  886   Monday, July 26, 2021, 17:35 Fernando Maldonado LP-FEBIAD  41790-1044378-5FailedFEBIAD efficiency measurements. Monday, July 26, 2021, 17:23: Roughing
Monday, July 26, 2021, 17:55: Turbos
on.
  
  887   Tuesday, July 27, 2021, 12:57 Fernando Maldonado LP-FEBIAD  41790-1044378-5FailedFEBIAD parameter scan - efficiency measurementsAssembly has new gas tube to the
target for better fit and clearance to the
HS.
  
  888   Wednesday, July 28, 2021, 08:48 Fernando Maldonado LP-FEBIAD  41790-1044378-5FailedFEBIAD parameter scan - efficiency measurementsModified spiral tube from VCR to
counteract torque towards the HS. Now points
towards TBHT.
  
  890   Friday, July 30, 2021, 16:28 Fernando Maldonado LP-FEBIAD  41790-1044378-5DoneFEBIAD parameter scan - efficiency measurements Restarting everything after swapping
RP1 (see elog 889).
  
  501   Wednesday, March 30, 2016, 16:32 Aaron SchmidtTa#47LP-SISITETM441790-141120-05In progressConditioning Ta#47Wednesday, March 30, 2016, 16:31: Roughing.
Wednesday, March 30, 2016, 17:34
: Turbos started -AM
 TS-2016-03-30_Ta#47.rgaER-580-230-30kV-m23.txtER-580-230-30kV-m27.txtITE-TM4-Ta#47-LP-SIS_Test_Stand.docxTa#47.docx 
  506   Thursday, April 21, 2016, 14:26 Aaron SchmidtTa#48HP-SISITWTM241369-541120-5In progressConditioning Ta#48Thursday, April 21, 2016, 14:25: Begin
pumping down.
Thursday, April 21, 2016, 15:02:
 TS-2016-04-21_Ta#48.rga 
  993   Tuesday, February 06, 2024, 11:48 Aaron SchmidtSiC# (Stock)HP-SIS  41369-245235-14In progressConditioning (Stock SiC-24C) SiC HP-SISTuesday, February 06, 2024, 11:45: Roughing.
Tuesday, February 06, 2024, 13:27:
TP1B on.
  
  588   Friday, June 02, 2017, 15:57 Aaron SchmidtSiC#36HP-FEBIAD-CTLITWTM241369-1042132-6/9 Conditioning SiC#36Friday, June 02, 2017, 15:20: Coil loose
(Remove lid, Tighten and place lid again)
Friday, June 02, 2017, 15:52: Roughing
 9x 
  658   Wednesday, April 25, 2018, 09:50 Aaron SchmidtTa (test)LP-SIS  41177-3 In progressTa test and window changeWindow changed on view port. Ta target
prepared for Aurelia's tests.
***Note*** No Ta window foils
 TS-2018-04-25-14-55.rgaTa_target_heating_test_-_Test_stand.docx 
  676   Friday, July 27, 2018, 14:44 Aaron SchmidtUC#24LP-SISITETM441177-342752-6In progressConditioning Heat Shield for UC#24 & voltage test prep4 Kapton wire routed into the 9-pin connector.
Unused pins are grounded on the bracket.
Friday, July 27, 2018, 14:25: Roughing
  
  678   Tuesday, August 14, 2018, 11:03 Aaron Schmidt LP-SIS  41177-342752-6 Voltage Tests (Ta target)Tuesday, August 14, 2018, 10:55: Auto ramping
TGHT @ 6 A per min to 40 A.
Tuesday, August 14, 2018, 11:03:
  
  680   Wednesday, August 22, 2018, 15:20 Aaron Schmidt LP-SIS  41177-3  Voltage Tests (Ta Target)  Wires reconfigured / set 
Wednesday, August 22, 2018, 13:10:
Roughing. 
  
  684   Wednesday, September 12, 2018, 11:19 Aaron SchmidtTa#57LP-SISITETM441177-342752-6In progressConditioning Ta#57Wednesday, September 12, 2018, 11:06: Roughing.
Help req'd. Doors wouldn't seal.
Wednesday, September 12, 2018, 11:52:
 9x 
  454   Tuesday, June 30, 2015, 14:51 Anders MjosZrC#7LP-SIS TM241177-2 In progressZrC#7 Conditioning 2Tuesday, June 30, 2015, 14:51: Roughing
Tuesday, June 30, 2015, 16:14: Started
turbos. CG1 at 0.075 T
 ZrC#7_Second_Time.docxTGT2-ER580-200-30kV-m39-off60-3.txt 
  450   Monday, June 15, 2015, 14:09 Anders MjosZrC#7LP-SIS TM241177-1 In progressZrC#7 ConditioningMonday, June 15, 2015, 14:05 Roughing
Monday, June 15, 2015, 14:39: Turbos
started.
 ZrC#7.docxER580-220-30kV-m39-off30.txt 
  494   Friday, January 22, 2016, 15:34 Anders MjosSiCLP-SIS  41077-3 In progressEE coating testFriday, January 22, 2016, 15:30: Turbos
started
Friday, January 22, 2016, 16:14:
 2016-02-14_EE_V_limit.png 
  495   Tuesday, February 23, 2016, 10:43 Anders MjosSiCLP-SIS  41077-3  EE coating test - no Plasma ElectrodeCleaned up EE and around target tube. Removed
PE
Tuesday, February 23, 2016, 10:40:
  
  507   Monday, May 02, 2016, 16:03 Aaron SchmidtSiCLP-SIS  41077-3  EE new insulator TestMonday, May 02, 2016, 16:01: Roughing.
Monday, May 02, 2016, 16:35: Turbos
started -AM
 TS-2016-05-02_EE_insulator_test.rga 
  508   Friday, May 06, 2016, 10:18 Aaron SchmidtSiCLP-SIS  41077-3  EE new insulator Test (2) No PEFriday, May 06, 2016, 10:18: Begin roughing
Venting: VCR on HS not closed
Friday, May 06, 2016, 12:58: Roughing
  
  509   Thursday, May 12, 2016, 13:32 Aaron SchmidtSiCLP-SIS  41077-3  EE new insulator Test, No PE , Dirty EE.Thursday, May 12, 2016, 13:00: Begin Roughing.
Thursday, May 12, 2016, 13:40: Turbo
Pumps started
  