Entry  Thursday, August 30, 2012, 14:34, Aurelia Laxdal, , HP-FEBIAD, ITE, TM4, , , In progress, NiO#1 updates 

Did another mass scan at 280A for the ionizer:

Plotdump-local-clean.txt Aug30 12 14-28-14.txt

http://isacwserv.triumf.ca/onlylocal/isac/IsacInternalFrameSet.html

Ramping up the TBHT from 280A -> 290A

 

And from 290A -> 300A:

Plotdump-local-clean.txt Aug30 12 16-40-29.txt

http://isacwserv.triumf.ca/onlylocal/isac/IsacInternalFrameSet.html

Entry  Thursday, August 30, 2012, 16:51, Aurelia Laxdal, , HP-FEBIAD, ITE, TM4, , , In progress, NiO#1 cooldown started 

Started the cooldown.

Entry  Friday, August 31, 2012, 11:12, Aurelia Laxdal, , HP-FEBIAD, ITE, TM4, , , Done, Finished testing NiO#1 

Turned off the HV and the optics in the first section. Couldn't turn off the optics in the second section: left a message for Evgeniy.

Also TMS:RP2 is very noisy. Talked to Edi D. from vacuum group. He would work on it this afternoon. E-Fault#6282

Entry  Friday, August 31, 2012, 11:39, Anders Mjos, NiO#1, HP-FEBIAD, ITE, TM4, , , Done, Venting vacuum chamber - source change 

Friday, August 31, 2012, 11:39: Stopped turbos.

Friday, August 31, 2012, 13:06: Venting.

Friday, August 31, 2012, 13:23: Water lines purged.

Friday, August 31, 2012, 13:25 : Vented

Entry  Tuesday, March 19, 2013, 12:34, Anders Mjos, SiC#28, , ITE, TM4, , , Done, Installation of SiC#28 LP-RFQ grab.n5HwXJ.png20130321_heating_and_signal.PNG

Tuesday, March 19, 2013, 12:32 : Turbos off (vaccum at 2E-7 Torr)

Tuesday, March 19, 2013, 13:35: Venting

Target SiC#28 LP-RFQ inserted

New bolts used. Old bolts removed.

All bolts torqued to 120 in lbs


By Sebastian (SR) & Henning

modification of 9 Pin connector needed to match wiring in TM4 (see separate e-log entry)

Tuesday, March 19, 2013, 18:32 : started roughing - SR

Tuesday, March 19, 2013, 18:52: started turbos - SR

Tuesday, March 19, 2013, 18:57: TSGIP1 on - SR

Tuesday, March 19, 2013, 19:00: turbos at speed - SR

Tuesday, March 19, 2013, 19:02: vacuum at 1.68E-5T


By Anders

Wednesday, March 20, 2013, 08:18: Opened cooling water. Vacuum stable at 6.8E-7 Torr


By Sebastian (SR) & Henning

Wednesday, March 20, 2013, 11:39: 9PIN connector in HV cage connected

        4,5,6,9 on GND 1,2 to RF, 7,8,RFoffest,Source for now also on GND

        RF: 800kHz, 20Vampl, 0.128mA

        HV cage locked up for heating

Wednesday, March 20, 2013, 16:42: heating is taken care of by ISAC operations, now at 300A / 3V TGHT  and 250A / 1.47V TBHT reading on the panel is really close

        Friedhelm restarted some of the CANBUS ports, since not all optics were working properly

Thursday, March 21, 2013, 10:53 start cooling down

       Vacuum not perfect was around 2E-6T, over nigth not full current

       Suppression tested yesterday: full beam (SRC +3V, others GND) was 40nA, while no signal on FB0B with SRC +3V, IGOffset&Exit +25V

       !!!!! but short on #7 --> 2nd Repeller, was OK when tested, after some minutes on 25V short was there, reading now (Thursday, March 21, 2013, 10:58 ) <1OHM, will be checked while heating down

       Magnet had wrong polarity - so no mass scans yesterday evening, Friedhelm looked into this this morning

      Mass scan only for good transmission mode (SRC +3V) this morning - see attached scan (seen Na, Al, K, Ca, Cr, Rb, Sr, Cs and Ba)

Thursday, March 21, 2013, 12:26: stopped turbos

     #7 still short

 


By Anders

Thursday, March 21, 2013, 13:25: Venting

    Reply  Thursday, March 21, 2013, 15:05, Sebastian Raeder, SiC#28, , ITE, TM4, , , Done, 2nd heating of SiC#28 LP-RFQ - short resolved 20130322_heating.png20130322_massscan_transmission.png20130322_massscan_suppression1.png20130322_suppression2.pnglegs.JPG

