Wednesday, October 18, 2023, 15:43, Aaron Schmidt, , LP-SIS, , , 45447-12, 45235-17, In progress, Conditioning UC#43 (empty) w/ gas line
|
Thermocouples attached on end plate
Indium salt @ 10 µl
3 wraps of Ta HS on oven. Gas line on center block. Empty oven.
Wednesday, October 18, 2023, 15:13: Roughing
Wednesday, October 18, 2023, 15:35: Waterline FS#5 on.
Wednesday, October 18, 2023, 15:42: TP1B on.
Wednesday, October 18, 2023, 15:52: TP1A on.
Wednesday, October 18, 2023, 16:00: IG1 on.
Thursday, October 19, 2023, 07:34: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Thursday, October 19, 2023, 09:15: IV4 opened.
Thursday, October 19, 2023, 09:42: HV sources on.
Thursday, October 19, 2023, 09:43: BIAS / EE / EZL @ 1 / -0.5 / 1 kV.
Thursday, October 19, 2023, 09:45: Optics are set. Standard tune.
Thursday, October 19, 2023, 10:40: HV to 0 kV. Cage open.
Thursday, October 19, 2023, 12:16: Cage closed. HV sources on. Optics set.
Thursday, October 19, 2023, 13:41: 1st set of mass scans complete. Optics set to 'Fernando's Tune',
Friday, October 20, 2023, 06:29: Mass & wire scans continue.
Friday, October 20, 2023, 10:33: BIAS / EE / EZL @ 43 / -2.2 / 18.5 kV.
Friday, October 20, 2023, 11:00: Spark* Optics needed full reset.
Friday, October 20, 2023, 12:48: HV to 0 kV. HV test done
Tuesday, October 24, 2023, 09:39: PS / sources off. IV4 closed - Tripped - Reset.
Tuesday, October 24, 2023, 09:41: IG1 off. TP off. |
Monday, October 30, 2023, 16:01, Aaron Schmidt, , LP-SIS, , , 45220-2, 45235-13, In progress, HV power surge test plus mass scans
|
Monday, October 30, 2023, 16:00 Roughing
Tuesday, October 31, 2023, 08:58 Turbos on the afternoon before, TP1A timed out which delayed for another 30min turning on both TP. Now 3e-6 Torr in IG1. - FBP
Tuesday, October 31, 2023, 09:38: FS#5 open. Vacuum Stable @ 2.96e-06T
Tuesday, October 31, 2023, 09:40: PS / sources on.
Tuesday, October 31, 2023, 10:32 Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Tuesday, October 31, 2023, 12:07 HV cage closed. TSG:BIAS and TSH:EE PS are on. Waiting for TGHT ramp up to finish.
Tuesday, October 31, 2023, 14:21: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Tuesday, October 31, 2023, 14:39 IG1 5e-6Torr , TGHT ramp up on hold.
Tuesday, October 31, 2023, 14:40 Starting HV tests.
Tuesday, October 31, 2023, 15:10 HV tests went up to 53kV until gauge on Faraday cage started sparking. TP6 seems to have tripped after a few sparks from that gauge. The TC wire seems to be placed to conservatively.
Wednesday, November 01, 2023, 08:06: TP6 Was tripped. IV4 closed. TP6 Restarted. - AS
Wednesday, November 01, 2023, 08:10: Tp6 on. IV4 open.
Wednesday, November 01, 2023, 09:32: HV to 0 kV.
Wednesday, November 01, 2023, 09:33: Auto-cooling @ 2 A per min.
Monday, November 06, 2023, 09:07: IV4 closed. PS off. IG1 & turbos off. |
Thursday, November 16, 2023, 09:43, Aaron Schmidt, , LP-SIS, , , , , In progress, Thermal tests
|
Aurelia has been testing on the ISAC TS since last week. Thermocouples are installed in the end cap, left side & the ionizer.
No elog was initiated, but much has happened.
Site wide power outage on Friday/Saturday caused problems. The TS was running at that time & was also affected. Reboots occurred on the weekend & testing resumed. IG6 was reset yesterday.
Thursday, November 16, 2023, 09:30: IV4 closed. TP6, TP2, TP1B, TP1A off. IG6 & IG1 off. PS off.
Thursday, November 16, 2023, 13:11: TP6 & TP2 restarted.
Monday, November 20, 2023, 12:06: IV4 closed. IG6 off. TP6 & TP2 off.
Monday, November 20, 2023, 12:42: Venting beamline side. |
Monday, November 27, 2023, 16:09, Ferran Boix Pamies, , LP-SIS, , , 45220-2, 45235-13, In progress, HV power surge test plus mass scans
|
Monday, November 27, 2023, 16:09 Roughing
Monday, November 27, 2023, 17:22 Both turbos are on, leaving vacuum over night.
Tuesday, November 28, 2023, 09:28 after pumping over night IG1 is at .15e-6 T. Water cooling on.
Tuesday, November 28, 2023, 14:34 HV test started. Sparks on the TC seen at BIAS/EE/EZL 31/-1.8/15kV. TC values recovered after sparks, TP6 tripped during sparks as well. Venting chamber to reposition TC.
Tuesday, November 28, 2023, 17:37 I couldn't manage to close properly the side door of the chamber... waiting for help tomorrow.
Wednesday, November 29, 2023, 10:51 Roughing started earlier in the morning. IG1 at 1e-5 T. Ramping up bias.
