.28e-7 Torr

TGHT = 395 A, 6.98 V

Temperature 1903 C

Auto-ramp set to TGHT 0 A @ -2 A/min. 

Entry  Friday, November 02, 2018, 17:36, Marla Cervantes, Empty, 39530-1, LP-FEBIAD, Done, Graphite insert test #1 

 Friday, November 02, 2018, 17:33

A new LP-FEBIAD was coated and syntered (e-log 421 Evaporator_2) 

The container was loaded with an empty graphite insert.

Graphite insert mass = 24.1724 g

A current of 440 A TGHT and 230 A TBHT will be inputed to the container

EVAP2 currently pumping down


 Saturday, November 03, 2018, 08:04

IGP1 = 5.66e-7 Torr

Tapping manually to 40 A on TGHT and TBHT

Then auto/ramp wiill be set to 2 A/min on TGHT and 1 A/min on TBHT

Maximum temperature achieve 1802 C


 Tuesday, November 06, 2018, 14:49

Container has reduced and increased its temperature from ~1760 to 1802 C.

IGP1  3.44e-7 Torr

TGHT 441.7 A and 7.7 V

TBHT 233.2 A and 3.2 V


 Wednesday, November 07, 2018, 08:32

Temperature 1785 C

IGP1  2.90e-7 Torr

TGHT 441.38 A and 7.7 V

TBHT 233.2 A and 3.2 V


 Friday, November 09, 2018, 17:26

Temperature 1787 C

IGP1  2.12 -7 Torr

TGHT 442.03 A and 7.7 V

TBHT 233.06 A and 3.19 V


Tuesday, November 13, 2018, 14:13: Turbos, power supplies off. Prepare for venting. 

Entry  Wednesday, October 31, 2018, 19:35, Marla Cervantes, TaC, 39530-1, LP-FEBIAD, Done, TaC coating/sintering for graphite insert test Capture.JPGCoating.jpg

 Wednesday, October 31, 2018, 19:35

Container is coated with TaC and wrapped with Ta heat-shield (3 layers)

Desired temp = 1900 C (expected TGHT ~445A/7.5V), TBHT will be set fixed at 230A (max).

Chamber is currently being pumped down


 Thursday, November 01, 2018, 10:31

Pressure at IGP1 9.44e-7 Torr. 

Tapped up TGHT and TBHT manually to 40 A


Thursday, November 01, 2018, 12:32

Waited ~1 hr for vacuum to stabilize.

IGP1 = 1.42e-6 Torr

Good vac at 3.00-5 Torr

Bad vac at 5.0e-5 Torr.

Initiating auto ramp for TGHT @ 1 A/min to a max setpoint of 350 A

Initiating auto ramp for TBHT @ 0.5 A/min to a max setpoint of 230 A

Once max setpoints achieved, will tap up manually to final desired temperature of 1900 C


 Tapped manually to 445 A, Temperature 1896 C.


Friday, November 02, 2018, 07:35

TGHT 7.86 V 445.6 A

TBHT 3.22 V 233.3 A

IGP1 1e-6 Torr

Ramping down TGHT and TBHT to 0 A @ 2 A/min.  


Friday, November 02, 2018, 17:28

Monday, October 29, 2018, 12:39

Venting EVAP2, TaC coat sintering completed. 

Entry  Thursday, October 25, 2018, 15:37, Marla Cervantes, TaC, 43044-7, LP-SIS, Done, TaC coating/sintering for graphite insert test 181027-TaContainer-sintering.jpg

 Thursday, October 25, 2018, 10:36

Container is coated with TaC and wrapped with Ta heat-shield (3 layers)

Desired temp = 1900 C (expected TGHT ~445A/7.5V), TBHT will be set fixed at 230A (max).

Chamber is currently being pumped down


 Friday, October 26, 2018, 08:40

Pressure at IGP1 1.06e-6 Torr. 

Tapped up TGHT and TBHT manually to 40 A

Waited 1 hr for vacuum to stabilize.

IGP1 = 8.9e-6 Torr

Good vac at 3.00-5 Torr

Bad vac at 5.0e-5 Torr.

Initiating auto ramp for TGHT @ 1 A/min to a max setpoint of 350 A

Initiating auto ramp for TBHT @ 0.5 A/min to a max setpoint of 230 A

Once max setpoints achieved, will tap up manually to final desired temperature of 1900 C


 Friday, October 26, 2018, 10:46

At 62 A, the vacuum overpassed the "Bad vacuum " limit and the current reduced to 54 A.

when the pressure returned to the "Good vac" limit the ramping started automatically.