 

Anders Mjos wrote:

Tuesday, March 19, 2013, 12:32 : Turbos off (vaccum at 2E-7 Torr)

Tuesday, March 19, 2013, 13:35: Venting

Target SiC#28 LP-RFQ inserted


By Sebastian (SR) & Henning

modification of 9 Pin connector needed to match wiring in TM4 (see separate e-log entry)

Tuesday, March 19, 2013, 18:32 : started roughing - SR

Tuesday, March 19, 2013, 18:52: started turbos - SR

Tuesday, March 19, 2013, 18:57: TSGIP1 on - SR

Tuesday, March 19, 2013, 19:00: turbos at speed - SR

Tuesday, March 19, 2013, 19:02: vacuum at 1.68E-5T


By Anders

Wednesday, March 20, 2013, 08:18: Opened cooling water. Vacuum stable at 6.8E-7 Torr


By Sebastian (SR) & Henning

Wednesday, March 20, 2013, 11:39: 9PIN connector in HV cage connected

        4,5,6,9 on GND 1,2 to RF, 7,8,RFoffest,Source for now also on GND

        RF: 800kHz, 20Vampl, 0.128mA

        HV cage locked up for heating

Wednesday, March 20, 2013, 16:42: heating is taken care of by ISAC operations, now at 300A / 3V TGHT  and 250A / 1.47V TBHT reading on the panel is really close

        Friedhelm restarted some of the CANBUS ports, since not all optics were working properly

Thursday, March 21, 2013, 10:53 start cooling down

       Vacuum not perfect was around 2E-6T, over nigth not full current

       Suppression tested yesterday: full beam (SRC +3V, others GND) was 40nA, while no signal on FB0B with SRC +3V, IGOffset&Exit +25V

       !!!!! but short on #7 --> 2nd Repeller, was OK when tested, after some minutes on 25V short was there, reading now (Thursday, March 21, 2013, 10:58 ) <1OHM, will be checked while heating down

       Magnet had wrong polarity - so no mass scans yesterday evening, Friedhelm looked into this this morning

      Mass scan only for good transmission mode (SRC +3V) this morning - see attached scan (seen Na, Al, K, Ca, Cr, Rb, Sr, Cs and Ba)

Thursday, March 21, 2013, 12:26: stopped turbos

     #7 still short

 


By Anders

Thursday, March 21, 2013, 13:25: Venting

 

   Thursday, March 21, 2013, 14:46: started roughing

                Target was out, visibly inspected, nothing to be seen, no short on the target - wiring of the 9Pin connector shows short circuit inside vacuum chamber

                Wires removed - short could be reproduced with the strandings of the shielding  from the kapton twisted pairs going into the peek connector

               wire shieldings now fixed to position further away with Cu wire

               all wires against ground and each other tested for holding 250V - all fine

               everything reconnected and target put in, torcked w 120 inch pounds

Thursday, March 21, 2013, 15:05 : turbos started

Thursday, March 21, 2013, 15:14: turbos at speed

Thursday, March 21, 2013, 15:17: vacuum at 1.4E-5T

Thursday, March 21, 2013, 18:01: vacuum at 1.45E-6T opening water lines - vacuum is stable

Thursday, March 21, 2013, 19:19 : vacuum at 8.6E-7T - start ramping heater to 580A / 250 A

Friday, March 22, 2013, 00:08: target is heated full way up

           setpoint 570A and 7.250V voltage limit

           readback 564.1A and 7.201V  --> needs more voltage than the normal target !

           vacuum at 1.2E-6T

Friday, March 22, 2013, 15:15: vacuum at 5.4E-7T

         preparing for HV test and mass scan

 

        transmission mode: Source +3V, everything else on GND: 12nA - mass scan see attachment

       suppression mode 1: Source -15V, everything else on GND: 20pA - mass scan see attachment

       suppression mode 2: Source +3V, everything else on +25V: <1pA - FC0 current while biasing see attachment

 

       NOTE:  the legs of the target are glowing differently, the left leg (view from the lid side onto the target unit) glows brighter, this side was open during the sintering process of the SiC and needed more alignment at the jig --> see attached picture

       NOTE2: there is a slight increase in TGHT voltage over time: in ~ 22h from 7.201V to 7.216V

 

Friday, March 22, 2013, 21:33 : vacuum at 4.8E-7, start ramping down

Friday, March 22, 2013, 22:47: heaters down and turned off, vacuum at 2.7E-7T

Monday, March 25, 2013, 00:15: vacuum at 1.4E-7T, IG off, turbos off


By Anders

Monday, March 25, 2013, 08:18: Venting

Monday, March 25, 2013, 08:33: Purging water lines

Monday, March 25, 2013, 08:42: Target removed

Entry  Wednesday, April 10, 2013, 12:14, Anders Mjos, Ta#40, HP-SIS, ITE, TM4, 38295-4, , Done, Conditioning Ta#40 

 Wednesday, April 10, 2013, 12:13: Stopped turbos in preparation for venting the chamber.