Wednesday, November 29, 2023, 11:41 HV tests lead to 45kV sparks on the TC. Nothing seen on the RPi.
Wednesday, November 29, 2023, 13:22 The ballast of TMSRP2 was opened to attempt to improve the roughing in the beam line section. Things appear to be somehow better now, TMSTP6 and TMSTP2 are on now.
Wednesday, November 29, 2023, 16:00 IG1 is at 3.58e-6. HV tests starting again.
Wednesday, November 29, 2023, 23:36 HV tests ended earlier in the afternoon. No spark up to 55kV when gauge in the HV cage started sparking as usual.
Wednesday, November 29, 2023, 23:38 TGHT and TBHT ramp up in preparation of mass scans in the morning. 1A/30s up to TGHT:400A, TBHT:160A
Thursday, November 30, 2023, 09:05 TGHT and TBHT ramp up in preparation of mass scans in the morning. 1A/30s up to TGHT:580A, TBHT:230A
Thursday, November 30, 2023, 12:12 Mass scans started earlier in the morning. 1st scan completed at 0.1A/s, repeating it again now with 0.05A/s.
Thursday, November 30, 2023, 15:04 HV tests again up to 55kV. 2 sparks inside the vacuum, to be checked if they affected TC measurement with the pi. Gauge still sparks in the upper HV cage.
Friday, December 01, 2023, 12:05. Error saving mass scan data Thursday. Repeating mass scans at 0.02,0.01,0.005 scan speeds. note* must delete old data prior to saving. -> save procedure: Delete Old Data, Right click plot, save as plot.txt, click Clean, Show/Save Data, enter file name and save. Filenames: 2023-12-01-*
Friday, December 01, 2023, 15:22. Spent some time selectively tuning various elements of the beam. Report in local folder, file "2023-12-01 beam tuning".
Friday, December 01, 2023, 15:23. Recording mass scan with inactive quadrupole elements. File name 2023-12-01_Q-off.txt
Sunday, December 03, 2023, 22:02 : Vacuum looks good. 4e-7 T. Heating up target for Monday morning. 1A/30s up to TGHT:580A, TBHT:230A
Monday, December 04, 2023, 12:21: This morning, increased BIAS to 30kV. Ran mass scan with adjusted beam tune up to FC0. This mass scan was repeated with inactive quadrupole elements up to FC0 to compare with Friday. 2023-12-02_RBsalt_SIS_test1.txt and 2023-12-02_RBsalt_SIS_test2.txt
Tuesday, December 05, 2023, 14:12 HV tests restarted, TC wire brought closer to the ground wall. IG1 at 2.3e-6 T. Ramping up HV.
Wednesday, December 06, 2023, 13:48 Both yesterday and today the TC wire was not close enough to spark even at 60kV. Venting the chamber one more time to bring the TC closer.
Thursday, December 07, 2023, 10:18 Vacuum at 5e-7T we see sparks at about 47kV. Lost control of epics during sparks, PS shut off manually. Everything recovered after.
Thursday, December 07, 2023, 13:32 After spark tests at ~55kV, Pi seems not to be affected by the sparks. Tests without the power surge components yielded similar results. We discovered that the sparks on the TC are partially diverted by spark gaps and probably other elements in the top HV cage.
Monday, December 11, 2023, 10:35 Turbopumps winding down. |
Tuesday, December 12, 2023, 12:41, Aaron Schmidt, , , , , , , Done, Source Tray / TS inspection
|
Tuesday, December 12, 2023, 12:39: Visual inspection.
Source tray: OK. Minor cracks on insulator near the coil conductor. Small chip in the upper TBHT insulator as well.
Water blocks: No leaks.
Pumping: TMS:RP2 recently purged. Otherwise all TP & RP OK.
Door seals: OK. |
Thursday, January 18, 2024, 10:44, Aaron Schmidt, , , , , , , Done, Thermal tests 2
|
December 18 - January 15. Were not logged. Placed holder. Aurelia's tests. Included thermocouples in the oven & ionizer. |
Thursday, January 18, 2024, 10:47, Aaron Schmidt, , , , , , , Problems/Solutions, FC0 Solenoid Replaced.
|
Issues with valve operations due to a leak in the solenoid valve above FC0. The HPA leak did not allow for sufficient pressure to remain in the lines to operate. The solenoid as changed this morning.
Thursday, January 18, 2024, 10:32: Roughing. Valves can be cycled. FC0 cycled. OK.
Thursday, January 18, 2024, 10:40: TMS TP6 & TMS:TP2 on.
Thursday, January 18, 2024, 10:45: IG6 on.
|
Thursday, January 18, 2024, 10:49, Aaron Schmidt, , LP-SIS, , , 44139-2, 45235-22, In progress, Conditioning UCx HS
|
Straight/closed TGHT tube oven installed. SIS Assembly.
Thursday, January 18, 2024, 10:32: Roughing.
Thursday, January 18, 2024, 10:57: TP1B on.
Thursday, January 18, 2024, 11:08: TP1A on.
Thursday, January 18, 2024, 11:17: IG1 on.
Thursday, January 18, 2024, 11:27: IV4 cycled ok.
Thursday, January 18, 2024, 12:07: IV4 open. PS / Sources on. Waterlines already open.
Thursday, January 18, 2024, 14:57: TPS:Q1 un-plugged, cycled, & reset. OK. Optics set to previous tune.
