Entry  Friday, May 05, 2017, 14:28, Aaron Schmidt, UC#20, LP-IG-LIS, , , , , , Conditioning Heat shield for UC#20 (2)  UC#20_Heat_shield_conditioning-2.docxTS-2017-05-05-17-11.rgaTS-2017-05-11-07-50.rga

New O-rings installed on FS#3.

Friday, May 05, 2017, 14:24: Roughing.

Friday, May 05, 2017, 14:34: Waterlines reconnected to air lines. He likely still in lines. May show in RGA if there's an issue prior to opening the waterlines.

Friday, May 05, 2017, 14:47: Turbos started.

Friday, May 05, 2017, 17:59: Water leak still present on FS#3


Monday, May 08, 2017, 08:54: Line re-route on FS#3. Return line on (F) re-routed to Return line on (K). (EE)

Monday, May 08, 2017, 09:00: Open water into line FS#3 wait 10 minutes. Vacuum @ 4.52e-07T.

Monday, May 08, 2017, 09:12: Vacuum @ 4.52e-07T. Lines purged. No response on Vacuum or RGA.

Monday, May 08, 2017, 09:20: Line re-route on FS#3 through (K) supply to (G) & return on (E)

Monday, May 08, 2017, 09:28: Vacuum increased to 6.41e-07T. Response noticed on RGA. FS#3 purged & closed.

Monday, May 08, 2017, 09:30: Slow Vacuum increase to 6.67e-07T & climbing.

Monday, May 08, 2017, 10:13: Vacuum has decreased.

Monday, May 08, 2017, 10:26: Line re-route on FS#3 through (K) supply to (H) & return on (F).

Monday, May 08, 2017, 10:20: Open water into line FS#3 wait 10 minutes. Vacuum @ 4.69e-07T.

Monday, May 08, 2017, 10:30: Vacuum @ 4.60e-07T. Lines purged. No response on Vacuum or RGA.

Monday, May 08, 2017, 10:39: Spike on RGA while tightening (G)

Monday, May 08, 2017, 12:02: RGA off. Ion gauge & turbos off

Monday, May 08, 2017, 14:14: Vented. Lines adapted to leak detector on line (G) of FS#3. Line (E) blanked off. Check for leaks.

Monday, May 08, 2017, 14:49: Roughing.

Further purging of the lines required. Leak detector unable to achieve vacuum in the lines. Adapters removed. Line re-route on FS#3 through (K) supply to (G) & return on (E) for purge.


Tuesday, May 09, 2017, 07:30: Venting & Purging. Purge for a minimum of 20 mins.

Attach adapters. Hook up leak detector

Tuesday, May 09, 2017, 09:24: Leak found @ (G) line block

The (G) block line was disconnected and 'Blanked' off. The (G) line, block to feed through, was re-tested. No leak was found on blank off.

O-ring area cleaned. O-ring replaced. Blank removed. Block to Coil end reconnected. Leak highest when He sprayed directly on block.

Masking tape and/or 'putty' added block to block & confirm solder joint ok.

(E)(G) line removed. Block to block leak/sealing issue confirmed. (G) block leaks on the seat. (E) block ok. Tested externally. Achieves 1.0e-09 leak rate.


Wednesday, May 10, 2017, 09:22: Test stand (G) line from block to feed through has a separate leak. Cannot achieve below e-04 leak rate. Does not fully seal.


Removed heat shield to condition in evaporator 2.

Entry  Friday, September 21, 2018, 11:41, Aaron Schmidt, UC#26, LP-IG-LIS, ITE, TM4, , 42132-1, In progress, Conditioning Heat Shield for UC#26 TS-2018-09-21-14-53.rgaUC#26.docx

Friday, September 21, 2018, 11:40: Roughing

Friday, September 21, 2018, 11:41: Doors sealed for roughing.

Friday, September 21, 2018, 14:02: Turbos on.


Monday, September 24, 2018, 08:05: Waterlines opened. No response on RGA. Vacuum ok @ 4.23-e07T

Monday, September 24, 2018, 08:12: Power / sources on.

Monday, September 24, 2018, 08:15: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 24.3 3.92
 TBHT 24.2 3.11
 COIL + EE 24.1 5.15
 TGHT  24.3 5.80

 Monday, September 24, 2018, 13:45: Vacuum  ok @ 6.47e-07T

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 33.7 4.06
 TBHT 24.9 3.11
 COIL + EE 24.7 5.18
 TGHT  27.0 5.83

 


Friday, September 28, 2018, 09:59: Auto-cooling @ 2A per min.


Tuesday, October 02, 2018, 08:32: Power / Sources off.