Wednesday, April 10, 2013, 13:05: Venting

Wednesday, April 10, 2013, 13:37: Ta#40 installed with 130 in lbs torque on all bolts.

Wednesday, April 10, 2013, 13:37: Roughing

Wednesday, April 10, 2013, 13:58: Started turbos

Wednesday, April 10, 2013, 14:07: Turbos at speed

Wednesday, April 10, 2013, 14:08: Vacuum at 9.2E-6 Torr


 Thursday, April 11, 2013, 08:26: Opened cooling water. Vacuum stable at 2.2E-7 Torr


Monday, April 15, 2013, 08:40: HV conditioned to 30kV TSG:BIAS:RDCUR at 37 uA

Monday, April 15, 2013, 08:46: Started Target Heat Ramp 580A / 230A

Monday, April 15, 2013, 13:30: Target at temperature TGHT:RDCUR=574A, TBHT:RDCUR=230A

Monday, April 15, 2013, 15:10: Mass scan

Monday, April 15, 2013, 16:21: Target will be left at temperature overnight.


 Tuesday, April 16, 2013, 08:40: Mass scan

Tuesday, April 16, 2013, 13:08: Started Target Cooling Sequence


 Wednesday, April 17, 2013, 08:43: High voltage BIAS to zero

Wednesday, April 17, 2013, 08:47: Turbos off

Wednesday, April 17, 2013, 16:20: Target will likely be removed tomorrow Thursday.


Thursday, April 18, 2013, 11:13  : Venting

Thursday, April 18, 2013, 11:17: Water lines purged

 Thursday, April 18, 2013, 11:29: Chamber vented. Target Removed

    Reply  Thursday, April 18, 2013, 13:50, Anders Mjos, Ta#40, HP-SIS, ITE, TM4, 38295-4, , Done, Ta#40 stored under vacuum 

Target installed at the Test Stand after an inspection in the lab. EE was cleand. All bolts torqued to 130 in lbs

Thursday, April 18, 2013, 13:48: Rouging

Thursday, April 18, 2013, 14:11: Starting turbos

Thursday, April 18, 2013, 14:20 : Turbos at speed

Thursday, April 18, 2013, 14:21 : Vacuum at 2.3E-5 T 


Friday, April 19, 2013, 08:23: Opened cooling water. Vacuum stable at 9.6E-6 T


Vacuum is somewhat higher than expected (5.2E-7 T) . Will went and clean the o-rings on the doors.

Monday, April 22, 2013, 09:32: Turbos off.

Monday, April 22, 2013, 10:57: Venting

Monday, April 22, 2013, 12:25: Vented

Monday, April 22, 2013, 14:09: Roughing

Monday, April 22, 2013, 14:31: Started Turbos

Monday, April 22, 2013, 14:40: Turbos at speed

Monday, April 22, 2013, 14:41: Vacuum at 1.8E-5 T


Tuesday, April 23, 2013, 09:52 : Vacuum at 2.6E-7 T - already an improvement from yesterday


Thursday, April 25, 2013, 08:47: Stopped turbos. A test target with at new FEBIAD coil will be tested.

Thursday, April 25, 2013, 13:27: Venting

Entry  Wednesday, July 10, 2013, 10:21, Anders Mjos, SiC#29, HP-FEBIAD-CTL, ITE, TM4, 38481-6, 39956-4, Done, Testing SiC#29 CTL Target 

Wednesday, July 10, 2013, 10:20 : Turbos off. Vacuum at 1.3 E-7 T

Wednesday, July 10, 2013, 11:23: Venting chamber 

Wednesday, July 10, 2013, 12:00: Vented

Wednesday, July 10, 2013, 12:38: Roughing

Wednesday, July 10, 2013, 12:54: Pumping on gas lines for 10 min.

Wednesday, July 10, 2013, 12:58: Starting Turbos

Wednesday, July 10, 2013, 13:07 : Both turbos at speed. TP1A timed out one.

Wednesday, July 10, 2013, 13:08 : Vacuum at 1.5E-5 T

 

T/C connectors removed from HV rack. All connections put to ground.


