  Evaporator_2, Page 12 of 35  Not logged in ELOG logo
ID Date Author Target Material Target Oven W.O# Source Status Subject
  470   Monday, November 25, 2019, 11:35 Aaron Schmidt   In progressFlex - line HS installed

 Leak noted on previous TaC sintering on HP FEBIAD # 42464-3.

Swapped out gaskets on HS flex line a re-tightened.

Monday, November 25, 2019, 11:31: Roughing.

Monday, November 25, 2019, 11:42: Turbo pump on. 

Monday, November 25, 2019, 13:38: Vacuum @ 7.29e-06T. 

Monday, November 25, 2019, 13:42: Waterlines opened. Vacuum slowly climbed to 7.57e-06T. Waterlines closed / purged. 

Monday, November 25, 2019, 13:47: Vacuum @ 6.83e-06T.

Monday, November 25, 2019, 13:50: Waterlines opened. Vacuum gradually climbed again. Waterlines closed / purged.

Monday, November 25, 2019, 13:51: Turbo pump off. 

Monday, November 25, 2019, 14:41: Vent. Check seals (All on HS line).

Monday, November 25, 2019, 14:48: Roughing. 

Monday, November 25, 2019, 15:06: Vacuum @ 1.22e-04T. Waterlines opened. Vacuum continued to pump down steadily to 8.86e-05T and dropping.

Monday, November 25, 2019, 15:07: Turbo pump off. 

  469   Saturday, November 23, 2019, 14:03 Darwin Ortiz RosalesTaC42464-3HP-FEBIADDoneTaC coating/sintering

12.3

Saturday, November 23, 2019, 14:00

Container coated with TaC and wrapped with 3 Ta heat shields.

Desired temperature= 1900 C, Omega Slope set = 0.990, Auto TGHT at 0.2A/min to reach 400A, TGHT will be tapped up accordingly to reach desired Temp.

TBHT will be set fixed at 230 A (max). 

Good vac at 3.00e -5 Torr

Bad vac at 5.00e-5 Torr

Chamber pump down was started on Friday November 22; however.

No leaks were observed when turning water lines on.

IGP1= 4.6e-07 Torr


 Saturday, November 23, 2019, 15:30

autoramp at 0.5A /min up to 50A for both TGHT and TBHT and maintained for 1 hour.


Saturday, November 23, 2019, 16:15

IGP1= 1.1e-06 Torr

Auto Ramp to 450 A on THGT and 230A on TBHT at 0.5A/min


Saturday, November 23, 2019, 23:44

IGP1= 5.2e-06 Torr

TGHT = 248A, 2.9V  TBHT= 233A 2.9V

Increased ramp step to 1A/min to 620 A


Sunday, November 24, 2019, 00:14

IGP1=1.9e-06 Torr

TGHT = 274.3, 3.3V   TBHT= 233A, 2.9V

 


Sunday, November 24, 2019, 07:33

IGP1=3.2e-06 Torr

OMEGA= 1490C

TGHT = 619 A, 9.1V   TBHT=233A, 2.9V

Continue ramping THGT at 1A/min to 700 A


Sunday, November 24, 2019, 10:05

IGP1= 2.1 e-05 Torr

OMEGA= 1676 C

TGHT= 700A, 10.6V   TBHT= 233A, 2.0V

Start autoramp to 780A as per regression in attachment


Sunday, November 24, 2019, 13:22

Autoramp to 795A  for TGHT


Sunday, November 24, 2019, 21:16

OMEGA= 1854 C

TGHT= 789.6A, 12.27V  TBHT= 233.A, 2.9V

IGP1= 2.0e-05

Will allow pressure to stabilize lower.


Sunday, November 24, 2019, 22:16

TGHTT= 789.6A, 12.3V TBHT=233.3A, 2.9V

OMEGA=1855C

IGP1 = 6.9e-06Torr

Start cooling TGHT at 2A/min and TBHT at 1A/min

Attachment 1: HPFIBIAD20191124.PNG
HPFIBIAD20191124.PNG
  468   Friday, November 22, 2019, 18:32 Fernando Maldonado & Marla Cervantes TaC HP-FEBIADIn progressTaC coating/sintering

 Friday, November 22, 2019, 18:18:

 

 

Friday, November 22, 2019, 18:18: Roughing

Friday, November 22, 2019, 18:23: Turbo on .

Friday, November 22, 2019, 18:32: Turbo at speed 

 

  467   Thursday, November 21, 2019, 08:10 Aaron SchmidtSiC HP-FEBIADIn progressTemperature mapping.

 Thursday, November 21, 2019, 08:09: PS on. Leak issue resolved (Evap 2 Elog 466). Vacuum @ 4.10e-07T.

Thursday, November 21, 2019, 08:15: Auto-ramping TGHT / TBHT @ 2 A per min to 300 / 150 A. 

  466   Friday, November 15, 2019, 13:26 Aaron SchmidtSiC HP-FEBIADProblems resolvedTemp map testing - 1. (Leak issue)

 HS 42752-5 - Setup for Temperature mapping.

Friday, November 15, 2019, 13:26: Roughing. 

Friday, November 15, 2019, 13:36: Turbo pump on. 


Monday, November 18, 2019, 07:46: Waterlines opened. Vacuum ok @ 3.56e-07T.

Monday, November 18, 2019, 07:48: PS on.

