  983   Wednesday, October 18, 2023, 15:43 Aaron Schmidt LP-SIS  45447-1245235-17In progressConditioning UC#43 (empty) w/ gas lineThermocouples attached on end plate
Indium salt @ 10 µl
3 wraps of Ta HS on oven. Gas line
 UC#43_Conditioning_empty_with_Gas_mod.docxUC#43_HS_with_gas_line_mod_-_Test_2.docxUC#43_HS_with_gas_line_mod_-_HV_Test.docx 
  984   Monday, October 30, 2023, 16:01 Aaron Schmidt LP-SIS  45220-245235-13In progressHV power surge test plus mass scans Monday, October 30, 2023, 16:00 
Roughing

Tuesday, October 31, 2023,
  
  985   Thursday, November 16, 2023, 09:43 Aaron Schmidt LP-SIS    In progressThermal testsAurelia has been testing on the ISAC TS
since last week. Thermocouples are installed
in the end cap, left side & the ionizer.
  
  986   Monday, November 27, 2023, 16:09 Ferran Boix Pamies LP-SIS  45220-245235-13In progressHV power surge test plus mass scansMonday, November 27, 2023, 16:09 
Roughing
Monday, November 27, 2023, 17:22
  
  987   Tuesday, December 12, 2023, 12:41 Aaron Schmidt      DoneSource Tray / TS inspectionTuesday, December 12, 2023, 12:39: Visual
inspection.
Source tray: OK. Minor cracks on
  
  989   Thursday, January 18, 2024, 10:44 Aaron Schmidt      DoneThermal tests 2December 18 - January 15. Were not logged.
Placed holder. Aurelia's tests. Included
thermocouples in the oven & ionizer.
  
  990   Thursday, January 18, 2024, 10:47 Aaron Schmidt      Problems/SolutionsFC0 Solenoid Replaced.Issues with valve operations due to a leak
in the solenoid valve above FC0. The HPA
leak did not allow for sufficient pressure
  
  991   Thursday, January 18, 2024, 10:49 Aaron Schmidt LP-SIS  44139-245235-22In progressConditioning UCx HS Straight/closed TGHT tube oven installed.
SIS Assembly.
Thursday, January 18, 2024, 10:32:
  
  992   Monday, January 22, 2024, 13:55 Aaron Schmidt LP-SIS  45447-1945235-22In progressConditioning UCx HS - 2Conditioning HS for UCx. LP-SIS oven /
end caps installed
Monday, January 22, 2024, 13:53:
  
  994   Tuesday, February 06, 2024, 14:09 Aaron Schmidt      Problems/SolutionsFC0 Solenoid issueTuesday, February 06, 2024, 14:06: Attempted
to 'Close' FC0. While it succeeded in moving
into position, HPA rushed out of the exhaust.
  
  995   Friday, February 16, 2024, 05:03 Aaron Schmidt      Problems/SolutionsCoil PS issue15-02-2024
The coil PS control card is fried.
Roughly since the beginning of December.
 Coil_PS_Control_Card.png 
  997   Tuesday, February 20, 2024, 14:22 Aaron Schmidt       Set to Cathode BIAS ModeTuesday, February 20, 2024, 14:20: TS to
wired to Cathode BIAS mode as per ISK4563D.

Monday, March 11, 2024, 13:59:
  
  998   Monday, February 26, 2024, 10:24 Aaron Schmidt      Problems/SolutionsTMS:RP2 purge. TS exhaust clearing. + TMS:TP6Monday, February 26, 2024, 10:12:
While attempting to cycle FC0, noticed
that the turbo pumps TMS:TP6 & TMS:TP2
  
  999   Thursday, March 14, 2024, 17:43 Dave Neilson LP-FEBIAD  44692-4 42972 Calibrated Leak Development Thursday, March 14, 2024, 15:39:
Roughing
Thursday, March 14, 2024, 16:20:TP1B
  
  1000   Thursday, April 04, 2024, 10:38 Dave Neilson LP-SIS  44691-845235-26DoneMass marker testing Thursday, April 04, 2024, 09:49:
Target inserted yesterday, April 3. mass
marker tube connections carefully confirmed.
  
  1001   Tuesday, April 09, 2024, 15:28 Aaron Schmidt       Set to Anode BIAS Mode & Old gas leak installed.Switched to Anode mode on March 28 including
polarity. The old calibrated leak was also
re-installed.
  
  1003   Monday, April 15, 2024, 14:35 Aaron Schmidt      Problems/SolutionsTSH:EE IssuesMonday, April 15, 2024, 14:33: On Friday
it was noted that the EE was being troublesome.
If we put -500 V on the EE the PS would deliver
  
  1006   Wednesday, April 24, 2024, 16:21 Dave Neilson LP-SIS  44691-845235-26   Wednesday, April 24, 2024, 16:20: 
   Target assembly installed.
Wednesday, April 24, 2024, 16:20: 
  
  1010   Thursday, May 30, 2024, 16:00 Aaron Schmidt LP-FEBIAD  44692-445235-18In progressConditioning spare FEBIADAnode short repaired (Should be :) )
Thursday, May 30, 2024, 15:56: Roughing.
Thursday, May 30, 2024, 16:10: Waterline
  
  1012   Tuesday, July 23, 2024, 09:43 Dave Neilson LP-SIS  44691-845235-26Donemass marker - reservoir testingWednesday, July 22, 2024, 11:41  -
target installed
Wednesday, July 22, 2024, 13:31 -
  