ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
|
718
|
Tuesday, April 23, 2019, 14:39 |
Aaron Schmidt | | LP-SIS | | | | 42752-8 | Done | Conditioning UC#28 HS | Tuesday, April 23, 2019, 14:39: Roughing.
Tuesday, April 23, 2019, 15:09: Turbo
pumps started. |
|
753
|
Thursday, August 08, 2019, 09:12 |
Aaron Schmidt | | LP-FEBIAD | | | | 42752-7 | In progress | P2N Setup - LP-FEBIAD target | Inserted a used (heating) LP-FEBIAD target
with a basic heat shield assembly with no
end plate foil on the window side to observe |
8x |
1016
|
Wednesday, July 31, 2024, 18:50 |
Aaron Schmidt | TiC Spare | HP-FEBIAD | ITW | TM4 | 45447-2 | 42752-7 | In progress | Conditioning Spare for TiC#7 | Wednesday, July 31, 2024, 18:47: Roughing.
Wednesday, July 31, 2024, 19:24:
TP1B on. |
|
676
|
Friday, July 27, 2018, 14:44 |
Aaron Schmidt | UC#24 | LP-SIS | ITE | TM4 | 41177-3 | 42752-6 | In progress | Conditioning Heat Shield for UC#24 & voltage test prep | 4 Kapton wire routed into the 9-pin connector.
Unused pins are grounded on the bracket.
Friday, July 27, 2018, 14:25: Roughing |
|
678
|
Tuesday, August 14, 2018, 11:03 |
Aaron Schmidt | | LP-SIS | | | 41177-3 | 42752-6 | | Voltage Tests (Ta target) | Tuesday, August 14, 2018, 10:55: Auto ramping
TGHT @ 6 A per min to 40 A.
Tuesday, August 14, 2018, 11:03: |
|
684
|
Wednesday, September 12, 2018, 11:19 |
Aaron Schmidt | Ta#57 | LP-SIS | ITE | TM4 | 41177-3 | 42752-6 | In progress | Conditioning Ta#57 | Wednesday, September 12, 2018, 11:06: Roughing.
Help req'd. Doors wouldn't seal.
Wednesday, September 12, 2018, 11:52: |
9x |
799
|
Monday, July 06, 2020, 05:28 |
Fernando Maldonado | Test FEBIAD | HP-FEBIAD | | | 38295-8 | 42752-5 | Done | FEBIAD development part 3/3 | Reminder. Mini pump still linked
to SV1. DO NOT OPEN SV2!!! |
|
798
|
Tuesday, June 30, 2020, 21:59 |
Fernando Maldonado | Test FEBIAD | HP-FEBIAD | | | 38295-8 | 42752-5 | Done | FEBIAD development part 2/3 | Reminder. Mini pump
still linked to SV1. DO NOT OPEN SV2!!! |
|
659
|
Monday, April 30, 2018, 12:07 |
Aaron Schmidt | | LP-FEBIAD | | | 41790-9 | 42752-5 | In progress | Test ready | Ready for C-seals or FEBIAD work
Monday, April 30, 2018, 12:05: Roughing.
Monday, April 30, 2018, 13:11: Turbo |
|
660
|
Tuesday, May 08, 2018, 10:36 |
Aaron Schmidt | | LP-FEBIAD | | | 41790-9 | 42752-5 | In progress | C-seal Test | 2 C-Seals installed with SS springs
on water blocks. The SS springs are also
used in the module. |
|
664
|
Monday, May 28, 2018, 08:46 |
Aaron Schmidt | | LP-FEBIAD | | TM2 | 41790-9 | 42752-5 | In progress | New TM source tray swap out. | Monday, May 28, 2018, 08:45: Venting. Prep
For removal.
Close FS#8. Clean up water |
|
670
|
Thursday, June 21, 2018, 16:32 |
Anders Mjos | | LP-FEBIAD | | | 41790-9 | 42752-5 | In progress | Heating target | Thursday, June 21, 2018, 16:30: Short between
ANODE and EE. Do not use until repaired.
Thursday, June 21, 2018, 16:32: Ramping |
|
672
|
Monday, July 09, 2018, 10:44 |
Aaron Schmidt | | LP-FEBIAD | | | 41790-9 | 42752-5 | In progress | Coil Test July | Monday, July 09, 2018, 10:43: Rouging.
Monday, July 09, 2018, 13:14: Turbo
pumps on. |
|
673
|
Thursday, July 12, 2018, 08:24 |
Aaron Schmidt | | LP-FEBIAD | | | 41790-9 | 42752-5 | In progress | Power outage / restart | Power outage (07/11/2018 @ approx 21:53)
shut down the test stand.
|
|
674
|
Thursday, July 12, 2018, 10:11 |
Aaron Schmidt | | LP-FEBIAD | | | 41790-9 | 42752-5 | In progress | Coil Test #5 | *** REVIEW Elog entry #673 Power
outage & restart ***
Thursday, July 12, 2018, 10:10: Opened |
|
687
|
Tuesday, October 02, 2018, 13:39 |
Aaron Schmidt | | LP-FEBIAD | | | 41790-9 | 42752-5 | In progress | Test FEBIAD w/ Silver bolts & sealed end caps w/ stoppage | Silver bolts used on Coil, TGHT, &
TBHT.
End caps in target |
|
688
|
Monday, October 15, 2018, 14:23 |
Aaron Schmidt | | LP-FEBIAD | | | 41790-9 | 42752-5 | In progress | Test FEBIAD w/ Silver bolts & sealed end caps | Anode / Cathode BIAS PS polarity reversed
by John Chow. PS: Negative
Monday, October 15, 2018, 14:12: |
|
691
|
Monday, October 22, 2018, 11:07 |
Aaron Schmidt | | LP-FEBIAD | | | 41790-9 | 42752-5 | In progress | Test FEBIAD w/ Silver bolts & sealed end caps | Restarted post power outage.
Water & Turbos on.
Monday, October 22, 2018, 10:55: |
|
692
|
Monday, October 29, 2018, 10:56 |
Aaron Schmidt | | LP-FEBIAD | | | 41790-9 | 42752-5 | Problems/Solutions | TS communications issues. | Sometime around 00:30 Sunday, October 28,
2018, the ISAC test stand lost communication
to the PLC and shut down abruptly. |
|
693
|
Monday, October 29, 2018, 11:03 |
Aaron Schmidt | | LP-FEBIAD | | | 41790-9 | 42752-5 | Done | Test FEBIAD w/ Silver bolts & sealed end caps | Restarting FEBIAD
Monday, October 29, 2018, 10:56:
Restart roughing & Turbo pumps. |
|
|