Monday, November 18, 2019, 09:21: PS off. Vacuum slowly spiked to 1.23e-06T. Indicative of a small water leak. 

Monday, November 18, 2019, 09:24: HS waterlines purged. vacuum dropped to 5.54e-07T. 

Monday, November 18, 2019, 09:27: Valves closed. TP off. BP off.

Monday, November 18, 2019, 10:27: Venting.

Monday, November 18, 2019, 11:06: Gaskets checked / replaced. Roughing. 

Monday, November 18, 2019, 11:14: turbo pump on. 

Monday, November 18, 2019, 14:19: Waterlines opened. 

Monday, November 18, 2019, 14:23: Response on vacuum. Leak is still present & a higher rate (Has an immediate response). Turbos off. 

Monday, November 18, 2019, 14:28: Venting. 

Monday, November 18, 2019, 14:49: turbo pump on. 


Tuesday, November 19, 2019, 07:07: Waterlines opened. Leak is present.  Turbo pump off. 

Tuesday, November 19, 2019, 11:24: After venting, changed 1 gasket. Setup LD & completed a leak check with the lines pressurized to 75 PSI of He. 

Tuesday, November 19, 2019, 11:25: Roughing. 

Tuesday, November 19, 2019, 11:33: Turbo pump on. 


Wednesday, November 20, 2019, 08:59: Waterlines opened. Leak is present.  Turbo pump off.  

Wednesday, November 20, 2019, 11:26: FEBIAD Removed. U-Line installed to check Evap 2 Connection. FEBIAD examined outside. 

Wednesday, November 20, 2019, 11:34: Turbo pump on. 

Wednesday, November 20, 2019, 13:05: HPA off (Was running through HS line still. Vac @ 5.54e-06T).  

Wednesday, November 20, 2019, 13:07: Open waterline. Vacuum @ 3.88e-06T & dropping steadily.  

Wednesday, November 20, 2019, 13:12: Vacuum @ 3.69e-06T & dropping. No leak detected via Vac. 

Wednesday, November 20, 2019, 13:14: Waterline Closed / purged. Turbo pumps off. 

Wednesday, November 20, 2019, 13:58: Turbo pump on. 

Wednesday, November 20, 2019, 13:50: Cleaned seal / FEBIAD re-installed. Roughing.


Thursday, November 21, 2019, 08:06: Waterlines opened. Vacuum ok @ 4.10e-07T. 

Notes:

1) The FEBIAD left cooling line was the culprit for the leaks. A fine copper build up was noted on the gasket /  sealing face. Images included. 

2) Evap 2 was leak checked separately as well & is OK.

Attachment 1: Test_FEBIAD_2019_-_Nov_-_Leak.docx
Attachment 2: Evap_2_cooling_-_1.jpg
Evap_2_cooling_-_1.jpg
Attachment 3: Test_FEBIAD_Left_HS_cooling_line_-_1.jpg
Test_FEBIAD_Left_HS_cooling_line_-_1.jpg
Attachment 4: Test_FEBIAD_Left_HS_cooling_line_-_2.jpg
Test_FEBIAD_Left_HS_cooling_line_-_2.jpg
  465   Monday, November 04, 2019, 14:25 Darwin Ortiz RosalesEndcaps40282-4TARGET BOATDone 

Monday, November 04, 2019, 14:19 

Each endcap is separated with a disc of graphite foil and rolled into packs one pack of 4 and one pack of 8 within a foil envelope in a target boat.

There are also 3 coated springs interspersed.

The boat is wrapped with 3-layers of Ta heatshields.

Chamber pumped down overnight.

OMEGA slope = 0.99

Will Tap TGHT up to 40 A then autoramp to 400A at 1A/min.

Final desired temperature on OMEGA (tap)= 1800C


 Tuesday, November 05, 2019, 11:30

IGP1 = 9.6e-7 Torr

Autoramp TGHT to 40A at 1A/min


Tuesday, November 05, 2019, 11:44

IGP1= 2.6e-06 Torr

TGHT = 40.8 A, 0.37V

Will leave at 40 A for 1 hour


 Tuesday, November 05, 2019, 12:39

 IGP1=2.5e-6 Torr

TGHT =40.0A, .33V

Start ramping TGHT to 400A at 0.1A/min


Wednesday, November 06, 2019, 09:32

IGP1=7.8e-7 Torr

TGHT = 168.4A, 2.38V

increase ramp speed to 1A/min


 Wednesday, November 06, 2019, 14:07

IGP1= 2.34e-6 Torr

TGHT=400.0 A, 6.98V

set TGHT autoramp to 460A @ 1A/min aiming for 1850C (see attached plot)

 


Wednesday, November 06, 2019, 15:18

OMEGA = 1776 C

TGHT = 460.0A, 8.52V

IGP1= 4.7e-6 Torr

Starting manual tap up to 1810C


Wednesday, November 06, 2019, 15:36

OMEGA=1810 C

TGHT = 468.8A, 8.74V

IGP1=4.14e-6


Wednesday, November 06, 2019, 19:04

OMEGA=1822 C (has been between 1817-1824 C over 3.5 hours )

TGHT=468.8A, 8.67V

IGP1=1.9498e-06 Torr

Start TGHT ramp down at -2A/min


Thursday, November 07, 2019, 09:55

THGT = 0A, 0V overnight

IGP1= 3.2 e-07 Torr

Proceeding with unloading.


End caps looked good for online use.