Friday, October 26, 2018, 16:59

TGHT= 450 A, Temperature = 1878 C

Ramping rate increased to 1A/min for the TBHT.

Tapped manually to 454 A, Temperature 1880 C.


Saturday, October 27 2018, 10:00 

Ramping down to 0 A @ 2 A/min.


Monday, October 29, 2018, 12:39

 Venting EVAP2, TaC coat sintering completed.

Entry  Tuesday, September 11, 2018, 10:47, Aaron Schmidt, , , , , Evap 2 step discrepancy  PS_Check.docx

 Tuesday, September 11, 2018, 10:45:

TGHT: 53.4 A   TBHT: 57.75

Actual

TGHT: 60.0A  TBHT: 59.0A

Uploaded the rest to Word doc. Screenshots included.

Entry  Monday, September 10, 2018, 15:09, Marla Cervantes, Empty, 42218-3, LP-IG-LIS, Done, TaC coating/sintering for UC target container  EVAP2-_01.JPGHeater-ramp.jpgPlot_400A-230A.jpgTempeature-at-400A.jpgTaC-coating.png

 Monday, September 10, 2018, 15:09

Container is coated with TaC and wrapped with Ta heat-shield ( 3 layers)

Desired temp = 1900 C (expected TGHT ~445A/7.5V), TBHT will be set fixed at 230A (max).

Good vac at 3.00-5 Torr

Bad vac at 5.0e-5 Torr.

Chamber is currently being pumped down


 Tuesday, September 11, 2018, 09:27

Pressure at IGP1 8.61e-7 Torr. 

Auto ramping TGHT at 1A/min to reach 400A, and TBHT at 1A/min to reach 230A.


 Tuesday, September 11, 2018, 12:05

Pressure increased to 6.9e-e5 Torr and auto-ramp reduced the current:

TGHT from 94.6 A to 84.86 A

TBHT from 87.8 A to 78.87 A

(see figure EVAP2-_01)

EPICS automatically started ramping up TBHT and TGHT current when the pressure was between the good limit.


 Tuesday, September 11, 2018, 14:29

TBHT current reached ~230 A and EPICS stopped inputting current automatically. 

TBHT current reading on:

EPICS 232.8 A

Power supply: 235 A


 Tuesday, September 11, 2018, 16:53

TGHT reached 400 A, EPICS stopped auto-ramping automatically. (Fig. Heater-ramp and Plot_400A-230A)

Temperature read by OMEGA 1837 C (Fig. Tempeature-at-400A)


 Tuesday, September 11, 2018, 17:40

TGHT current was increased manually to 419 A (power supply current 422 A, EPICS plot 421.6 A) in steps of ~5A/2min

The temperature after ~30 min of being at 419 A is 1898 C.

The container will stay 5 hours at 1898 C 


Wednesday, September 12, 2018, 09:05 

EVAP2 remained at max setpoints for 5hrs

Auto-cool was set to 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.

The automatic ramp decreased the TBHT current to 0A, but not so for TGHT, 

TGHT only reduced to 22 A, the TGHT was manually tapped to 0A


 Wednesday, September 12, 2018, 18:30

Process completed (fig. TaC-coating). 

Chamber was vented.

Entry  Tuesday, September 04, 2018, 17:04, John Wong, Empty, , LP-SIS, Problems, TaC coating/sintering for UC target container TGHT-Current_error.JPG

Tuesday, September 04, 2018, 16:58

Container is coated with TaC and wrapped with Ta heat-shield ( 3 layers)

Desired temp = 1900 C (expected TGHT ~445A/7.5V), TBHT will be set fixed at 230A (max).

Good vac at 3.00-5 Torr

Bad vac at 5.0e-5 Torr.

Chamber is currently being pumped down


 Wednesday, September 05, 2018, 10:53

Pressure at 9.5-7 Torr. 

Auto ramping TGHT at 1A/min to reach 400A, and TBHT at 1A/min to reach 230A.


 Wednesday, September 05, 2018, 17:52

Problem with TGHT readback vs setpoint.  TGHT ramped up to 400A, temp measured at 1830C.  However, the setup remained at 228A (see attachment).  The autoramping program only sees the readback; in this case, the TGHT would continue to keep ramping up until the target breaks.  The autoramping program has stopped just in time. 

TGHT stepped down to 400A (setpoint), readback at 206A/6.59V.  TGHT at 230A/4.16V.  Temperature holding at 1783C. 

Control has been informed.


 Thursday, September 06, 2018, 10:54

Target temp holding at 1773C.  Pressure at 8.5e-7 Torr. 

Ramping down TGHT and TBHT, and inspect the container later. 

Problem with the TGHT readback/setpoint will need to be investigated.


