Entry  Tuesday, April 23, 2019, 14:39, Aaron Schmidt, , LP-SIS, , , , 42752-8, Done, Conditioning UC#28 HS  TS-2019-04-24-07-30.rgaUC#28_HS.docx
Tuesday, April 23, 2019, 14:39: Roughing.
Tuesday, April 23, 2019, 15:09: Turbo pumps started.
Tuesday, April 23, 2019, 15:18: Ion gauge on. 
Entry  Thursday, August 08, 2019, 09:12, Aaron Schmidt, , LP-FEBIAD, , , , 42752-7, In progress, P2N Setup - LP-FEBIAD target 8x
Inserted a used (heating) LP-FEBIAD target with a basic heat shield assembly with no end plate foil on the window side to observe heating. The P2N Coil
/ TGHT connections were added.
Test whether the TS connections are affecting the P2N heating or if it's the P2N target itself.
Entry  Wednesday, July 31, 2024, 18:50, Aaron Schmidt, TiC Spare, HP-FEBIAD, ITW, TM4, 45447-2, 42752-7, In progress, Conditioning Spare for TiC#7 
Wednesday, July 31, 2024, 18:47: Roughing.
Wednesday, July 31, 2024, 19:24: TP1B on.
Wednesday, July 31, 2024, 19:30: TP1B at speed. Backing pressure CG1A @ 0.212T.
Entry  Friday, July 27, 2018, 14:44, Aaron Schmidt, UC#24, LP-SIS, ITE, TM4, 41177-3, 42752-6, In progress, Conditioning Heat Shield for UC#24 & voltage test prep 
4 Kapton wire routed into the 9-pin connector. Unused pins are grounded on the bracket.
Friday, July 27, 2018, 14:25: Roughing
Friday, July 27, 2018, 14:41: Turbo pumps on.
Entry  Tuesday, August 14, 2018, 11:03, Aaron Schmidt, , LP-SIS, , , 41177-3, 42752-6, , Voltage Tests (Ta target) 
Tuesday, August 14, 2018, 10:55: Auto ramping TGHT @ 6 A per min to 40 A.
Tuesday, August 14, 2018, 11:03: TGHT @ 40 A. Display @ 0.198 V. PS @ 0.18 V. Multimeter @ 033 mV.
Tuesday, August 14, 2018, 11:09: Auto ramping TGHT @ 6 A per min to 80 A.
Entry  Wednesday, September 12, 2018, 11:19, Aaron Schmidt, Ta#57, LP-SIS, ITE, TM4, 41177-3, 42752-6, In progress, Conditioning Ta#57 9x
Wednesday, September 12, 2018, 11:06: Roughing. Help req'd. Doors wouldn't seal.
Wednesday, September 12, 2018, 11:52: Turbo pumps started. 
Wednesday, September 12, 2018, 12:40: Ion gauge on.
Entry  Monday, July 06, 2020, 05:28, Fernando Maldonado, Test FEBIAD , HP-FEBIAD, , , 38295-8 , 42752-5 , Done, FEBIAD development part 3/3 
Reminder. Mini pump still linked to SV1. DO NOT OPEN SV2!!!
 
The plan for today Monday, July 06, 2020 is:
Entry  Tuesday, June 30, 2020, 21:59, Fernando Maldonado, Test FEBIAD, HP-FEBIAD, , , 38295-8 , 42752-5 , Done, FEBIAD development part 2/3 
 Reminder. Mini pump still linked to SV1. DO NOT OPEN SV2!!!
 
