Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 9 of 53  Not logged in ELOG logo
ID Date Author Target/No.# Source Stationdown Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  931   Wednesday, June 08, 2022, 10:01 Aaron SchmidtTa#64LP-SISITETM444691-1244378-13In progressConditioning Ta#64 & HV Test.Thermocouples connected. Test HV
Wednesday, June 08, 2022, 09:33:
Roughing.
 7x 
  934   Thursday, June 23, 2022, 11:00 Aaron SchmidtSiC#44HP-FEBIADITETM437978-144378-24In progressConditioning SiC#44Thursday, June 23, 2022, 10:58: Roughing.
Thursday, June 23, 2022, 11:03: BV1A
open.
 SiC#44_-_R.docxER-580-290-30kV-m28.txtSiC#44.docx 
  940   Tuesday, September 27, 2022, 07:55 Aaron SchmidtC#4LP-SISITETM444691-344378-23In progressConditioning C#4 w/ thermocouplesThermocouples attached on 5 X 5 multi-pin:
O - O
O - X
 C#4_Conditioning_-_HV_test.docxER-580-230-30kV-m7.txtER-580-230-30kV-m39.txtER-580-230-30kV-m134.txt 
  944   Tuesday, November 15, 2022, 11:24 Aaron SchmidtUC#41 assemblyLP-SISITETM445220-845235-4In progressConditioning UC#41 assembly LP-SIS 45220-8 is empty & for
testing only.
Tuesday, November 15, 2022, 11:00:
 UC#41_assembly_conditioning.docx 
  960   Wednesday, March 29, 2023, 12:22 Aaron SchmidtTiC#5LP-FEBIADITETM444692-745235-20FailedConditioning TiC#5Wednesday, March 29, 2023, 09:15: Roughing.
Wednesday, March 29, 2023, 12:22:
TP1B on.
 TiC#5_conditioning.docx 
  963   Wednesday, April 26, 2023, 08:46 Aaron SchmidtTiC#5LP-FEBIADITETM444692-645235-20 Testing TiC#5 assembly w/ an empty targetAnode remade with a ceramic "elbow-cube".
Empty target oven in use for testing.
Wednesday, April 26, 2023, 08:44:
 TiC#5_empty_container_run.docxScreenshot_from_2023-04-27_21-54-15.png 
  964   Monday, May 01, 2023, 14:31 Aaron SchmidtTiC#5LP-FEBIADITETM444692-545235-20In progressConditioning TiC#5New TiC LP-FEBIAD Target installed.
Monday, May 01, 2023, 14:23: Roughing.
Monday, May 01, 2023, 21:42: TP1B
 TiC#5_-_44692-5_Anode_&_Coil_checks.docxTiC#5_-_44692-5_Conditioning.docx 
  966   Tuesday, May 09, 2023, 10:40 Aaron SchmidtSiC#45HP-SISITETM444692-345235-8In progressConditioning SiC#45Tuesday, May 09, 2023, 10:28: Roughing.
Tuesday, May 09, 2023, 11:25: TP1B
on. 
 SiC#45_Conditioning..docx 
  967   Tuesday, May 16, 2023, 14:00 Aaron SchmidtTa#65LP-SISITETM445220-745235-2In progressConditioning Ta#65Calibrated window installed on the beam
line.
Tuesday, May 16, 2023, 13:45: Roughing
 Ta#65_conditioning_-_Mass_&_wire_scans.docx 
  1009   Friday, May 17, 2024, 17:24 Brady BorrmannUC#LP-FEBIADITE 44692-445235-18In progressConditioning Spare Development TargetFriday, May 17, 2024, Spare FEBIAD Development
target installed
Friday, May 17, 2024, 17:00: Roughing
  
  1014   Thursday, July 25, 2024, 14:26 Dave NeilsonTa#67 Thin foil LP-SISITETM345447-1445235-10 Conditioning Ta#67 Thin foilThursday, July 25, 2024, 14:25  -
competing electrical checks prior to test
stand installation
  
  1015   Monday, July 29, 2024, 23:02 Aurelia LaxdalTa#67 Thin foilsLP-SISITETM345447-1445235-10 Cooldown for removing the V wires  22:55 Cooldown completed to remove
the voltage wires from inside the vacuum
box. 
  
  1018   Friday, August 09, 2024, 21:08 Ferran Boix PamiesTa#67 Thin foils LP-SISITETM445447-14 45235-10In progressTa#67 thin foil retestingFriday, August 09, 2024, 21:07 Insulators,
retainer and Re foil have been replaced,
source cup machined so the ion source does
 ITE-TM4-Ta#67-LP-SIS_Thin_Foil.docx 
  1022   Friday, September 20, 2024, 14:22 Aaron SchmidtTa#LP-SISITETM245447-1845235-13 Conditioning Ta# https://elog.triumf.ca/TIS/Target+Production/146
Has not run through EVAP2.
Friday, September 20, 2024, 14:04:
  
  1023   Thursday, October 03, 2024, 16:26 Aaron SchmidtTa#68HP-SISITETM245447-2645235-16 * Conditioning Ta#68HS note:
Base# 45235-16
Lid# 39956-8
  
  1029   Wednesday, November 13, 2024, 14:36 Aaron SchmidtUC#(47) - Not includedLP-SISITETM344691-845235-24In progressConditioning UC#47 (Assembly only)Gas line is attached. 
Wednesday, November 13, 2024, 14:18:
Roughing.
 UC#47_empty_conditioning_test_1_-_Failed.docxUC#47_empty_conditioning_test_2.docx 
  1   Wednesday, June 29, 2011, 15:30 John Wong       Testing Yield station elogABC 123 blah blah blah...   
  4   Thursday, September 15, 2011, 09:20 Anders Mjos       ISAC TestStand old e-loglink
to old e-log
  
  5   Thursday, September 15, 2011, 13:46 Anders MjosFEBIAD TestHP-FEBIAD    FailedFEBIAD Broken TubeSee attached file for photos of the broken
tube 
 FEBIAD_Broken_Tube.pdf 
  9   Friday, September 23, 2011, 15:38 Rick Maharaj       test stand ventedTest stand vented   