Friday, January 19, 2024, 06:45: TGHT on. Auto-ramping TGHT to 580 A @ 2 A per min.
Friday, January 19, 2024, 13:30: BIAS on at 30kV , preparing for mass scan - dn
Friday, January 19, 2024, 13:45: noting that mass scan 'field' parameter is not displayed in scanner. nor does the hall probe seem to be registering any changes on the magnet -dn
Friday, January 19, 2024, 15:00: after troubleshooting for quite a while, we fixed the problem by resetting/reconfiguring the canbus controllers. IOC reset did not help the problem and nor did power cycling the box 2A-5, which is believed to be routed to the hall probe.
noted that resetting the IOC did trip the BIAS and drop it to 0V.
Friday, January 19, 2024, 15:15: BIAS back to 30kV, resume mass scan.
Friday, January 19, 2024, 16:00, mass scan completed, data extracted.
Friday, January 19, 2024, 16:36: BIAS brought down to 0V over 15 min. auto cooling initiated at -1A / 30s
Monday, January 22, 2024, 10:36: EZL / EE to 0 V. Sources off.
Monday, January 22, 2024, 10:39: IV4 & FC0 closed.
Monday, January 22, 2024, 10:41: Power off. IV4 reset.
Monday, January 22, 2024, 10:42: IG1 off. Turbo pumps off.
Monday, January 22, 2024, 12:29: Venting via the turbo pumps. |
Monday, January 22, 2024, 13:55, Aaron Schmidt, , LP-SIS, , , 45447-19, 45235-22, In progress, Conditioning UCx HS - 2
|
Conditioning HS for UCx. LP-SIS oven / end caps installed
Monday, January 22, 2024, 13:53: Roughing.
Monday, January 22, 2024, 14:21: TP1B On.
Monday, January 22, 2024, 14:34: TP1A on.
Monday, January 22, 2024, 14:41: IG1 on. Vacuum @ 3.95e-05T & dropping.
Monday, January 22, 2024, 14:46: FS#5 open. Vacuum stable. 2.41e-05T & dropping. Power on.
Tuesday, January 23, 2024, 07:40: IV4 open.
Tuesday, January 23, 2024, 07:42: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per minute.
Tuesday, January 23, 2024, 13:43 increasing BIAS to 30kV - dn
Tuesday, January 23, 2024, 14:03 BIAS at 30kV
Tuesday, January 23, 2024, 14:06 beginning mass scan
Tuesday, January 23, 2024, 16:06: Data exported and saved
Tuesday, January 23, 2024, 16:15: Decreasing BIAS to 0V
Tuesday, January 23, 2024, 16:27: BIAS at 0V
Tuesday, January 23, 2024, 16:41: Vacuum in main chamber consistently at ~1.4e-6 T throughout.
Wednesday, January 24, 2024, 07:39: Auto-cooling @ 2 A per min.
Wednesday, January 24, 2024, 08:59: Auto-cooling Halted. Auto-ramp back up to 580 / 230 A @ 2 A per min.
Wednesday, January 24, 2024, 15:30: Target already hot - TBHT 230A, TGHT 580A
Wednesday, January 24, 2024, 15:31: increasing BIAS to 30kV
Wednesday, January 24, 2024, 15:41: beginning mass scan - Completed and repeated for confirmation
Wednesday, January 24, 2024, 16:55: decreasing BIAS to 0kV
Wednesday, January 24, 2024, 17:10: BIAS at 0kV
Thursday, January 25, 2024, 10:13: increasing bias to 30kV
Thursday, January 25, 2024, 10:30: BIAS at 30kV
Thursday, January 25, 2024, 10:40 : beginning mass scan
Thursday, January 25, 2024, 13:41 Tuned various parameters, multiple mass scans
Thursday, January 25, 2024, 16:19: decreasing BIAS to 0V
Thursday, January 25, 2024, 16:42 BIAS at 0V
Thursday, January 25, 2024, 16:42 Target cooling.
Monday, January 29, 2024, 08:55: Closed IV4, switched off turbo pumps, and opened VV1 to vent test stand and bring to atmospheric pressure. In preparation to remove target and add high mass salt.
Monday, January 29, 2024, 09:04: Does not appear to be venting. investigating. appears that the valve did not actuate on first instruction. Worked on repeated attempt.
Monday, January 29, 2024, 11:43 : at 700+ T, opening for target assembly removal.
Monday, January 29, 2024, 12:37 10µL Rb salt added to target. Assembly placed back into test stand. Pumping down.
Tuesday, January 30, 2024, 09:25: Vacuum stable. 8e-7 T. Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per minute.
Tuesday, January 30, 2024, 15:13: increasing BIAS to 30kV
Tuesday, January 30, 2024, 15:39 bias at 30kV, beginning mass scan
Tuesday, January 30, 2024, 16:48 Scans complete, lowering bias.
Wednesday, January 31, 2024, 16:02 increasing bias to 30kV
Wednesday, January 31, 2024, 16:40 scanned
Wednesday, January 31, 2024, 16:40 decreasing bias
Wednesday, January 31, 2024, 16:48 bias at 0V. cooling target
Thursday, February 01, 2024, 09:21: venting
Thursday, February 01, 2024, 11:14 : removed target assembly. added 5 salts: Na, Li,K,Rb,Cs. Placed target assembly back in test stand. pumping down.