The plan for today Wednesday, July 01, 2020 (
Entry  Monday, April 30, 2018, 12:07, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, Test ready 
Ready for C-seals or FEBIAD work
Monday, April 30, 2018, 12:05: Roughing.
Monday, April 30, 2018, 13:11: Turbo pumps on.
Entry  Tuesday, May 08, 2018, 10:36, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, C-seal Test 
2 C-Seals installed with SS springs on water blocks. The SS springs are also used in the module.
Long pkg seal (A):
T: 0.098" x 0.429" Diameter.
Entry  Monday, May 28, 2018, 08:46, Aaron Schmidt, , LP-FEBIAD, , TM2, 41790-9, 42752-5, In progress, New TM source tray swap out.  New_TM_Source_Tray_2018.docxTS-2018-05-30-06-30.rgaER-580-310-30kV-m28.txtER-580-320-30kV-M39.txt2018_TM2_Source_Tray_in_Test_Stand_-_Test_Results.docx
Monday, May 28, 2018, 08:45: Venting. Prep For removal.
Close FS#8. Clean up water
Adjust
Entry  Thursday, June 21, 2018, 16:32, Anders Mjos, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, Heating target TS-2018-06-19-10-30.rgaTS_Source_tray_2018_-_Check_2.docx
Thursday, June 21, 2018, 16:30: Short between ANODE and EE. Do not use until repaired.
Thursday, June 21, 2018, 16:32: Ramping TBHT/TGHT to 290 / 580 Aat 2 A/min

Friday, June 22, 2018, 07:49: Target at temperature. Vacuum at 1.0E-7 T
Entry  Monday, July 09, 2018, 10:44, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, Coil Test July  
Monday, July 09, 2018, 10:43: Rouging.
Monday, July 09, 2018, 13:14: Turbo pumps on.

Tuesday, July 10, 2018, 07:45: Waterlines opened. Vacuum ok @ 6.93e-07T. No response on RGA.
Entry  Thursday, July 12, 2018, 08:24, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, Power outage / restart 
Power outage (07/11/2018 @ approx 21:53) shut down the test stand.
Entry  Thursday, July 12, 2018, 10:11, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, Coil Test #5 
 *** REVIEW Elog entry #673 Power outage & restart ***
Thursday, July 12, 2018, 10:10: Opened IV4
Thursday, July 12, 2018, 10:20: Attempt auto-ramp cancelled. Max increment values reached. Wait on Vacuum.
Entry  Tuesday, October 02, 2018, 13:39, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, Test FEBIAD w/ Silver bolts & sealed end caps w/ stoppage FEBIAD_Coil_Test_6_-_POS_Cathode.docxTS-2018-10-11-10-37.rga
Silver bolts used on Coil, TGHT, & TBHT.
End caps in target
Tuesday, October 02, 2018, 13:36: Roughing.
Entry  Monday, October 15, 2018, 14:23, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, Test FEBIAD w/ Silver bolts & sealed end caps  FEBIAD_Coil_Test_6-2_-_Neg_Cathode.docxTS-2018-10-15-14-15.rga
Anode / Cathode BIAS PS polarity reversed by John Chow. PS: Negative
Monday, October 15, 2018, 14:12: Power/sources on
Monday, October 15, 2018, 14:17: RGA on.
Entry  Monday, October 22, 2018, 11:07, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, Test FEBIAD w/ Silver bolts & sealed end caps  epics-plot-whiteout-181028_1322.PNGepics-whiteout-181028_1322.PNGFEBIAD_COIL_Test_6-3_Caps_in.docxTS-2018-10-22-09-47.rga
Restarted post power outage.
Water & Turbos on.
Monday, October 22, 2018, 10:55: Power / sources on. MB1?
Entry  Monday, October 29, 2018, 10:56, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, Problems/Solutions, TS communications issues. 
Sometime around 00:30 Sunday, October 28, 2018, the ISAC test stand lost communication to the PLC and shut down abruptly.
Monday, October 29, 2018, 09:00: PLC communications issues.
Rod N. was contacted this morning& the issues fixed by controls group.
Entry  Monday, October 29, 2018, 11:03, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, Done, Test FEBIAD w/ Silver bolts & sealed end caps 
Restarting FEBIAD
Monday, October 29, 2018, 10:56: Restart roughing & Turbo pumps.
Monday, October 29, 2018, 11:03: Ion gauges on.