 

Attachment 1: Nov4CapCoating.PNG
Nov4CapCoating.PNG
  464   Thursday, October 17, 2019, 13:53 Darwin Ortiz RosalesTaC44062-3LP-SISIn progressTaC coating/sintering

Thursday, October 17, 2019, 12:00

Ta tube was coated with TaC and wrapped with Ta heat-shields (3 layers)

Desired temperature= 1900 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max).

Evap 2 was pumped down on the previous night.

Good vacuum= 3.00 e-5 Torr

Bad vacuum = 5.00 e-5 Torr

Ramped TGHT and TBHT to 40A at 0.5A/min

Initial IGP1= 7.0 e-07 Torr


Thursday, October 17, 2019, 13:53

After pressure stabilization at 40A:

 Autoramp TGHT and TBHT at 1A/min to 400A and 230A respectively.


 Friday, October 18, 2019, 6:20

TGHT = 400A, 6.52V, TBHT= 233A, 4.1V

OMEGA = 1733C

Start autoramp to 430A on TGHT at 1A/min


Friday, October 18, 2019, 7:05

TGHT= 431A, 7.1V

TBHT= 233A, 4.1V

IGP1= 1.13e-06 Torr

OMEGA = 1828 C

Set autoramp to 465 at 1A/min


Friday, October 18, 2019, 11:13

TGHT = 465A, 7.8V, TBHT = 233A, 4.1V

OMEGA = 1865C

(Something is different with the heat dissipation on this target.  Will leave at this current and start cooling at 1200 noon to avoid container strain)


 Friday, October 18, 2019, 12:00

TGHT = 462.7A, 7.8V

TBHT= 233.4A, 4.1V

OMEGA = 1863C

IPG1= 1.02e-06 Torr

Commence cooling at -2A/min for TGHT and -1A/min for TBHT


 Monday, October 21, 2019, 09:11

Pump down and dismount.

 

  463   Tuesday, October 08, 2019, 14:16 Aaron SchmidtSiC HP-FEBIADIn progressTemp measurements.

Tuesday, October 08, 2019, 14:14: Remove Flex line HS. 

HS: 42752-1

Waterlines not open yet.

Tuesday, October 08, 2019, 14:15: roughing.

Tuesday, October 08, 2019, 14:24: Turbo pump on. 

Tuesday, October 08, 2019, 14:32: TP @ speed. 


Wednesday, October 09, 2019, 13:24 

The initial pressure was 3.25e-7 Torr

The current was manually increased to 25 A on both TBHT and TGHT  at a rate of 1 A each 30 s for both heaters.


Wednesday, October 09, 2019, 13:33

At 1 pm an additional ram was made to TGHT 350 A and TBHT 200 at same rate.

  462   Monday, October 07, 2019, 09:18 Darwin Ortiz RosalesTaC TARGET BOATIn progressSintering TaC coating on endcaps and springs

Friday, October 04, 2019, 11:37

Each endcap is separated with a disc of graphite foil and rolled into packs of 5 within a foil envelope in a target boat.

There are also 3 coated springs, one in between endcaps and two on either end

The boat is wrapped with 2-layers of Ta heatshields.

Chamber pumping down

OMEGA slope = 0.99

Will Tap TGHT up manually to 40 A then autoramp to 400A at 1A/min.

Final desired temperature on OMEGA (tap)= 1800C


Monday, October 07, 2019, 09:08

Sunday night heating started at 1A/ min on TGHT to 54 A

heating paused for 1 hour to allow IGP1 to equillibrate.  Then restarted at 1A/min to 400A as planned. 

This morning IGP1 = 1.3e-06 Torr

TGHT = 401A, 4.2V

OMEGA = 1550 C


Monday, October 07, 2019, 09:36

manually tapping to 1800 C


Monday, October 07, 2019, 14:09

Temperature @ ~1800 for 3.5 hours

TGHT= 495.4, 9.2 V

IGP1= 1.1e-06 Torr Pressure Steady there begin cooling

Cooling @ -2A/min

 

 

 

  461   Thursday, October 03, 2019, 09:26 Darwin Ortiz RosalesTaC44062-6LP-SISDoneTaC coating/sintering

Thursday, October 03, 2019, 08:58

Ta tube was coated with TaC and wrapped with Ta heat-shields (3 layers)

Initial weight including heat-shields = 427 g

Desired temperature = 1900 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max).

Evap 2 was pumped down previous night.

IGP1= 7.81e-07 Torr

Manually tapping up to ~40A on both TGHT and TBHT at ~1A/min

Good vacuum = 3.00 e-5 Torr

Bad vacuum = 5.00 e-5 Torr


Thursday, October 03, 2019, 09:21

Manually tapped to 50A on TGHT and TBHT

Will allow pressure to stabilize and begin autoramp TGHT and TBHT at 1A/min to 400A and 230A respectively.

autoramp increments might be increased to 2A/min depending on stability of system.


Thursday, October 03, 2019, 10:00

TGHT = 51.6A, 0.36V

TBHT = 49.5A, 0.62V

IGP1=9.6e-7 Torr

Starting autoramp at 1A/min to a max of 400A for TGHT and 230A for TBHT.  Will monitor and increase ramp increments to 2A/min if stable.