Thursday, July 11, 2013, 08:43: Opened up cooling water supply. Vacuum stable at 2.2E-7 T

Thursday, July 11, 2013, 08:58: Starting ramp up of TGHT and TBHT to 100A and 50A respectively to verify proper function of the new power supply set-up.

Thursday, July 11, 2013, 09:20: TBHT reached 50A. EPICS read back 51.2A / 0.186V. P/S local read back 51A / 0.20V

Thursday, July 11, 2013, 09:44: BIAS 30kV, EE -800V, EZL 13kV

Thursday, July 11, 2013, 09:44: TGHT reached 100A. EPICS read back 100.2A / 0.488V. P/S local read back 99A / 0.46V

Thursday, July 11, 2013, 09:46: IV4 opened

Thursday, July 11, 2013, 09:53: Starting ramp up of TGHT and TBHT to 500A and 200A respectively

Thursday, July 11, 2013, 10:00: Coil and Anode to 50A and 200V respectively

Thursday, July 11, 2013, 14:59: TGHT and TBHT to 500A and 207A EPICS read back. Local read back 500A and 205A.

Thursday, July 11, 2013, 15:03: Opening gas lines into chamber.

Thursday, July 11, 2013, 15:12: Starting ramp up of TGHT and TBHT to 550A and 220A respectively

Thursday, July 11, 2013, 15:21: Some current on FC0 at TBHT 210A

Thursday, July 11, 2013, 15:25: He leak valve at 5.5

Thursday, July 11, 2013, 16:07: Will leave target in current condition over night and continue the test tomorrow.


Friday, July 12, 2013, 08:25: Target ran without interruptions overnight. Started magnet scan. Masscorr constants had to be reentered after the reboot of EPICS.

Friday, July 12, 2013, 10:30: TMS:Q1 and TMS:Q6 found off. Restarted.

Friday, July 12, 2013, 10:32: Starting TGHT ramp to 580A. Increased EE to -1200V

Friday, July 12, 2013, 10:47: Reached 580A. EPICS 581.7A / 5.724V. PS local 580A / 5.69V.

Friday, July 12, 2013, 10:51: Starting manual ramp of TBHT.

Friday, July 12, 2013, 11:14: Autoramping TBHT to 250A

Friday, July 12, 2013, 11:23: Reached 250A. EPICS 259.6A / 1.934V. PS local  256A / 1.93V

Friday, July 12, 2013, 11:35: Manual ramp. ANODE current @ 2mA seen at TBHT @ 262A.

Friday, July 12, 2013, 11:41: BIAS spark seen on current and vacuum.

Friday, July 12, 2013, 12:09: TBHT:RDCUR  at 269A

Friday, July 12, 2013, 13:18:TBHT:RDCUR  at 280A.. PS local 277A.

Friday, July 12, 2013, 13:21: EE to -1500V / 510uA

Friday, July 12, 2013, 13:30: Ne leak opened.

Friday, July 12, 2013, 14:12: Mass scan started.

Friday, July 12, 2013, 15:04: A thumb sound and flash was seen. Confirmed with AAPS operator. TMS:SX3 went off. TMS:MB1 does not respond to current adjustments.

Friday, July 12, 2013, 15:53: The source will be left in it's present state over the weekend.


Saturday, July 13, 2013, 07:10: FC0 Bias found off. Restarted. Could be related to sparking. 


No further issues over the weekend.

Monday, July 15, 2013, 09:10: Starting mass scan.

Monday, July 15, 2013, 10:39: Magnet at Ne (20 amu). FC6 1.3E-10. Ne gas off: FC6 < 1E-11

Monday, July 15, 2013, 10:45: Ne gas on.

Monday, July 15, 2013, 10:50: EE to 2kV. EE:RDCUR at 684 uA.

Monday, July 15, 2013, 13:27: Manually increasing TBHT to 290A. Local 287A.

Monday, July 15, 2013, 15:07: Cooling down target.

Monday, July 15, 2013, 15:26: COIL off. Gases off (earlier). ANODE off.

Monday, July 15, 2013, 15:31: IV4 closed.


Tuesday, July 16, 2013, 08:21: BIAS, EZL and EE to zero.

Tuesday, July 16, 2013, 08:24: Turbos off. Vacuum at 1.3E-7 T.

Tuesday, July 16, 2013, 15:12: Venting

Tuesday, July 16, 2013, 15:38: Target removed.

Entry  Friday, August 30, 2013, 15:09, Anders Mjos, NiO#2, HP-FEBIAD, ITE, TM3, 39530-6, 39069-4, Done, Conditioning of NiO#2 2013-09-12_NiO#2_TBHT_jump.PNG

Friday, August 30, 2013, 15:09 : Turbos stopped in preparation for installation. 