 Friday, September 07, 2018, 16:03

Target container is nicely sintered.

Awaiting for Control group to investigate with the problem on TGHT readback/setpoint. 


 

Entry  Monday, August 20, 2018, 18:10, John Wong, np-SiC, 43044-1, LP-SIS, Done, nano-SiC final conditioning 

Monday, August 20, 2018, 17:58

14.9 g of np-SiC fibrous target discs are loaded into the container (previously coated with TaC and sintered, see elog ID 414).

Total loaded length 9.5 cm. 

A 1.5" width graphite sheet is used as under layer to prevent TaC diffused to the discs; this was observed during the heat treatment, (see dropbox SEM images).

Both end caps are in.  With ionizer pointing out, right cap is expended BUT NOT left cap - will need to expend this after the conditioning.

No Ta heat-shield is used.

Final conditioning temperature:  1500 C (As per e-log 414, TGHT = 450A/7.31V, 3.28kW) 

Keeping TBHT at 0A for now - will ramp up after TGHT reach to the desired temperature. 

OMEGA slope set at 0.99

Good vac = 3.0e-5 Torr,

Bad vac = 5.0e-5 Torr.


 Tuesday, August 21, 2018, 10:24

Pressure at 1.2e-6 Torr. 

Initiated autoramping at 2A/min for TGHT to reach 400A - monitoring temp and vacuum.

TBHT set at 10A. 


 Tuesday, August 21, 2018, 15:13

Temp reached to 1350C. TGHT at 400A/6.7V. Pressure at 1.9e-6 Torr after holding at the temp for 100 min.


 Tuesday, August 21, 2018, 15:28

Tapped up TGHT to 450A/7.8V (3.5kW).  Temp measured at 1465 +/- 5 C.  Pressure coming down from 3.5 e-6 Torr.


 Tuesday, August 21, 2018, 15:32

Tapping up TBHT to 230A


 Tuesday, August 21, 2018, 16:25

TBHT at 230A/4.33V.  Pressure started to increase from 150A, and reached to 3.3e-6 Torr after TGHT reached to the setting.

Temperature measured at 1475 C +/- 5C.  Holding at this temperature until vacuum comes to stabilization (est.2-3 hours)


 Tuesday, August 21, 2018, 16:45

Checked with Mikron (slope set at 0.99); temp on left end-cap measured at 1490 +/- 20C (that's close enough).  Temp on ionizer tube about 1900C


 Tuesday, August 21, 2018, 22:12

Pressure at 1.7e-6 Torr.  Temp holding at 1480C, TGHT at 450/7.7V, TBHT 230A/4.27V.

Cooling down at 2A/min for TGHT and 1A/min for TBHT


 

Entry  Wednesday, July 25, 2018, 17:33, John Wong, Empty, 43044-2, LP-SIS, Done, TaC coating/sintering for UCx#24 

Wednesday, July 25, 2018, 17:32

Container is coated with TaC and wrapped with 3 layers of Ta heat-shields.

Desired sintering temperature ~1900 C, TGHT is estimated to be ~ 445A (3.3 kW), TBHT set to 230A (as usual).

OMEGA slope set to 0.99

Good vac = 3.0 e-5 Torr, Bad vac = 5.0 e-5 Torr.

Chamber is currently being pumped down.


 Friday, July 27, 2018, 10:32

Vacuum at 9.9 e-7 Torr. 

Autoramp TGHT at 1A/min to 300A and TBHT at 1A/min to 230A. Will monitor temp and adjust TGHT to reach the desire temp.


 Friday, July 27, 2018, 16:31

TGHT reached to 1500 C, and TBHT at 230A, Temp at 1480 C, pressure at 2.e-6 Torr.

Autoramp TGHt at 1A/min to 400A.  Continue monitoring temp.


 Saturday, July 28, 2018, 12:41

TGHT at 400A/6.2V. Temp at 1730 C.  Pressure 7.4 e-7 Torr.

Tapped up TGHT to 450A/7.2V, temp at 1891 C. Holding at this current... Pressure coming down from 1.2e-6 Torr.


 Monday, July 30, 2018, 22:40

Target temp has been held at 1880 C, TGHT at 450A/7.57V, TBHT 230/4.18V, vaccum at 3.8 e-7 Torr. 

Cooling TGHT and TBHT at 2A/min and 1A/min, respectively. 


 Tuesday, July 31, 2018, 10:23

TGHT/TBHT at 0A.  Pressure at 1.5e-7 Torr. 

Process completed. 

Venting chamber.

Target containers looks good.  Transferred to Ar glovebox.


 

ELOG V2.9.2-2455