Tuesday, October 02, 2018, 08:37: Purge waterlines & empty DI bucket.

Tuesday, October 02, 2018, 08:38: RGA off. Ion gauge, turbo pumps off.

Entry  Monday, October 04, 2021, 15:38, Aaron Schmidt, , LP-IG-LIS, ITE, TM4, , 42132-7, In progress, Conditioning UC#35 IG-LIS HS UC#35.docx

Monday, October 04, 2021, 15:38: Roughing.

Monday, October 04, 2021, 16:08: TP1B on. 

Monday, October 04, 2021, 16:15: TP1 A on. 

Monday, October 04, 2021, 16:41: IG1 on.


Tuesday, October 05, 2021, 06:47: Vacuum @ 4.09e-06T.

Tuesday, October 05, 2021, 06:49: Waterlines opened. Vacuum stable.

Tuesday, October 05, 2021, 06:50: Power / sources on.

Tuesday, October 05, 2021, 06:52: Auto-ramping TGHT to 580 A @ 2 A per min.


Wednesday, October 06, 2021, 05:44: Auto-cooling @ 3 A per min. Vacuum @ 2.37e-06T.\

Wednesday, October 06, 2021, 09:37: Power / sources off.

Wednesday, October 06, 2021, 09:38: IG1 off. TSG:TP1 A & B off.

Wednesday, October 06, 2021, 11:11: Venting. Waterlines off.


Edit* Switched from ITW to ITE. on station icon - AS.

 

Entry  Thursday, July 07, 2022, 16:52, Aaron Schmidt, , LP-IG-LIS, ITW, TM2, , 42132-3, In progress, Conditioning UC#39 assembly 

No UCx target installed. Straight / blank oven in use for out gassing.

Thursday, July 07, 2022, 16:50: Roughing.

Thursday, July 07, 2022, 16:53: BV1A Open.

Thursday, July 07, 2022, 17:31: TP1B on.

Thursday, July 07, 2022, 17:36: TP1A on.

Thursday, July 07, 2022, 17:46: IG1 on. Vacuum @ 2.31e-05T

Thursday, July 07, 2022, 17:47: Waterline FS#5 Opened. Vacuum @ 2.05e-05T & continuing down.

Thursday, July 07, 2022, 18:00: Bypass on IG1. 10A TGHT Check. Ok. Back to 0A. Removed bypass. Ready for remote operation.


Friday, July 08, 2022, 10:44: Started autoramping TGHT 580A/TBHT 0A

Friday, July 08, 2022, 15:37: Autoramping complete


Saturday, July 09, 2022, 07:34 : ramp down started


Sunday, July 10, 2022, 22:14: IG1, TP1B & A off. TP6 has tripped. Sources off.  
 

Entry  Thursday, July 06, 2023, 16:55, Aaron Schmidt, Nb#10, LP-IG-LIS, ITW, TM2, 45447-7, 42132-2, In progress, Conditioning Nb#10 Nb#10_Conditioning.docx

Thursday, July 06, 2023, 16:13: Roughing.

Thursday, July 06, 2023, 16:41: TP1B on.

Thursday, July 06, 2023, 16:47: TP1A on.

Thursday, July 06, 2023, 16:55: TP1A Trip, reset.

Thursday, July 06, 2023, 16:56: IG1 on.

Thursday, July 06, 2023, 16:58: Vacuum @ 1.32e-05T. Waterline FS#5 open.

Thursday, July 06, 2023, 17:02: Power's on. HV Rack is open.


Friday, July 07, 2023, 06:52: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2A per minute. Vacuum at 5.02e-07T

Attempted to open IV4, however it timed out.

Friday, July 07, 2023, 08:25: IV4 reset & opened.

Friday, July 07, 2023, 09:02: HV on.

Friday, July 07, 2023, 09:40: BIAS / EE / BIAS @ 30 / -1.5 / 13 kV. 

Friday, July 07, 2023, 10:10: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per minute. Vacuum at 6.34e-07T

Friday, July 07, 2023, 10:28: Optics set. FC0 @ 3.36e-11, set from 1uA to 100 nA.

Friday, July 07, 2023, 10:59: Reduce BIAS to 20 kV due to sparking.  

Friday, July 07, 2023, 12:24: BIAS back to 30 kV. TGHT / TBHT @ 580 / 230 A. FC0 @ 2.52e-09. Vacuum @ 1.32e-06T. Beginning mass & wire scans.

Friday, July 07, 2023, 16:57:  BIAS / EE / BIAS @ 0 kV.