Thursday, February 01, 2024, 16:51 Vacuum at 2e-6
Thursday, February 01, 2024, 16:52 heating target. TGHT and TBHT to 580 230 A overnight. .6A / min and .2A / min
Friday, February 02, 2024, 10:17 Target hot. Vacuum stable at 1e-6. increasing bias to 30kV
Friday, February 02, 2024, 10:42 scanning
Friday, February 02, 2024, 16:06 reducing bias
Friday, February 02, 2024, 16:18 bias at 0V. cooling target to 0 A at 2A per minute
PS & breaker off earlier via DN.
Monday, February 05, 2024, 13:58: TS was vented. HS removed - AS. |
Tuesday, February 06, 2024, 14:09, Aaron Schmidt, , , , , , , Problems/Solutions, FC0 Solenoid issue
|
Tuesday, February 06, 2024, 14:06: Attempted to 'Close' FC0. While it succeeded in moving into position, HPA rushed out of the exhaust. This solenoid was replaced recently on January 18th. Requires replacement. (ordered)
Reference: https://elog.triumf.ca/TIS/Test-Stand/990
Stores PN: 01-7/01026
Valve, Solenoid, 24 Volt 5 Port |
Friday, February 16, 2024, 05:03, Aaron Schmidt, , , , , , , Problems/Solutions, Coil PS issue
|
15-02-2024
The coil PS control card is fried. Roughly since the beginning of December. The PS was removed.
See attached image.
New PS was installed on Friday.
Tuesday, February 20, 2024, 08:01: Check Coil not responding.
Tuesday, February 20, 2024, 09:48: System check 2: TGHT / TBHT manually to 5 / 5 A. BIAS / EE / EZL to 1 / -0.5 / 1 kV. Anode to 50 V.
Coil set to 15 A, did not adjust.
Tuesday, February 20, 2024, 12:04: Coil PS SW1-7 switch in was in an "Off" position & wouldn't allow the voltage signal through to the PS. Switched to "on". Coil tapped to 7 A manually & back to 0 A ok.
Fixed*
|
Tuesday, February 20, 2024, 14:22, Aaron Schmidt, , , , , , , , Set to Cathode BIAS Mode
|
Tuesday, February 20, 2024, 14:20: TS to wired to Cathode BIAS mode as per ISK4563D.
Monday, March 11, 2024, 13:59: Power supply polarity switched to negative. |
Monday, February 26, 2024, 10:24, Aaron Schmidt, , , , , , , Problems/Solutions, TMS:RP2 purge. TS exhaust clearing. + TMS:TP6
|
Monday, February 26, 2024, 10:12:
While attempting to cycle FC0, noticed that the turbo pumps TMS:TP6 & TMS:TP2 were off, with TP2 being tripped off. The vacuum on TMS:CG2A sat around 0.825T although RP2 was running. The ballast plug has since been removed to allow for a 2 hour purge of the roughing pump.
Thursday, February 29, 2024, 13:10: Backing pressure still had not stabilized. RP2 removed & taken to Vacuum Group.
Wednesday, March 06, 2024, 10:28:
Tip seals were replaced by Vacuum Group. Roughing.
Wednesday, March 06, 2024, 10:31: TMS:TP6 & TMS:TP2 on.
Wednesday, March 06, 2024, 10:49: TP6 has tripped twice. TP2 ok.
Wednesday, March 06, 2024, 12:25: Venting. TP6 is not operating above 3 krpm.
Vacuum Group acquired TP6. It was nearly seized.
Wednesday, March 06, 2024, 14:57: Varian 551 pump installed from the furnace behind the TS. Roughing.
Friday, March 08, 2024, 06:58: Soft start initiated.
Friday, March 08, 2024, 08:47: TP6 at speed. |
Thursday, March 14, 2024, 17:43, Dave Neilson, , LP-FEBIAD, , , 44692-4 , 42972, , Calibrated Leak Development
|
Thursday, March 14, 2024, 15:39: Roughing
Thursday, March 14, 2024, 16:20:TP1B on
Thursday, March 14, 2024, 16:40: TP1A on
Thursday, March 14, 2024, 16:51: IG1 on
Thursday, March 14, 2024, 17:28: Waterline FS#5 open
Friday, March 15, 2024, 13:19: Gradually increased BIAS to 25kV, then up to 50kV more slowly. Accompanied by increase in EZL voltage.
Friday, March 15, 2024, 13:50: Periodically increased BIAS voltage in 100V increments watching for sparks. Decrease BIAS whenever sparks. settled at 51.5 kV (cannot increase further without sparking), left at high voltage.
Friday, March 15, 2024, 15:48: Decreasing BIAS to 10kV
Friday, March 15, 2024, 16:28: ran coil at 80A until vacuum recovered.
Friday, March 15, 2024, 19:29: decrease coil to 0A, decrease BIAS to 0V
Monday, March 18, 2024, 10:08 increasing TGHT/TBHT to 440A/290A at 1A/30s
Monday, March 18, 2024, 16:00 increasing COIL to 40A, waiting for vacuum to return to normal
Monday, March 18, 2024, 21:05: decreasing COIL to 0A
Tuesday, March 19, 2024, 09:35: increased COIL to 40A.