Thursday, October 03, 2019, 11:09

TGHT = 103A, TBHT=97A

IGP1=9.1e-06 Torr and dropping

Will increase autoramp increments to 2A/min


Thursday, October 03, 2019, 11:41

With TGHT = 148A, 1.9V and TBHT = 141A, 2.3V

IGP1= 7.9e-6 Torr

Autoramp was increased to 3A/min


Thursday, October 03, 2019, 13:45

TGHT=401A, 6.9V

TBHT=233A, 4.2V

IGP1= 1.14e-05Torr

OMEGA = 1874

begin manual ramp to 1900C

(Temperature dropping as pressure drops)


 Thursday, October 03, 2019, 14:11

 TGHT= 416A, 7.1V

TBHT=233A, 4.2V

OMEGA = 1900 C

IGP1= 6.9e-06 Torr and trending down


Thursday, October 03, 2019, 15:24

TGHT manually bumped to 421A,  7.2 V because temperature dropped slightly.

Thursday, October 03, 2019, 19:00

TGHT manually increased to 425A, 7.3V

 


Thursday, October 03, 2019, 19:12

TGHT = 424.9A, 7.3V

TBHT=233.2A, 4.1V

OMEGA= 1897 C

IGPA=1.45e-06 Torr

Starting ramp-down at -1A/min on TGHT and 0.5A/min on TBHT


Friday, October 04, 2019, 11:34

Container taken out.

 

  460   Friday, September 27, 2019, 18:18 Marla CervantesNb TARGET BOATDoneConditioning NB samples for Edward

Wednesday, September 25, 2019, 18:06

Target boat with a layer of niobium foil on the bottom is used to heat up Nb samples to 1400 C for 4 hrs.

The niobium samples are wrapped in a Nb foil.

Boat is wrapped with 2 layers of Ta foil, careful to avoid touching samples.


Thursday, September 26, 2019, 18:10 

The target assembly was exchange to a clean one e-log 459 and the Nb arrangement was loaded into evap2.


Friday, September 27, 2019, 18:13

HS water valves opened, no leaks detected.

Tapped up manually to 40 A.

IGP1 = 9.54e-7 Torr

Setting auto-ramp rate at 0.2 A/min to max setpoint of 100 A.

Vacuum stable.

Setting auto-ramp at 1 A/min to 300 A lead to ~1200 C.

Autoramping at 1 A/min to 400 A will stop at 1400 C.

Temperature reading is 1400 C at:

TGHT = 5.61 V, 345.656 A

The temperature reading went to 1408 C on Omega and 1417 C on Micron so the current was dropped to 342.537 A and 5.56 V

The temperature went to 1418 C on Omega and the current was dropped to 339.281 A


After 4 hours at 1400 C, the Nb was cooled down

The final pressure was 3.07e-7 Torr 

The EVAP2 was vented with air and the Nb was removed. 

Attachment 1: Nb-finalTemp.JPG
Nb-finalTemp.JPG
Attachment 2: Nb-arrangement.jpg
Nb-arrangement.jpg
  459   Thursday, September 26, 2019, 14:03 Aaron SchmidtNb41882-3TARGET BOATIn progressHS swap & test Nb target

 HS# 42752-7

Thursday, September 26, 2019, 13:46: Remove Flexible lines HS

Thursday, September 26, 2019, 14:03: Assy installed.


Friday, September 27, 2019, 07:07: Vacuum @ 1.16e-06T. 

Friday, September 27, 2019, 07:09: Waterlines opened. Vacuum stable @ 1.15e-06T 


Monday, September 30, 2019, 10:04: Remove Nb target & assy. Install flexible line HS. 

  458   Tuesday, September 17, 2019, 13:25 Aaron Schmidt  LP-SISProblems resolvedTurbo pump / roughing troubleshoot.

Swapped out VCRs on HS to tray connection. (Right one felt slightly off)

Tuesday, September 17, 2019, 13:23: roughing.

Tuesday, September 17, 2019, 13:32: Turbo pump on. 

Tuesday, September 17, 2019, 13:44: waterlines re-opened. No vacuum response. Ok. @ 7.90e-05T & dropping. 


Wednesday, September 18, 2019, 08:05: Vacuum ok @ 6.87e-07T. Turbo pump off. 

Wednesday, September 18, 2019, 08:21: Venting. 

Pumped down again easy for Ta#59. Issue resolved.

  457   Monday, September 16, 2019, 14:50 Aaron SchmidtTa44062-5LP-SISIn progressConditioning Ta#59

 Ta#59 LP-SIS target description:

Total Ta foils = 470 [6x20 packs + 350 single discs]

Foil Thickness = 0.025mm

Target density =  13.74 g/cm3

Target length = 3.4 cm

Total Mass =  46.7314 g [Incl foils + Ta wire on 6 packs]

Total mass w/ Target oven=  436 g (440 g w/ end caps)

Discs in target are arranged as follows: 1pack / 75singles / 1pack / 100singles / 2packs / 100singles / 1pack / 75singles / 1pack

End caps installed (not yet expanded). No Ta heat shield added.


Monday, September 16, 2019, 14:47: Roughing. 

Monday, September 16, 2019, 14:55: Turbo pump on. 

Monday, September 16, 2019, 15:04: Timed out. Open RV1

Monday, September 16, 2019, 15:05: Restart Turbo pump.

Monday, September 16, 2019, 15:14: Attempt stop / restart before timeout. 

Monday, September 16, 2019, 15:21: Turbo pump unable to pass 4krpm. Close for re-attempt tomorrow am.


Tuesday, September 17, 2019, 12:33: Venting. Sort out pump down issues.