Friday, July 07, 2023, 16:59: Vacuum @1.14e-06T. Auto-cooling @ 2 A per min. 

Entry  Friday, August 25, 2023, 17:21, Aaron Schmidt, Nb#11, LP-IG-LIS, ITW, TM2, 45447-9, 42132-4, In progress, Conditioning Nb#11 Nb#11_Conditioning.docx

Replacement for Nb#10

Friday, August 25, 2023, 17:15: Roughing.

Friday, August 25, 2023, 17:57: Vacuum taking a while to rough down. Vacuum @ 1.034T. Opened FS#5.

Friday, August 25, 2023, 17:59: Water leak noted. Venting.

Friday, August 25, 2023, 18:27: The left HS waterline was not tight. Chamber is cleaned out & wiped down.

Friday, August 25, 2023, 18:28: Roughing. Purge on RP1

Friday, August 25, 2023, 19:00: Open closed ballast repeatedly on RP1 to purge excess moisture.

Friday, August 25, 2023, 19:05: FS#5 open. No effect on vacuum. Vacuum @ 2.228T & dropping. Power / sources on.

Friday, August 25, 2023, 19:18: Quick bypass check with "IG1 on". Tapped up TGHT / TBHT to 5 A each, & down again. 500 V on & off the BIAS. ok. Bypass removed. Vacuum @ 1.222T. Will remote start TP later. Allow vacuum to stabilize. Otherwise ready for remote operation.

Friday, August 25, 2023, 23:14: Vacuum @ 0.135T. TP1B on. 

Friday, August 25, 2023, 23:20: TP1B at speed. CG1 @ 0.165 T - Allow to stabilize. 

Friday, August 25, 2023, 23:26: CG1 @ 0.091 T. TP1A on.

Friday, August 25, 2023, 23:36: TP1A Tripped. Reset & restart. TP1B off.


Saturday, August 26, 2023, 00:02: The  TSG:CG1A limit to open needs to be increased from 0.050T to 0.100T. Currently at 0.070T. Unable to restart the TP until it's below the limit. Will wait till morning... Later in the morning.

Saturday, August 26, 2023, 09:19: TP1B switched on. 

Saturday, August 26, 2023, 10:08: TP1A switched on.

Saturday, August 26, 2023, 10:16: TP1 A tripped. Reset right away - CG1A @ 0.048T. 

Saturday, August 26, 2023, 10:17: IG1 on. 

Saturday, August 26, 2023, 16:40: IV4 open.

Saturday, August 26, 2023, 16:41: Optics set. Vacuum @ 5.63e-06T 

Saturday, August 26, 2023, 23:43: Vacuum @ 4.46e-06T. Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per minute. Expecting outgassing however. 


Sunday, August 27, 2023, 09:11: Vacuum @ 5.10e-06T. TGHT / TBHT @ 350 / 150 A. Auto-ramping TGHT to 400 A. 

Sunday, August 27, 2023, 10:44: Abort TGHT @ 383 A. Auto-ramping TGHT / TBHT to 500 / 200 A.

Sunday, August 27, 2023, 19:13: Vacuum @ 5.08e-06T. TGHT / TBHT @ 422 / 189 A. Auto cool TGHT / TBHT to 250 / 100 A @ 4 A per minute.

Sunday, August 27, 2023, 20:06: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min. 

Sunday, August 27, 2023, 22:43: Halt auto-ramp @ 490 / 230 A. 

Sunday, August 27, 2023, 22:50: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. 

Sunday, August 27, 2023, 22:52: Begin mass & wire scans. Manually tap up TGHT to 500 A. Vacuum @ 5.36e-06T 

Sunday, August 27, 2023, 23:04: Manually tap up TGHT to 505 A 

Sunday, August 27, 2023, 23:09: Manually tapped up TGHT to 520 A.

Sunday, August 27, 2023, 23:11: Increase TSH auto-ramp vacuum limit from 5.00e-06T to 6.00e-06T. Auto-ramping TGHT to 580 A @ 3A per min.

Sunday, August 27, 2023, 23:25: TGHT up to 554 A . Vacuum limit reached. Take mass & wire scans.

Sunday, August 27, 2023, 23:59: Peak on Mass 40. Otherwise mostly back round.  


Monday, August 28, 2023, 00:02: Reset TSH auto-ramp vacuum limit to 5.0e-06T. Auto-cooling @ 2A per minute.\

Monday, August 28, 2023, 00:09: HV tapped down to 0 V. 

Monday, August 28, 2023, 06:08: IV4 closed. Sources off. 

Monday, August 28, 2023, 06:09: IG1 & turbo pumps off.