Tuesday, March 19, 2024, 10:17: increased TDH:ANODE (cathode mode) to (-)200V
Tuesday, March 19, 2024, 10:20: increasing BIAS to 30kV
Tuesday, March 19, 2024, 13:12: turned on gas. vacuum jumped up and tripped everything off. gas was immediately turned back off. TGHT and TBHT were off for approximately 1 minute before being turned back on.
Tuesday, March 19, 2024, 13:46: cooling. need to investigate possible leaks.
Tuesday, March 19, 2024, 15:58: TGHT and TBHT at 0A. Turbo pumps turned off. waiting to slow before venting.
Tuesday, March 19, 2024, 16:20 venting
Wednesday, March 20, 2024, 14:47: Target assembly was removed today and the tube from the inlet to the calibrated leak was replaced. Now reinstalled, roughing. Gas was turned on at ~0.2 bar during roughing. No effect on vacuum.
water cooling also turned on.
Wednesday, March 20, 2024, 14:53 Turbo pumps turned on.
Wednesday, March 20, 2024, 20:24: begin ramping TGHT TBHT to 440/290A at 1A/30s
Thursday, March 21, 2024, 09:54: Target heated, vacuum good. Tested gas to ensure there is no noticeable effect on vacuum. Lines subsequently vented through the line roughing pump.
Thursday, March 21, 2024, 09:55 Optics switched on. increasing cathode to 200V and coil to 40A. Watching vacuum, checking beam tune
Thursday, March 21, 2024, 10:20 ramping BIAS to 30kV
Thursday, March 21, 2024, 11:14 : scanned, data recorded
Thursday, March 21, 2024, 11:14 cathode reduced to 100V. scanned
Thursday, March 21, 2024, 11:32: coil reduced to 20A. scanned.
Thursday, March 21, 2024, 11:50 cathode increased to 200V. scanned
Thursday, March 21, 2024, 12:07 coil increased to 40A. Argon gas on (-0.8bar at regulator). scanned
Thursday, March 21, 2024, 12:31 reducing bias to 0kV
Thursday, March 21, 2024, 13:02 argon regulator pressure increased to -.64bar
Thursday, March 21, 2024, 13:05 increasing bias to 30kV
Thursday, March 21, 2024, 13:15: vented lines, scanning
Thursday, March 21, 2024, 13:35 gas on. scanning
Thursday, March 21, 2024, 15:05 cathode at 100V, scanning
Thursday, March 21, 2024, 15:20 coil at 20A, scanning
Thursday, March 21, 2024, 15:55 coil off. scanning
Thursday, March 21, 2024, 16:10 cathode off, scanning
Thursday, March 21, 2024, 17:23 - bias down. changing gas pressure
Friday, March 22, 2024, 09:08 increasing bias, checking tune, increasing cathode to 200V, coil to 40A, EZL to 13kV
Friday, March 22, 2024, 09:48 gas vented, scanned, gas on, scanned.
Friday, March 22, 2024, 09:48 decreasing bias to 0V, changing gas pressure.
Friday, March 22, 2024, 10:12 pressure at 1bar.abs. increased bias to 30kV, checked beam tune, cathode to 200V, coil to 40A, EZL to 13kV
Friday, March 22, 2024, 10:13 gas on. scanning
Friday, March 22, 2024, 10:33 decrease bias, changing pressure.
Friday, March 22, 2024, 10:57 gas line pressure at 1.5bar.a. increasing bias to 30kV, checking beam tune, cathode to 200V, coil to 40A, EZL to 13kV
Friday, March 22, 2024, 11:42 decreased bias, changing pressure.
Friday, March 22, 2024, 11:52 gas line pressure at ~2bar.a increasing bias to 30kV, checking beam tune, cathode to 200V, coil to 40A, EZL to 13kV
Friday, March 22, 2024, 15:40 bias down to 0V. reducing TGHT TBHT to 0/0
Monday, March 25, 2024, 09:30 Turbo pumps turned off
Monday, March 25, 2024, 10:00 venting chamber, purged water lines.
Monday, March 25, 2024,11:00 removed target assembly
Monday, March 25, 2024,13:00 replaced target assembly, began roughing
Monday, March 25, 2024,13:50: turned on water cooling. Vacuum stable. Turned on turbo pumps.
Monday, March 25, 2024, 15:16 turned on optics elements, cathode to 200V, coil to 80A, EZL to 13kV. monitoring vacuum. Gas leak test shows no effect on vacuum (5e-6T).
Monday, March 25, 2024, 15:22: Ramping TGHT TBHT to 440/290A at 1A/30s
Tuesday, March 26, 2024, 10:32 Ran mass scans with gas off and on.
Tuesday, March 26, 2024, 10:32 scanning parameter space for optimal beam output - cathode voltage and coil current.
Tuesday, March 26, 2024, 15:29 ramping TBHT to 300A, scanning
Tuesday, March 26, 2024, 16:10 ramping TBHT to 310A, scanning
Tuesday, March 26, 2024, 16:40 ramping TBHT to 320A, scanning
Wednesday, March 27, 2024, 09:25 - ramping bias to 30kV
Wednesday, March 27, 2024, 09:40 scanning cathode / coil parameter space to optimize output --- highest output at 200V 60A - 200V 62A - magnet drifted and is not right at Ar peak. corrected. scan repeated
Wednesday, March 27, 2024, 10:31 scanning cathode / coil parameter space to optimize output
Wednesday, March 27, 2024, 11:02 mass scan with 200V 62A cathode coil.