TBHT will be ramped up to 230A at 1.0A/min.

TGHT will be ramped up to 650A at 2.0A/min.

Final desired temperature = 1900C.

OMEGA slope = 0.98.

Wednesday, September 18, 2019, 08:50: Omega slope set to 0.98. Power supplies / sources on. vacuum@ 3.34e-05T & dropping. 

Wednesday, September 18, 2019, 08:25: Roughing.

Wednesday, September 18, 2019, 08:34: Turbo pump on. 

Wednesday, September 18, 2019, 10:22: TGHT manually to 40A. Vacuum @ 3.18e-06T.

Wednesday, September 18, 2019, 10:25: Auto-ramping TGHT / TBHT @ 2 / 1 A per min to 350 / 180 A. 

Wednesday, September 18, 2019, 13:43: Vacuum @ 2.30e-06T. Temp @ 1120 deg C. TGHT / TBHT @ 350 / 180 A. 

Wednesday, September 18, 2019, 13:45: Auto-ramping TGHT / TBHT @ 2 / 1 A per min to 550 / 215 A.  


Thursday, September 19, 2019, 06:39: Vacuum @ 8.79e-07T. Temp @ 1722 deg C. TGHT / TBHT @ 550 / 215 A.  

Thursday, September 19, 2019, 06:42: Auto-ramping TGHT / TBHT @ 2 / 1 A per min to 600 / 230 A.   

Thursday, September 19, 2019, 08:18: Auto-ramping TGHT to 630A @ 2 A per min

Step up to desired temp

Thursday, September 19, 2019, 08:49: Vacuum @ 3.22e-06T. TGHT / TBHT 645 (642.7) / 230 (233.44) A. TGHT Voltage= 12.501V. Omega: 1902-1903 deg C. Desired temperature = 1900C reached. 

Thursday, September 19, 2019, 14:17: Vacuum @ 1.45e-06T. Begin auto-cooling TGHT / TBHT @ -1 / -1 A per min. 


Friday, September 20, 2019, 07:59: Turbo pump off. PS / Sources off. 

Friday, September 20, 2019, 08:42: Venting. 

Attachment 1: Ta#59_Evap_2_Conditioning..docx
  456   Wednesday, September 11, 2019, 15:16 Marla Cervantes 44062-4LP-SISDoneTaC coated target container calibration/conditioning

 Wednesday, September 11, 2019, 15:12

A target container coated with TaC elog 455 was loaded with an empty graphite cartridge and set it in the EVAP2

The system is currently pumping down.

The target container was wrapped with 3 new Ta heat shields.

The target container will be heated to 2000 C and the temperature will be held for 4 hours.


 The autoramp was set to:

TGHT 1 A/min, 450 A

TBHT 0.5 A/min, to 230 A


At 500 A on the TGHT, 20 additional amps were programmed to increased at 1 A/min, however, the autoramp increased the current to 520 A without stepping (see figure A). 


The final conditions were:

TGHT: 9.95 V, 565.59 A

TBHT: 4.18 V, 233.43 A

IGP1: 2.2 e-6 Torr


Friday, September 13, 2019, 11:16

After 4 hours the EVAP2 was cooled down

at a rate of TGHT 1 A/min and TBHT 0.5 A/min

The EVAP2 was vented with air.


 

Attachment 1: A.JPG
A.JPG
Attachment 2: B.JPG
B.JPG
  455   Friday, September 06, 2019, 11:58 Darwin Ortiz Rosales 44062-4LP-SISDoneTaC coating/sintering

Friday, September 06, 2019, 11:20

Container was coated with Tac and wrapped with 2 Ta heat shields.

Desired temp=1900 C, Omega slope set =0.990

Chamber pumped down over night and will be initially tapped manually to 40A for both TGHT and TBHT.

Subsequently, current will be automatically ramped up in increments of 1A/min to reach 400A for TGHT and 230A for TBHT.

Then TGHT will be manually tapped to target temperature and allow to stabilize for a minimum of 3 hours.

Good vac at 3.0e-5 Torr

Bad vac at 5.0e-5 Torr


Friday, September 06, 2019, 11:32

IEVAP2:IGP1=9.6e-7 Torr

Tapping to 40A (TGHT and TBHT).


Friday, September 06, 2019, 12:54

Start autoramp

1A/min TGHT and TBHT

IGP1=4.0e-06 Torr


Friday, September 06, 2019, 13:29

TGHT = 70A, TBHT=70A, pressure started to spike rapidly so aborted autoramp and lowered the current to 66A for both TGHT and TBHT.

pressure continued to rise so tapped current to 60A.  A drop observed.  Will allow to stabilize.


Friday, September 06, 2019, 14:06

IGP1=5.3e-06 Torr.  Restart previous ramping. 


At 66A paused ramping.  IPG1= 1.0e-5 Torr

Friday, September 06, 2019, 15:44

IGP1=6.0e-6 Torr

Start modified autoramping: 0.4A/min for TGHT and TBHT.  Will manually tap up in the morning, over ham and eggs. 


Saturday, September 07, 2019, 10:52

 Will tap up to 423 A on TGHT as per attachment #1 regression

IGP1= 1.13e-6 Torr

OMEGA = 1802 C

TGHT= 401.0 A, 6.84V

TBHT=233.6A, 4.1V


Saturday, September 07, 2019, 11:06

Tapped up TGHT to 438A

OMEGA= 1903C

Will monitor and adjust if necessary.