Monday, August 28, 2023, 07:30: Power off. Venting. Purge FS#5.

Entry  Tuesday, October 29, 2024, 18:25, Aaron Schmidt, UC#46 (assembly only), LP-IG-LIS, ITW, TM4, , 42972-6 / 39956-1, In progress, Conditioning UC#46 Assembly 

 42972-6 Base / 39956-1 Lid

Tuesday, October 29, 2024, 18:20: Roughing. 

Tuesday, October 29, 2024, 18:52: TP1B on. 

Tuesday, October 29, 2024, 18:58: TP1A on.

Tuesday, October 29, 2024, 19:06: IG1 on.


Wednesday, October 30, 2024, 07:23: Vacuum @ 8.25e-07T. Waterline FS#5 open.

Wednesday, October 30, 2024, 07:25: Power on.

Wednesday, October 30, 2024, 07:32: PS for TGHT keeps timing out? Goes red. Won't start. 

Tapped up TBHT to 10 A. TGHT?

Wednesday, October 30, 2024, 08:20: Manually cycled the PS. No longer trips.

Tapped up TGHT to 5 A. OK

Wednesday, October 30, 2024, 08:26: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.

Wednesday, October 30, 2024, 14:32: Auto-cooling @ 2 A per min.

 


Thursday, October 31, 2024, 08:30: TP/ IG1 off. 

Thursday, October 31, 2024, 12:52: Venting. 

Entry  Tuesday, November 05, 2024, 16:40, Brady Borrmann, UC #24D (Assembly only), LP-IG-LIS, , , , 44972-5 / 42972-9, In progress, Conditioning UC#24D Assembly 

42972-5 Base / 42972-9 Lid

Tuesday, November 05, 2024, 16:30: Roughing. 

Tuesday, November 05, 2024, 17:04: TP1B on.

Tuesday, November 05, 2024, 17:13: TP1A on.

Tuesday, November 05, 2024, 17:21: IG1 on @ 2.41e-05T 


Wednesday, November 06, 2024, 10:35: Vacuum @ 5.75e-07T. Waterline FS#5 open. 

Wednesday, November 06, 2024, 16:24: TGHT/TBHT ramping to 580/230A at 2A/min

 


Thursday, November 07, 2024, 09:16:  Increasing BIAS/EE/EZL to 30/2.5/13 kV slowly

Thursday, November 07, 2024, 11:26:  as expected, no beam out to FC0. slowly increasing to bias to 45kV alongside ezl to 28kV

Thursday, November 07, 2024, 11:27:   TGHT dropped out for 1s. Did not register a trip or anything. simply jumped down to 0A and immediately recovered.

Thursday, November 07, 2024, 14:40:   At 45kV, there were no sparks noticed. The target assembly was brought down to 0V and ramped down to 0A/0A at -2A/min  


Wednesday, November 13, 2024, 09:15: PS Off. TP off - AS. 

Wednesday, November 13, 2024, 11:26: VV1 opened - BB. 

Entry  Monday, July 23, 2018, 14:25, Aaron Schmidt, UC#23, LP-FEBIAD-CTL, ITE, TM2, , , In progress, Conditioning Heat Shield for UC#23 UC#23_emit.dat_error.docxTS-2018-07-2-08-07.rgaTS-2018-07-24-07-20.rgaUC#23.docx

Monday, July 23, 2018, 14:20: Roughing.

Monday, July 23, 2018, 14:54: Turbo pumps on. 


Tuesday, July 24, 2018, 06:40: Ion gauge on. Vacuum slowly decreasing

Tuesday, July 24, 2018, 07:20: RGA on.

Tuesday, July 24, 2018, 07:27: Waterlines opened. No response on RGA. Vacuum stable @ 2.24e-06T

Tuesday, July 24, 2018, 07:29: Power/sources on.

Tuesday, July 24, 2018, 07:34: Opening gas lines slowly.

Tuesday, July 24, 2018, 07:36: SV2 & SV5 Open.

Tuesday, July 24, 2018, 07:43: SV3 Open. 

Tuesday, July 24, 2018, 07:47: SV4 Open. 

Tuesday, July 24, 2018, 09:00: Turn off sources/power and check 9-pin in the back of the TS. OK

Tuesday, July 24, 2018, 09:20: Restart sources/power. Gases open.

Tuesday, July 24, 2018, 13:39: Auto-ramping TGHT / TBHT to 500 / 275 A @ 2A per min.

Tuesday, July 24, 2018, 13:45: BIAS / EZL / EE @ 30  / 13 / -1.5 kV.