Wednesday, March 27, 2024, 11:17 - lines evacuated. mass scan.
Wednesday, March 27, 2024, 11:40 bias to 0V. change gas pressure
Wednesday, March 27, 2024, 11:50 bias to 30kV. mass scan
Wednesday, March 27, 2024, 12:10 bias to 0V. change gas pressure
Wednesday, March 27, 2024, 12:21 bias to 30kV. mass scan
Wednesday, March 27, 2024, 12:31 bias to 0V. change gas pressure
Wednesday, March 27, 2024, 12:43 Ramping bias to 30kV.
Wednesday, March 27, 2024, 15:00 bias to 0V. changing pressure to .5 bar.
Wednesday, March 27, 2024, 15:13 bias at 30kV.
Wednesday, March 27, 2024, 15:13 increasing TGHT to 468A (~2250W) - mass scan - monitoring vacuum. stable at 6e-7T
Wednesday, March 27, 2024, 15:39 increasing TGHT to 490A (~2500W) - mass scan - monitoring vacuum. stable at 6e-7T
Wednesday, March 27, 2024, 16:23 reduced cathode voltage to 50V to record the electron current (17.09mA). mass scan taken with coil at 35A
Wednesday, March 27, 2024, 16:35 ramping down BIAS to 0V.
Wednesday, March 27, 2024, 16:38 decreasing TGHT TBHT to 0A 0A at 1A/30s in preparation to switch to anode mode in the morning.
Thursday, March 28, 2024, 13:59 - Switched to anode mode
Thursday, March 28, 2024, 13:59 - ramping TGHT and TBHT to 100A at 1A/30s
Thursday, March 28, 2024, 14:37 increasing BIAS to 30kV
Thursday, March 28, 2024, 14:47 - ramping TGHT/TBHT to 440A/290A at 1A/7s
Thursday, March 28, 2024, 15:56 mass scan with 200V 62A cathode coil. gas on at 0.5 bar. (bias at 29.8kV)
Thursday, March 28, 2024, 15:56 mass scan with 200V 62A cathode coil. gas vented. (bias at 29.8kV)
Thursday, March 28, 2024, 16:29 ramping TGHT/TBHT to 490A/320A at 1.4A/10s
Thursday, March 28, 2024, 16:36 mass scan with 200V 62A cathode coil. gas on at 0.5 bar. (bias at 29.8kV)
Thursday, March 28, 2024, 16:56 mass scan with 200V 62A cathode coil. gas vented. (bias at 29.8kV)
Thursday, March 28, 2024, 17:13 dropping bias to 0
Thursday, March 28, 2024, 17:14 cooling tght and tbht at 1A/30s |
Thursday, April 04, 2024, 10:38, Dave Neilson, , LP-SIS, , , 44691-8, 45235-26, Done, Mass marker testing
|
Thursday, April 04, 2024, 09:49: Target inserted yesterday, April 3. mass marker tube connections carefully confirmed. Vacuum roughed, turbo pumps switched on at end of day. Water cooling turned on this morning.
Thursday, April 04, 2024, 09:52 : Vacuum at 6.4e-6. Not low enough to bypass lockout for TGHT TBHT ramp.
Thursday, April 04, 2024, 11:31 increasing the coil current to 30A, causing the vacuum to increase, waiting for vacuum to recover.
Thursday, April 04, 2024, 12:41 vacuum recovered but is at 6e-6 Torr. Changed Good Vacuum parameter in the target heater autoramp to 6.5e-6 and am increasing TGHT TBHT to 100A 100A at 1A/30s. Bad vacuum parameter left set at 7e-6 T
Thursday, April 04, 2024, 12:51 Vacuum continuing to drop. 5.7e-6T
Thursday, April 04, 2024, 14:26 ramping TGHT TBHT to 230A/230A at 1.4A/10s. vacuum stable at 5.6e-6T
Thursday, April 04, 2024, 14:48 increasing bias to 30kV
Thursday, April 04, 2024, 15:00 performing mass scan, range up to ~150. Coil at 0A. TGHT TBHT at 230/230 -- 2024-04-04-15-30 mm LPSIS 1.txt
Thursday, April 04, 2024, 15:31 increasing COIL current to 20A. repeating mass scan. 2024-04-04-15-56 mm LPSIS 2.txt
Thursday, April 04, 2024, 15:57 vacuum has increased over the course of the mass scan to 7e-6T. decreasing coil to 0A, and decreasing TGHT to 180A at 1.4A/10s
Thursday, April 04, 2024, 16:11 performing mass scan. coil at 0A, TGHT TBHT at 180/230 -- 2024-04-04-16-38 mm LPSIS 3.txt
Thursday, April 04, 2024, 16:39 increasing coil to 20A. repeating mass scan. -- 2024-04-04-17-05 mm LPSIS 4.txt
Thursday, April 04, 2024, 17:07 increasing TGHT to 230A at 1.4A/10s - - waiting for vacuum to settle and will compare results to salt output tomorrow
Thursday, April 04, 2024, 17:51 decreasing bias to 0
Friday, April 05, 2024, 09:27 increasing bias to 30kV -- epics crashed
Friday, April 05, 2024, 10:44 epics back, resuming bias increase to 30kV
Friday, April 05, 2024, 10:59 running mass scan for 'after overnight hot' data point ---2024-04-05-11-26 mm LPSIS 5.txt