Saturday, September 07, 2019, 15:06

IGP1 =  1.17e-6 Torr

TGHT = 7.46 V, 439.3 A

TBHT = 4.13 V, 233.4 A

Autoramps

TGHT = -2 A/min, TBHT = -1 A/min


Monday, September 09, 2019, 16:34

The EVAP2 was vented and the target container was removed. 

 

Attachment 1: 190906LPSIS_Sintering.PNG
190906LPSIS_Sintering.PNG
  454   Wednesday, August 28, 2019, 05:59 Marla Cervantes 44062-2-SK DoneGraphite insert test

Wednesday, August 28, 2019, 06:00

A graphite insert (with conical caps) was loaded in tantalum tube 

the Ta tube was wrapped with 3 tantalum foils,

a tantalum cap was inserted in one side of the Ta tube and sealed.

The tube was set in the EVAP2 and the furnace was pumped down.

IGP1 = 1.23e-6 Torr.

The current was tapped to 50 A

Autoramp was set to 1 A/min to 400 A.


 Wednesday, August 28, 2019, 12:02

Autoramp reached 400 A

TGHT = 6.57 V, 404.4 A, IGP1=4.7e-6 Torr

Autoramp was set to 450 A at 1A/min


 Wednesday, August 28, 2019, 12:48

Autoramp reached 450 A

TGHT =7.526 V, 450.188 A, IGP1=5.88e-6 Torr

Autoramp was set to 500 A at 1A/min


Wednesday, August 28, 2019, 13:40

Autoramp reached 500 A, temperature 1880 C

TGHT =8.79 V, 501.094A, IGP1=7.48-6 Torr

Autoramp was set to 540 A at 1A/min 


Wednesday, August 28, 2019, 14:03

The autoramp was stopped at 520 A, because according to previous tests that current is enough to have 2000 C,

the temperature read was 1930 C

TGHT =9.23 V, 520.7 A, IGP1=7.8-6 Torr


Wednesday, August 28, 2019, 15:20

The autoramp was set to 540 A at 1A/min

When the ramp stopped the conditions were:

TGHT=9.59 V, 539.5 A, IGP1= 6.08e-6 Torr

Temperature= 1988 C

Manually tapped to 545 A the temperature reached 2000 C


Wednesday, August 28, 2019, 17:08 

To keep the temperature at 2000 or less the current was decreased,

TGHT= 8.91 V, 445.125 A, IGP1=9.93e-7 Torr

Max temperature read: 2001 C

Min temperature read: 1996 C


Tuesday, September 03, 2019, 11:15

The tube was stable at 1950-1960 C during the weekend but today at around 6 am it had a drop in the current indicating mechanical failure 

The autoramp was set to -2A/min to 0 A. 

The tube will be examined and in case that it is not broken it will be set in the EVAP1 to continue heating it.


Monday, September 09, 2019, 16:35  

The tube became brittle and broke.

  453   Monday, August 12, 2019, 15:55 John WongZrC43044-6LP-SISDoneSintering ZrC Discs

Darwin Ortiz Rosales wrote:

 
 

Tuesday, July 30, 2019, 15:33

ZrC backup Target 12.6 cm disc length, 465 g total weight (no springs and no analysis discs).

Total weight= 470 g.

20 Analysis discs weighing 2.368 g (10 at each end).

Two springs (one at each end).

OMEGA slope initially = 0.990  (was changed to 1.09 at higher Temperature as per eLog #434

Target is being pumped down.


Wednesday, July 31, 2019, 09:31

Desired temp = 1900 C, Auto ramping TGHT at  0.1 A/min to reach 400A then  TGHT will be tapped up accordingly to reach desired temperature. (eLog 434)

TBHT will be set fixed at 230A (max). TBHT at 0.1 A/min to reach 230A.

Note: Initially both TGHT and TBHT will be ramped up at 0.3A/min up to 30A each.

IGP1= 1.35e-06 Torr

Good vac at 3.00-5 Torr

Bad vac at 5.0e-5 Torr.


Wednesday, July 31, 2019, 12:02

At 30A pressure was increasing a bit fast, therefore, the ramp was changed to increments of .1A every 120s (.05A/min). 