Friday, August 30, 2013, 16:22: Venting

Friday, August 30, 2013, 17:08: Roughing with NiO#2

Friday, August 30, 2013, 17:27: Starting turbos

Friday, August 30, 2013, 17:35: Turbos at speed

Friday, August 30, 2013, 17:37:  Vacuum at 1.9 E-7 T


Monday, September 09, 2013, 14:04: Opened up water. Vacuum stable at 1.5E-7 T


Tuesday, September 10, 2013, 08:59: Pumping out the gas lines.

Tuesday, September 10, 2013, 09:10: Gas lines evacuated.

Tuesday, September 10, 2013, 09:23: TPS:IV4 opened

Tuesday, September 10, 2013, 10:06: TGHT PS was off. Debiased to access el cage.

Tuesday, September 10, 2013, 10:07: EZL/EE/BIAS: 15/2/30 kV 61/674/55 uA

Tuesday, September 10, 2013, 10:08: COIL/ANODE: 50A/200V

Tuesday, September 10, 2013, 10:09: Started target heat to TGHT/TBHT 250/230A

Tuesday, September 10, 2013, 15:12: Started target heat to TGHT 350A (TBHT remains at 230A)


Wednesday, September 11, 2013, 13:06: Heating TGHT to 500A


Thursday, September 12, 2013, 08:44: Heating TGHT to 580A

Thursday, September 12, 2013, 09:39: Heating TBHT to 260A

Thursday, September 12, 2013, 10:06: BIAS sparking occurred  at 9:48 TBHT:RDCUR at 256A. Gradually reduced TBHT:RDCUR to 254A. Sparking stopped after ~20 min. ANODE:RDCUR, EE:RDCUR and IG1:RDVAC showed correlated sparking responses. ANODE:RDCUR went to 0 mA and back up after sparking had stopped.

 Thursday, September 12, 2013, 10:30: Manually increased TBHT:RDCUR to 260A.

Thursday, September 12, 2013, 11:06: A jump in TBHT:RDVOLT and TBHT:RDCUR at 10:44. Reduced TBHT:RDCUR to 255A

Thursday, September 12, 2013, 12:10:  TPS:Q4 was taken out by a spark. Restarted.

Thursday, September 12, 2013, 12:19: EZL to 13 kV

Thursday, September 12, 2013, 13:14: TBHT:RDCUR to 260A

Thursday, September 12, 2013, 13:31: TBHT:RDCUR to 265A. Sparking returns. Lower to 260A


Friday, September 13, 2013, 10:51: Increased TBHT:RDCUR to 265A

Friday, September 13, 2013, 10:58 : Increased TBHT:RDCUR to 270A

Friday, September 13, 2013, 11:05: Some sparking. Lowered EE to 1kV

Friday, September 13, 2013, 11:07 : Increased TBHT:RDCUR to 275A

Friday, September 13, 2013, 11:15 : Increased TBHT:RDCUR to 280A

Friday, September 13, 2013, 11:24 : Increased TBHT:RDCUR to 290A. ANODE:RDCUR 8.5mA. FC0 1.3E-6 A

Friday, September 13, 2013, 11:53: SV5 and SV2 gas lines opened.

Friday, September 13, 2013, 12:05: A spark took out Q4. Restarted.

Friday, September 13, 2013, 12:07: Lowered TBHT:RDCUR to 285A

Friday, September 13, 2013, 13:03: Started mass scan.

Friday, September 13, 2013, 14:27: Lowered TBHT:RDCUR to 280A

Friday, September 13, 2013, 15:01 : Lowered TBHT:RDCUR to 270A


Monday, September 16, 2013, 08:00: Mass scan started. 

Monday, September 16, 2013, 09:00: Starting heater ramp down. 2A/min. Gas lines closed.

Monday, September 16, 2013, 13:30: Source off. Target debiased.

Monday, September 16, 2013, 13:56: Turbos stopped

Monday, September 16, 2013, 14:50: Venting.

Entry  Monday, September 16, 2013, 17:07, Anders Mjos, NiO#2, HP-FEBIAD, ITE, TM3, 39530-6, 39069-4, Done, Conditioning NiO#2 take 2 

The GE on the Source tray and EE on the target was cleaned. The target will be conditioned again to verify if sparking has been reduced. Torque 120 in lbs

Monday, September 16, 2013, 17:05: Roughing. The roughing pump is somewhat noisy.

Monday, September 16, 2013, 17:26: Starting turbos.

Monday, September 16, 2013, 17:34: Turbos at speed

Monday, September 16, 2013, 17:36: Vacuum at 3.8E-5 T.