Friday, April 05, 2024, 11:26 increased coil current to 20A, conducting mass scan. --- 2024-04-05-11-56 mm LPSIS 6.txt
Friday, April 05, 2024, 11:57 decreased coil current to 10A, conducting mass scan ---- 2024-04-05-12-25 mm LPSIS 7.txt
Friday, April 05, 2024, 12:26 increasing TGHT to 260A
Friday, April 05, 2024, 12:36 conducting mass scan with coil current at 0A ---- 2024-04-05-13-02 mm LPSIS 8.txt
Friday, April 05, 2024, 13:03 conducting mass scan with coil current at 20A ---- 2024-04-05-13-31 mm LPSIS 9.txt
Friday, April 05, 2024, 13:31 conducting mass scan with coil current at 10A ---- 2024-04-05-13-59 mm LPSIS 10.txt
Friday, April 05, 2024, 14:00 ramping TGHT to 290A
Friday, April 05, 2024, 14:06 conducting mass scan with coil current at 0A ---- 2024-04-05-14-32 mm LPSIS 11.txt
Friday, April 05, 2024, 14:33 conducting mass scan with coil current at 10A ---- 2024-04-05-15-00 mm LPSIS 12.txt
Friday, April 05, 2024, 15:01 conducting mass scan with coil current at 20A --- 2024-04-05-15-27 mm LPSIS 13.txt
Friday, April 05, 2024, 15:33 conducting mass scan with coil current at 30A --- 2024-04-05-16-01 mm LPSIS 14.txt
Friday, April 05, 2024, 16:02 conducting mass scan with coil current at 40A ---- 2024-04-05-16-31 mm LPSIS 15.txt
Friday, April 05, 2024, 16:32 conducting mass scan with coil current at 50A --- 2024-04-05-17-00 mm LPSIS 16.txt
Friday, April 05, 2024, 17:01 coil reduced to 0A. decreasing TGHT TBHT to 0 0 at 1A/30s, decreasing bias to 0
|
Tuesday, April 09, 2024, 15:28, Aaron Schmidt, , , , , , , , Set to Anode BIAS Mode & Old gas leak installed.
|
Switched to Anode mode on March 28 including polarity. The old calibrated leak was also re-installed. |
Monday, April 15, 2024, 14:35, Aaron Schmidt, , , , , , , Problems/Solutions, TSH:EE Issues
|
Monday, April 15, 2024, 14:33: On Friday it was noted that the EE was being troublesome. If we put -500 V on the EE the PS would deliver -1000 V. However it would slowly trickle downward. elog:1002.
Tom H. had a look at it this afternoon & determined the PS is operating, however the signal going to it is peculiar. Controls group as been notified as well. Awaiting further response.
Tuesday, April 16, 2024, 16:09: Full epics & PLC restart needed. All TP & RP shut down.
Tuesday, April 16, 2024, 17:45: Restart RP. TP1B on. TP6 & TP2 on.
Tuesday, April 16, 2024, 17:49: TP1A on.
Tuesday, April 16, 2024, 17:55: Restarted TP6.
Tuesday, April 16, 2024, 18:05: Long sigh* TP6 was in soft start mode. Controller put back to regular start. TP6 started.
Tuesday, April 16, 2024, 18:08: IG1 & IG6 on.
Wednesday, April 17, 2024, 10:25: IG, TP, & RP, off.
Wednesday, April 17, 2024, 13:03: RP on.
Wednesday, April 17, 2024, 13:14: TP1A on.
Wednesday, April 17, 2024, 13:07: TP6, TP2, & TP1B on.
Wednesday, April 17, 2024, 13:23: IG6 & IG1 on.
Wednesday, April 17, 2024, 13:25: EE to -500V. Read back on Epics -500V. PS direct @ -500V
Wednesday, April 17, 2024, 13:26: EE to -1500V. Read back on Epics -1500V. PS direct @ -1500V
Wednesday, April 17, 2024, 14:07: EE was brought back to 0V. ISAC TS closed up & ready for operation.
|
Wednesday, April 24, 2024, 16:21, Dave Neilson, , LP-SIS, , , 44691-8, 45235-26, ,
|
Wednesday, April 24, 2024, 16:20: Target assembly installed.
Wednesday, April 24, 2024, 16:20: VV1 closed. Pumping down to rough vacuum
Wednesday, April 24, 2024, 16:21: Water cooling on. Seal on lines confirmed.
Thursday, April 25, 2024, 09:14 TP1A and TP1B on
Thursday, April 25, 2024, 15:45: Vacuum seems to be stalled at 1e-5 T. Resetting turbo pumps has no noticeable effect. TP1B is emitting a soft high pitched tone / ringing. Now venting chamber to reset target assembly and water cooling seals.
|
Thursday, May 30, 2024, 16:00, Aaron Schmidt, , LP-FEBIAD, , , 44692-4, 45235-18, In progress, Conditioning spare FEBIAD
|
Anode short repaired (Should be :) )
Thursday, May 30, 2024, 15:56: Roughing.
Thursday, May 30, 2024, 16:10: Waterline FS#5 open. Vacuum ok & roughing down.
Bypassed IG1. TGHT / TBHT @ 5 A. Ok.
Anode to 100 V. Ok.
Thursday, May 30, 2024, 16:12: TGHT / TBHT / Anode to 0. Bypass removed.
Thursday, May 30, 2024, 16:26: TP1B on.