Thursday, August 01, 2019, 08:42

TGHT = 54.7

TBHT = 54.3

IGP1 = 3.86e-5 Torr

Will changer heat ramp to .1A/min by changing wait interval to 60s


Tuesday, August 06, 2019, 07:14

OMEGA = 1212 C

TGHT = 344.7 A, 5.79 V

TBHT = 233 A, 4.17 V

IGP1 = 1.05 e-06 Torr

Autoramping to 400A at increments of 0.1A/min


Tuesday, August 06, 2019, 09:50

OMEGA = 1233 C

TGHT = 360 A, 6.05 V

TBHT = 233 A, 4.18 V

IGP1 = 1.21 e-06 Torr

increasing autoramp increments to .5A/min


Tuesday, August 06, 2019, 12:27

OMEGA = 1356 C

TGHT = 400.6 A, 6.92 V

TBHT = 233.8 A, 4.20 V

IGP1 = 1.95 e-06 Torr

Autoramping to 430 A on TGHT at 0.5 A/min


Tuesday, August 06, 2019, 14:02

OMEGA = 1447 C

TGHT= 430.9 A, 7.66V

TBHT = 233.2A, 4.2 V

IGP1= 2.01e-06 Torr

Autoramping to 440 A on TGHT at 0.5 A/min


Wednesday, August 07, 2019, 09:10

OMEGA = 1548

TGHT = 441.56 A, 8.2 V

TBHT = 233.3 A, 4.2 V

IGP1 = 6.21e-07 Torr

Manually ramping up to 1900C @ 1A/min


Wednesday, August 07, 2019, 09:43

Changed OMEGA slope to 1.09 as per eLog #434

OMEGA reads 1773 C @ TGHT 451A, 8.4V

IGP1 = 7.02 e-07


Wednesday, August 07, 2019, 10:56

OMEGA = 1903 C

TGHT = 483.5 A, 9.2V

TBHT = 233.3 A, 4.3V

IGP1 = 1.7 e-06 Torr trending down


Wednesday, August 07, 2019, 11:40

OMEGA = 1914 C

TGHT = 483.5 A, 9.3V

TBHT = 233.3 A, 4.3V

IGP1 = 1.5 e-06 Torr trending down

Decrease TGHT current to 480.4 A


Wednesday, August 07, 2019, 13:04

OMEGA = 1918 C

TGHT = 480.3 A, 9.4V

TBHT = 233.3 A, 4.3V

IGP1 = 1.28e-06 Torr

Decrease TGHT current to 474.5 A


Wednesday, August 07, 2019, 13:26

OMEGA = 1904 C

TGHT = 474.8 A, 9.3V

TBHT = 233.3 A, 4.3V

IGP1 = 1.11e-06 Torr


Wednesday, August 07, 2019, 13:47

OMEGA = 1912 C

TGHT = 474.8 A, 9.3V

TBHT = 233.3 A, 4.3V

IGP1 = 1.10e-06 Torr

Decrease TGHT to 471.8 A

OMEGA temperature went down to 1904 C


Wednesday, August 07, 2019, 14:26

OMEGA = 1911 C

TGHT = 471.8 A, 9.3V

TBHT = 233.3 A, 4.3V

IGP1 = 1.00e-06 Torr

Decrease TGHT to 469.0 A

OMEGA temperature down to 1904C


Wednesday, August 07, 2019, 15:45

OMEGA = 1912 C

TGHT = 468.8.8 A, 9.2V

TBHT = 233.3 A, 4.3V

IGP1 = 9.2e-07 Torr

Decrease TGHT to 466.0 A

OMEGA temperature down to 1903C

 


Wednesday, August 07, 2019, 22:09

OMEGA = 1924 C

TGHT = 466.8. A, 9.3V

TBHT = 233.3 A, 4.3V

IGP1 = 7.6e-07 Torr

Cooling at 2A/min TGHT to 456.0 A, 9.0 V and 1A/min TBHT to 230.1 A, 4.2 V

OMEGA = 1900 C

Will allow Pressure to stabilize

 


 Thursday, August 08, 2019, 06:54

OMEGA = 1919 C

TGHT = 456.9 A, 9.1V

TBHT = 230.3 A, 4.2 V

IGP1 =5.7e-07 Torr

Cooling at 2A/min TGHT and 1A/min TBHT


Thursday, August 08, 2019, 13:30

Target removed from Evap2.  Awaiting inspection by John.


 

 

 Monday, August 12, 2019, 15:45

Visual inspection on the target was performed today.  See attachment for details.

Target container is slightly bent, and some visible crystallization on the container surface.  

The discs are nicely packed with only a slight expansion in length was measured.

No clogging inside the container nor the ionizer tube. 

Some sintered discs samples were collected and SEM will be perform later. 


 

Attachment 1: ZrC_43044-6_inspection.pdf
ZrC_43044-6_inspection.pdf ZrC_43044-6_inspection.pdf
  452   Tuesday, July 30, 2019, 15:42 Darwin Ortiz RosalesZrC43044-6LP-SISDoneSintering ZrC Discs
 
 

Tuesday, July 30, 2019, 15:33

ZrC backup Target 12.6 cm disc length, 465 g total weight (no springs and no analysis discs).

Total weight= 470 g.

20 Analysis discs weighing 2.368 g (10 at each end).

Two springs (one at each end).

OMEGA slope initially = 0.990  (was changed to 1.09 at higher Temperature as per eLog #434

Target is being pumped down.


Wednesday, July 31, 2019, 09:31

Desired temp = 1900 C, Auto ramping TGHT at  0.1 A/min to reach 400A then  TGHT will be tapped up accordingly to reach desired temperature. (eLog 434)

TBHT will be set fixed at 230A (max). TBHT at 0.1 A/min to reach 230A.

Note: Initially both TGHT and TBHT will be ramped up at 0.3A/min up to 30A each.

IGP1= 1.35e-06 Torr

Good vac at 3.00-5 Torr

Bad vac at 5.0e-5 Torr.


Wednesday, July 31, 2019, 12:02

At 30A pressure was increasing a bit fast, therefore, the ramp was changed to increments of .1A every 120s (.05A/min). 