Tuesday, September 17, 2013, 08:10: Opened cooling water. Vacuum stable at 6.5E-7. EE flow 4.8 l/min 27.9 C

Tuesday, September 17, 2013, 08:20: Target biased: 30kV, 15kV, -1kV.

Tuesday, September 17, 2013, 08:25: Opening gas line SV5 and Ne SV3 evacuated

Tuesday, September 17, 2013, 08:32: Started auto-ramping to 580A/230A

Tuesday, September 17, 2013, 08:34: Coil to 50A, Anode to 200V (0mA)

Tuesday, September 17, 2013, 08:36: Opened IV4

Tuesday, September 17, 2013, 10:39: EE flow 4.9 l/min 28.5 C

Tuesday, September 17, 2013, 13:05: EE flow 4.9 l/min 28.8 C

Tuesday, September 17, 2013, 15:03: EE flow 4.9 l/min 28.8 C

Tuesday, September 17, 2013, 15:04 :TGHT at 580A, TBHT at 280A.

Tuesday, September 17, 2013, 15:30: TBHT:RDCUR to 290A 


Wednesday, September 18, 2013, 08:07: Stared mass scan.

Wednesday, September 18, 2013, 08:08:EE flow 4.9 l/min 28.8 C

Wednesday, September 18, 2013, 09:14: EE to 2kV. Current at 676 uA

Wednesday, September 18, 2013, 09:23: Opened He gas to 6.0. It was later found the SV2 was closed. I.e. no He was supplied to the target.

Wednesday, September 18, 2013, 09:26: Tuning source. EE 0.8kV, EZL 1.3kV

Wednesday, September 18, 2013, 09:32: Started mass scan.

Wednesday, September 18, 2013, 09:55: A jump in BIAS current from 42 to 61 uA. Came down towards 42 after 30 min

Wednesday, September 18, 2013, 10:22: Ramping down heaters at 2A and 2.5A /min

Wednesday, September 18, 2013, 10:23: He and Ne off.

Wednesday, September 18, 2013, 10:48: Gas lines closed.

Wednesday, September 18, 2013, 10:53: EE flow 4.9 l/min 28.5 C

Wednesday, September 18, 2013, 10:55: IV4 closed.

Wednesday, September 18, 2013, 10:59: Target de-biased.

Wednesday, September 18, 2013, 12:18: Heaters off.

Wednesday, September 18, 2013, 12:18: Stopped turbos.

Wednesday, September 18, 2013, 12:56: Started wenting.

Wednesday, September 18, 2013, 13:02: EE flow 4.9 l/min 28.2 C

Wednesday, September 18, 2013, 13:20 : Chamber vented.

Entry  Friday, March 28, 2014, 10:39, Anders Mjos, TiC#4, HP-SIS, ITE, TM3, , , In progress, Conditioning TiC#4 

NOTE:

TBHT Power Supply is 600A. EPICS thinks it is 500. Multiply current setting with 1.2 for actual current to the tube.

Friday, March 28, 2014, 10:38: Stopped turbos. Vacuum at 1.3E-7 T 

Friday, March 28, 2014, 15:05: Venting

 


By RM

Friday, March 28, 2014, 15:22: Target assembly installed

Friday, March 28, 2014, 15:43: Chamber Roughing started

Friday, March 28, 2014, 15:58: Turbos started

Friday, March 28, 2014, 16:03: TP1B at speed

Friday, March 28, 2014, 16:06: TP1A at speed

Friday, March 28, 2014, 16:07: IG1 Turned on - reading 1.29e-05T

 


 By R.M.

Monday, March 31, 2014, 09:55: Water to heatshield line turned on, no change in vacuum: 1.31e-07 T

 

 

 

Entry  Tuesday, April 01, 2014, 11:09, Aurelia Laxdal, TiC#4, HP-SIS, ITE, TM3, , , In progress, HV and Heaters Conditioning  ITE-TM3-TiC#4-HP-SIS_Test_Stand_Conditioning.docx

Started March 31, 2014:

- did the HV conditioning up to 30kV.

April 1, 2014:

- started the Heaters Conditioning. 

Heaters Conditioning finished.

The Power Supplies front panel:

 

TGHT: 5.56V and 580A

TBHT: 2.23V and 227A

April 2, 2014:

 

- did a mass scan. NOTE: data is shifted by 10-15%.

plotdump-local-clean.txt_Apr2_14_16-33-19.txt

 

After the scan finished I found the Test Stand EPICS screens whited-out. Decided with Friedhelm to leave it as it was for the night and to contact Controls next day to reboot it without tripping the heaters and the HV.