Thursday, May 30, 2024, 16:33: TP1A on.
Thursday, May 30, 2024, 16:41: IG1 on.
Friday, May 31, 2024, 08:50: Anode to 400 V. OK. Tapped back down. Vacuum @ 5.07e-07T
Friday, May 31, 2024, 09:12 increasing TGHT TBHT to 440 230A at 1A/30s- dn
Friday, May 31, 2024, 10:20 at ~130A, increased heating rate to 1.4A/10s - dn
Friday, May 31, 2024, 11:22 anode increased to 200V, TGHT TBHT at 440 230A. increasing TBHT to 290A
Friday, May 31, 2024, 11:38 ANODE shorted to hvc at TBHT=286A
Friday, May 31, 2024, 11:39 decreased TBHT to 285A. waiting to reestablish ANODE voltage.
Friday, May 31, 2024, 11:48 decreased TBHT to 280A, waiting to reestablish ANODE voltage.
Friday, May 31, 2024, 12:59 decreased TBHT to 275A, waiting to reestablish ANODE voltage.
Friday, May 31, 2024, 12:09 decreased TBHT to 270A, waiting to reestablish ANODE voltage. ---> recovered after 2 min at 270
Friday, May 31, 2024, 14:09 decreased TGHT TBHT to 0 for target removal monday.
Monday, June 03, 2024, 09:04 TP1A TP1B off. Waiting 30min for turbo pumps to slow, prior to venting to atmosphere.
Monday, June 03, 2024, 10:07 venting. VV1 open. - target subsequently removed for testing possible shorting fix
Friday, June 14, 2024, 16:37: Ceramic spacer placed between the anode and plasma electrode.
Target returned to test stand. Rough vacuum on.
Monday, June 17, 2024, 09:34: TP1A on, TP1B on.
Monday, June 17, 2024, 16:54 increasing tght tbht to 440 230 A at 1A/30s
Tuesday, June 18, 2024, 14:14 Increasing ANODE to 100V . Voltage holding. Increasing TBHT to 290A, watching anode voltage for possible temperature induced short.
Tuesday, June 18, 2024, 14:54 ANODE shorted at TBHT = 290A. cooling TBHT to reestablish ANODE OL.
Tuesday, June 18, 2024, 15:04 ANODE OL reestablished at TBHT = 283A
Tuesday, June 18, 2024, 15:05 Increasing TBHT again. 1A/2min
Tuesday, June 18, 2024, 15:32 ANODE shorted again when TBHT reached 290A
Tuesday, June 18, 2024, 15:32 cooling tght tbht. ANODE OL reestablished at TBHT 275A
Tuesday, June 18, 2024, 15:42 reheating to 440A 290A with ANODE at zero, to see if there is a difference compared to heating with ANODE ON/OFF
Tuesday, June 18, 2024, 15:55 confirmed shorted when hot. cooling to zero. 1A/30s
|
Tuesday, July 23, 2024, 09:43, Dave Neilson, , LP-SIS, , , 44691-8, 45235-26, Done, mass marker - reservoir testing
|
Wednesday, July 22, 2024, 11:41 - target installed
Wednesday, July 22, 2024, 13:31 - pumping down
Wednesday, July 22, 2024, 14:21 - turbo pumps on
Wednesday, July 22, 2024, 16:35 - water cooling on - no pressure increase
Tuesday, July 23, 2024, 09:42 - TGHT/TBHT ramping up to 580/230A at 1A/15s.
Tuesday, July 23, 2024, 09:55 increasing ramp rate to 1.4A/10s
Tuesday, July 23, 2024, 11:17 increasing BIAS / EE / EZL to 30 / -1.5 / 13 kV.
Tuesday, July 23, 2024, 11:44 sparks more frequent than expected. FC0 current at 1.17e-8A
Tuesday, July 23, 2024, 11:48 decreasing bias to 29.5k until spark frequency reduces
Tuesday, July 23, 2024, 13:23 once back up to 30kV, mass scan was run
Tuesday, July 23, 2024, 13:23 bias ee ezl were dropped to zero. reservoir heater was switched to 5A. the vacuum jumped up and shut down TGHT TBHT. heater turned off. TGHT TBHT restarted and reheated.
Tuesday, July 23, 2024, 13:24 reservoir heater turned to 2A while monitoring the vacuum. then to 3A as it appeared to be stable. at 4A the vacuum began slowly increasing.
Tuesday, July 23, 2024, 13:30 4A vacuum plateaus and recovering
Tuesday, July 23, 2024, 14:30 once reservoir heater is at 5A with a stable vacuum, increasing BIAS / EE / EZL to 30 / -1.5 / 13 kV
Tuesday, July 23, 2024, 14:50 running mass scan
Tuesday, July 23, 2024, 15:20 dropping BIAS / EE / EZL to zero
Tuesday, July 23, 2024, 15:40 turning off reservoir heater
Tuesday, July 23, 2024, 15:51 increasing BIAS EE EZL to 30 -1.5 13 kV.
Tuesday, July 23, 2024, 16:05 running mass scan
Tuesday, July 23, 2024, 17:00 cooling target. TGHT TBHT to 0 at -1A/30s
Wednesday, July 24, 2024, 09:24 purged water lines and turned off TP1A and TP1B, TP6 and TP2 --- waiting for TP to slow down. (will be venting beam line to change window)
|
|