Thursday, August 01, 2019, 08:42

TGHT = 54.7

TBHT = 54.3

IGP1 = 3.86e-5 Torr

Will changer heat ramp to .1A/min by changing wait interval to 60s


Tuesday, August 06, 2019, 07:14

OMEGA = 1212 C

TGHT = 344.7 A, 5.79 V

TBHT = 233 A, 4.17 V

IGP1 = 1.05 e-06 Torr

Autoramping to 400A at increments of 0.1A/min


Tuesday, August 06, 2019, 09:50

OMEGA = 1233 C

TGHT = 360 A, 6.05 V

TBHT = 233 A, 4.18 V

IGP1 = 1.21 e-06 Torr

increasing autoramp increments to .5A/min


Tuesday, August 06, 2019, 12:27

OMEGA = 1356 C

TGHT = 400.6 A, 6.92 V

TBHT = 233.8 A, 4.20 V

IGP1 = 1.95 e-06 Torr

Autoramping to 430 A on TGHT at 0.5 A/min


Tuesday, August 06, 2019, 14:02

OMEGA = 1447 C

TGHT= 430.9 A, 7.66V

TBHT = 233.2A, 4.2 V

IGP1= 2.01e-06 Torr

Autoramping to 440 A on TGHT at 0.5 A/min


Wednesday, August 07, 2019, 09:10

OMEGA = 1548

TGHT = 441.56 A, 8.2 V

TBHT = 233.3 A, 4.2 V

IGP1 = 6.21e-07 Torr

Manually ramping up to 1900C @ 1A/min


Wednesday, August 07, 2019, 09:43

Changed OMEGA slope to 1.09 as per eLog #434

OMEGA reads 1773 C @ TGHT 451A, 8.4V

IGP1 = 7.02 e-07


Wednesday, August 07, 2019, 10:56

OMEGA = 1903 C

TGHT = 483.5 A, 9.2V

TBHT = 233.3 A, 4.3V

IGP1 = 1.7 e-06 Torr trending down


Wednesday, August 07, 2019, 11:40

OMEGA = 1914 C

TGHT = 483.5 A, 9.3V

TBHT = 233.3 A, 4.3V

IGP1 = 1.5 e-06 Torr trending down

Decrease TGHT current to 480.4 A


Wednesday, August 07, 2019, 13:04

OMEGA = 1918 C

TGHT = 480.3 A, 9.4V

TBHT = 233.3 A, 4.3V

IGP1 = 1.28e-06 Torr

Decrease TGHT current to 474.5 A


Wednesday, August 07, 2019, 13:26

OMEGA = 1904 C

TGHT = 474.8 A, 9.3V

TBHT = 233.3 A, 4.3V

IGP1 = 1.11e-06 Torr


Wednesday, August 07, 2019, 13:47

OMEGA = 1912 C

TGHT = 474.8 A, 9.3V

TBHT = 233.3 A, 4.3V

IGP1 = 1.10e-06 Torr

Decrease TGHT to 471.8 A

OMEGA temperature went down to 1904 C


Wednesday, August 07, 2019, 14:26

OMEGA = 1911 C

TGHT = 471.8 A, 9.3V

TBHT = 233.3 A, 4.3V

IGP1 = 1.00e-06 Torr

Decrease TGHT to 469.0 A

OMEGA temperature down to 1904C


Wednesday, August 07, 2019, 15:45

OMEGA = 1912 C

TGHT = 468.8.8 A, 9.2V

TBHT = 233.3 A, 4.3V

IGP1 = 9.2e-07 Torr

Decrease TGHT to 466.0 A

OMEGA temperature down to 1903C

 


Wednesday, August 07, 2019, 22:09

OMEGA = 1924 C

TGHT = 466.8. A, 9.3V

TBHT = 233.3 A, 4.3V

IGP1 = 7.6e-07 Torr

Cooling at 2A/min TGHT to 456.0 A, 9.0 V and 1A/min TBHT to 230.1 A, 4.2 V

OMEGA = 1900 C

Will allow Pressure to stabilize

 


 Thursday, August 08, 2019, 06:54

OMEGA = 1919 C

TGHT = 456.9 A, 9.1V

TBHT = 230.3 A, 4.2 V

IGP1 =5.7e-07 Torr

Cooling at 2A/min TGHT and 1A/min TBHT


Thursday, August 08, 2019, 13:30

Target removed from Evap2.  Awaiting inspection by John.


 

 

  451   Wednesday, July 17, 2019, 11:13 Marla CervantesNb40282-4TARGET BOATDoneAnnealing of RRR-Nb test samples

 Wednesday, July 17, 2019, 10:57

Annealing of five RRR Nb samples following cold-working and resistance measurements.  Used to validate computational annealing model developed for SRF studies.  For more information contact Norman Muller, x6398.

Desired temperature 1025 C.

Five Nb samples wrapped with Nb foil were set on a tantalum boat (coated with TaC)

the tantalum boat was wrapped with two tantalum sheets.

The boat was installed in the EVAP2.

The initial vacuum was IGP1 = 1.26e-6 Torr.

Ramping rate 5 A/min to final current of 200 A.


Wednesday, July 17, 2019, 11:18 

At 155 A, the ramping rate was changed to 1 A/min 


Wednesday, July 17, 2019, 11:28 

The ramping was stopped at 167 A.


 Wednesday, July 17, 2019, 11:57

Conditions:

IGP1 = 1.65e-6 Torr


TGHT = 2.54 V, 174.46 A

Temperature ~ 950 C


Wednesday, July 17, 2019, 18:07

IGP1 = 1.16 e-6

TGHT = 3.18 V, 206.7 A

Temperature ~950 C

Cooling ramp 10 A/min 

 Vented with air


Suggestion for future annealing:

  Use tantalum boat without TaC coating.