April 3, 2014:

Found everything recovered. Except: “SOURCES ARCH IS RUNNING” was red. So, I restarted it. Jane Richards and Friedhelm didn’t do any IOC reboot. Also found that the data from yesterday’s scan was saved (see the previous scan).

Did another mass scan:  plotdump-local-clean.txt_Apr3_14_10-18-13.txt

NOTE: data is shifted by 10-15%.

Cooling down .

 

Entry  Thursday, April 03, 2014, 16:46, Aurelia Laxdal, TiC#4, HP-SIS, ITE, TM3, , , Done, HV and Heaters Conditioning ITE-TM3-TiC#4-HP-SIS_Test_Stand_Conditioning.docx

HV and Heaters Conditioning had finished. The target was cooled down and it's ready for the on-line installation.

    Reply  Friday, April 04, 2014, 08:24, Anders Mjos, TiC#4, HP-SIS, ITE, TM3, , , In progress, Venting 

 

Aurelia Laxdal wrote:

HV and Heaters Conditioning had finished. The target was cooled down and it's ready for the on-line installation.

 

Friday, April 04, 2014, 08:23: Target bias, EE and EZL to zero. Turbos off.

Friday, April 04, 2014, 10:14: Venting 

Friday, April 04, 2014, 10:48: Target removed - By R.M.

Entry  Monday, May 12, 2014, 14:20, Anders Mjos, SiC#30, HP-FEBIAD, ITE, TM3, 38481-8, 39956-5, In progress, Conditioning SiC#30 SiC#30_Conditioning.docx

Monday, May 12, 2014, 14:14 : Roughing

Monday, May 12, 2014, 14:34: Starting turbos

Monday, May 12, 2014, 14:42 : Turbos at speed

Monday, May 12, 2014, 14:44 : Vacuum at  1.7E-5 T


Tuesday, May 13, 2014, 10:51: Opened water for HS circuit. Vacuum stable at 2.2E-7 T. Minor spike to 2.5E-7 T for 10 s.

Tuesday, May 13, 2014, 10:54: Roughing out gas lines.

Tuesday, May 13, 2014, 11:30: Opening SV5 and SV2 to evacuate gas lines completely.

Tuesday, May 13, 2014, 11:58: BIAS to 30kV, EZL to 13 kV. EE to 1.5 kV.

Tuesday, May 13, 2014, 11:59: Opening isolation valve

Tuesday, May 13, 2014, 12:12: Started heating to 450A / 200A TGHT / TBHT.


Target heating stopped at 167 A - likely caused by network problems. Multiple gaps in strip tool. Indicating lost network connection.

Wednesday, May 14, 2014, 10:07: Resuming heating to 450A / 200A TGHT / TBHT (EPICS 170A)

Wednesday, May 14, 2014, 10:12: De-biasing to investigate ANODE/CATHODE BIAS

Switched ON ANODE/CATHODE BIAS PS.

Wednesday, May 14, 2014, 10:22: BIAS to 30kV, EZL to 13 kV. EE to 1.5 kV.

Wednesday, May 14, 2014, 16:07: Continue heating TGHT to 500A

Wednesday, May 14, 2014, 16:33: TGHT at 500A. TBHT at 203 A.


Thursday, May 15, 2014, 14:57: Switched OFF/ON IOC to recover from white-out.

Thursday, May 15, 2014, 15:51: Started heating to 550A / 240A 


COIL to 50A
ANODE to 200V
TGHT to 580A
TBHT to 280A

Friday, May 16, 2014, 11:28  : Opening Ne

Friday, May 16, 2014, 11:56: TBHT to 290 A

Friday, May 16, 2014, 14:12: Started cool down. ANODE/CATHODE Bias requires reconfiguration.


Tuesday, May 20, 2014, 11:10: Ray and co is checking the configuration and troubleshooting the burnt off GND connection. The Test Stand will be configured to CATHODE negative BIAS.

Tuesday, May 20, 2014, 12:35: BIAS, EZL, EE, COIL, ANODE ON.

Tuesday, May 20, 2014, 12:35: Gas lines pumped.

Tuesday, May 20, 2014, 12:35: Auto heating to 240A/500A at 1A/2A /min.