Tuesday, July 24, 2018, 13:46: IV4 opened.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 26.4 3.92
 TBHT 26.9 3.08
 COIL + EE 26.1 5.00
 TGHT  26.5 5.64

Tuesday, July 24, 2018, 13:48: Optics set.


Note* Approx 10 sparks noted during auto-ramping. All occurred between 12:30am - 4:00am today.

Wednesday, July 25, 2018, 06:35: Auto-ramping is ongoing since it was started yesterday. Auto-ramping TGHT / TBHT to 500 / 275 A @ Vacuum limited rate

TGHT / TBHT @ 310 / 275. Significant out gassing noted adjusting the ramping rate.

Wednesday, July 25, 2018, 06:40: Auto-ramp halted. Auto-ramping TGHT / TBHT to 580 / 285 (290 w/ direct readout) A @ Vacuum limited rate. Restart auto-ramp.

Wednesday, July 25, 2018, 11:25: Increased good ramping limit to 2E-6 Torr - AM

Wednesday, July 25, 2018, 11:28: ANODE voltage to 200 V, 11 mA current read back


Thursday, July 26, 2018, 08:08: RGA Restarted

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 35.6 3.86
 TBHT 26.8 3.06
 COIL + EE 26.5 5.03
 TGHT 28.6 5.65

Thursday, July 26, 2018, 08:13: EZL to 13.4 kV

Thursday, July 26, 2018, 08:19: Coil @ 20 A.

Thursday, July 26, 2018, 08:29: Coil @ 30 A. TBHT @ 300A.

Thursday, July 26, 2018, 08:35: Coil @ 40 A.

Thursday, July 26, 2018, 08:41: Coil @ 50 A.

Thursday, July 26, 2018, 14:33: auto-cooling @ 2 A per min

Thursday, July 26, 2018, 14:45: Coil @ 0 A.


Friday, July 27, 2018, 08:29: Gas lines closed

Friday, July 27, 2018, 08:32: Sources off.

Friday, July 27, 2018, 08:34: RGA off. IV4 closed

Friday, July 27, 2018, 08:36: Ion gauge & turbos off.

Friday, July 27, 2018, 08:39: Power off. Waterlines purged.

Entry  Tuesday, February 28, 2012, 10:29, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Test FEBIAD at ISAC test statnd 
 
Entry  Thursday, June 28, 2012, 11:04, Pierre Bricault, Test FEBIAD, LP-FEBIAD, , , , , In progress, Ready to bias the high voltage. 
 
Entry  Thursday, June 28, 2012, 11:13, Pierre Bricault, , LP-FEBIAD, , , , , , ISAC test stand ready for cathode heating 

The ISAC test stand is ready for cathode heating.

Bias voltage: 30000 V

Bias current: 37 microAmp

Anode bias: 200 V

Anode current: 6.105 mA

Cathode current: 0 Amp

Cathode voltage: 0 V

Coil current: 30 A

Coil Voltage 0.2 V

EE Voltage: 1800 V

EE current: 30 microAmp

Einzel Lens voltage: 14000 V

Einzel lens current: 49 microAmp.

Entry  Thursday, June 28, 2012, 11:19, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Cathode ramping to 230 A in progress 
 
Entry  Thursday, June 28, 2012, 11:27, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Cathode heating in progress, pressure 8.3e-7 T 
 
Entry  Thursday, June 28, 2012, 11:29, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Lost all cnntrol interface, complete whiteout of the epics system. 
 
Entry  Thursday, June 28, 2012, 15:14, Aurelia Laxdal, , LP-FEBIAD, , , , , , Quick check 

Just a quick check at the Test Stand:

1. The system operational (  white out not present ) with TSH:TBHT heating in progress.

2. Started the Archivers: for Source and Optics.

3. Removed bypass on TSH:SV5 since it's not necessary anymore.

4. Currently: TSH:TBHT=107A

Entry  Thursday, June 28, 2012, 17:00, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Cathode heater reached its value of 230 A and stoped. good test. 

Now ramp cathode current up to 290 A. The total current out is 1.e-7 A.

 

Entry  Thursday, June 28, 2012, 17:18, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Leave the cathode heater at 275 A overninght. 
 
Entry  Friday, June 29, 2012, 08:57, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Continue cathode heating 

 This morning the pressure was 3.5E-7 T. Current at 275 A is 30nA.

Continue cathode heating to 290 A during meeting.

Start seeing some electron current from the cathode around 275 A.

Entry  Friday, August 10, 2012, 12:44, Pierre Bricault, NA, LP-FEBIAD, , , NA, NA, In progress, FEBIAD test 

Rick put the helium bottle back in the rack.

Waiting for status of the gas lines.

 