Tuesday, May 20, 2014, 12:44: IV4 opened 

Entry  Wednesday, May 21, 2014, 17:05, Aurelia Laxdal, SiC#30, HP-FEBIAD, ITE, TM3, , , In progress, SiC#30 HV and Heaters conditiong 

As per Friedhelm the conditioning settings are:

TGHT 580A

TBHT 290A

COIL 80A

ANODE 200V

 

Ramped up completed:

 

TGHT 580A/5.683V

TBHT 242A/2.295V (EPICS settings) and 289A/2.29V at the PS

COIL 80A

Current on the Anode = 13.431mA

 

 

Entry  Monday, May 26, 2014, 14:15, Aurelia Laxdal, SiC#30, HP-FEBIAD, ITE, TM3, , , Done, SiC#30 HV and Heaters Conditioning  SiC#30_Conditioning_2nd_time.docx

HV and Heaters Conditioning for SiC#30 was completed Friday, May 23, 2014. The target was cooled down and it's ready for the on-line installation.

    Reply  Friday, June 13, 2014, 08:43, Anders Mjos, SiC#30, HP-FEBIAD, ITE, TM3, 38481-8, 39956-5, Done, SiC#30 HV and Heaters Conditioning  

Aurelia Laxdal wrote:

HV and Heaters Conditioning for SiC#30 was completed Friday, May 23, 2014. The target was cooled down and it's ready for the on-line installation.

 Friday, June 13, 2014, 08:43: Turbos stopped. Vacuum at 1.2E-7 T


Monday, June 16, 2014, 08:26: Venting. Water purged.

Monday, June 16, 2014, 09:00: Target removed

    Reply  Tuesday, June 17, 2014, 15:22, Anders Mjos, SiC#30, HP-FEBIAD, ITE, TM3, 38481-8, 39956-5, In progress, SiC#30 HV and Heaters Conditioning  SiC#30_Conditioning_3rd_time.docx

Anders Mjos wrote:

Aurelia Laxdal wrote:

HV and Heaters Conditioning for SiC#30 was completed Friday, May 23, 2014. The target was cooled down and it's ready for the on-line installation.

 Friday, June 13, 2014, 08:43: Turbos stopped. Vacuum at 1.2E-7 T


Monday, June 16, 2014, 08:26: Venting. Water purged.

Monday, June 16, 2014, 09:00: Target removed

The target assembly did not pass the megger test between anode and heat shield after the previous conditioning. The AlN insulators were found to have failed during the conditioning. The coil insulation was burnt. AlN insulators and anode ware replaced.

Tuesday, June 17, 2014, 15:22: Roughing

By R.M.

Tuesday, June 17, 2014, 15:52: Turbos Started

Tuesday, June 17, 2014, 15:54: TP1B at speed

Tuesday, June 17, 2014, 15:57: IG1 Turned on  1.92e-05T

Tuesday, June 17, 2014, 15:59: TP1A at speed

Tuesday, June 17, 2014, 15:59: IG1 1.31e-05T


By AM

Wednesday, June 18, 2014, 08:24: Opened HS water circuit. Vacuum stable at 2.2E-7 T.

Wednesday, June 18, 2014, 08:40: Pumping on gas lines.

Wednesday, June 18, 2014, 08:49: Closed pump valve on gas lines.

Wednesday, June 18, 2014, 08:51: Opening TSH:SV5

Wednesday, June 18, 2014, 08:53: Opening TSH:SV2

Wednesday, June 18, 2014, 09:00: BIAS/ EZL / EE 30 / 13 / -1.5 kV

Wednesday, June 18, 2014, 09:04: Starting target heating to 500 / 240 A

Wednesday, June 18, 2014, 09:07: COIL to 50 A. ANODE to 200 V

Wednesday, June 18, 2014, 09:33: OPEN TPS:IV4 

Wednesday, June 18, 2014, 14:05: TBHT at 240 A 2.6 V. TGHT still ramping (403 A)

Wednesday, June 18, 2014, 15:03: TGHT at 500 A 4.5 V 


Thursday, June 19, 2014, 08:51: Ramping to 580 A / 265 A

Thursday, June 19, 2014, 09:37: Continue ramping TBHT to 290A

Thursday, June 19, 2014, 09:44: 8E-8 A on FC0

Thursday, June 19, 2014, 10:52: TBHT at 305A. Running mass scan.

Thursday, June 19, 2014, 11:36: Opening for He.

Thursday, June 19, 2014, 11:46: Opening for Ne.

Thursday, June 19, 2014, 11:54: Lowering TBHT to 300 A

Thursday, June 19, 2014, 13:01: Mass scan. ~1E-10 A Ne current on FC6 with Ne open.

Thursday, June 19, 2014, 15:06: Mass scan up.

Thursday, June 19, 2014, 16:00: Mass scan down.

Thursday, June 19, 2014, 16:49: Started cooling down target.


Friday, June 20, 2014, 08:53: Target de-biased. Turbos off.

Friday, June 20, 2014, 10:23: Venting. Purging water from  HS circuit.