Entry  Tuesday, March 30, 2021, 13:19, Carla Babcock, , , , , , , , Second emittance meter testing Carla_tune_tracking.docx
Emittance meter number 2 ready for beam shortly - installed and pumping down.
No beam found by Thursday evening, but beam seems to be coming out much differently than last time. Will check on emittance meter functionality
and try to re-tune later.
Entry  Sunday, April 04, 2021, 14:16, Carla Babcock, , , , , , , , Water leak problem persists 
IG1 has been spiking randomly, causing everything to turn off. Looks like the water leak is still there.
Entry  Tuesday, April 13, 2021, 13:27, Aaron Schmidt, , , , , , , , Indium gaskets installed FS#3 
Changed the gaskets from C-seals on FS#3 water blocks E, F,& H. G was already done.
Tuesday, April 13, 2021, 13:23: FS#3 Waterline opened.
Tuesday, April 13, 2021, 13:25: No immediate water noticed visually or on the gloves.
Entry  Wednesday, May 19, 2021, 16:02, Aaron Schmidt, , , , , , , , P2N HS conditioning  HV_test_-_Online_HS_&_parasitic_mods.docx
Parasitic assemblies on the lid & end plate included. Online HS.
Wednesday, May 19, 2021, 16:00: Roughing.

Thursday, May 20, 2021, 08:42: Turbo pumps were turned on last night. Vacuum @ 9.99e-07T.
Entry  Monday, June 28, 2021, 09:22, Aaron Schmidt, , , , , , , , Empty Chamber 
Monday, June 28, 2021, 09:22: Roughing.
Monday, June 28, 2021, 10:10: TP1B on.
Monday, June 28, 2021, 10:22: TP1A on (Tripped)
Entry  Wednesday, August 25, 2021, 15:30, Ferran Boix Pamies, , , , , , , , Thermocouple high voltage test 
Wednesday, August 25, 2021, 15:29: Roughing.

Thursday, August 26, 2021, 04:11: IG1 switched on. Vacuum @ 8.35e-06T - AS 
Thursday, August 26, 2021, 14:04 Water on, no spike in vacuum. IG1:2.6e-6T
Entry  Tuesday, August 31, 2021, 13:55, Aaron Schmidt, , , , , , , , Pump down chamber 
Pump down chamber w/ empty HS
Entry  Thursday, September 23, 2021, 07:16, Aaron Schmidt, , , , , , , , Pump down empty chamber & reboot 
Thursday, September 23, 2021, 07:15: Roughing. Waterline loop installed.

Monday, September 27, 2021, 10:35: MB1 off. Turbo pumps, IG, RP, all off/closed. DI water closed/purged.
TS shutdown for planned power outage.
Entry  Wednesday, October 06, 2021, 11:56, Aaron Schmidt, , , , , , , , Pump down empty chamber 
Wednesday, October 06, 2021, 11:56: Roughing.

Thursday, October 14, 2021, 09:07: Venting.
Entry  Wednesday, October 20, 2021, 15:01, Aaron Schmidt, , , , , , , , Pump down empty chamber 
Wednesday, October 20, 2021, 15:01: Roughing.
Entry  Tuesday, November 16, 2021, 13:45, Aaron Schmidt, , , , , , , , Pump down empty chamber 
Tuesday, November 16, 2021, 13:44: Roughing. Water loop installed. Lock out tag removed.
Entry  Tuesday, January 04, 2022, 13:00, Aaron Schmidt, , , , , , , , Post water leak 
 December 30th, 2021: Water poured down around Isac test stand and probes lab area in service
annex extension. problem was traced to a Cracked HVAC coil on SA roof
Fault: 14601 
Entry  Wednesday, January 05, 2022, 15:12, Carla Babcock, , , , , , , , Modifications to test stand for mass marker tests 
Connection of TBHT negative to HV common removed (R4 in circuit diagram). Labelled and put in MRO bucket.
Anode connection moved to feedthrough J.
Rewired multipin patch panel. Left some grounded (HVC) wires hanging, should probably make this nice later.
Entry  Wednesday, January 12, 2022, 16:12, Carla Babcock, , , , , , , , Ramp up of the mass marker target 133CssettingsJan132022.PNG23NasettingsJan132022.PNG23NasettingsJan172022-source.PNG23NasettingsJan172022-beamline.PNG
Wednesday, January 12, 2022, 16:08 : HV ramped to 30kV, EZL=15kV, EE=-1.5kV
Ramping up to 250A on TGHT, 200A on TBHT. See MassMarkerTest#1
for ramp up values of the thermocouples.
Entry  Monday, February 28, 2022, 08:08, Aaron Schmidt, , LP-SIS, , , , , , Mass marker / Coil-Tube target Test #2 
Installed & roughing Friday. 
Monday, February 28, 2022, 08:07: Turbopump TP1B on.
Monday, February 28, 2022, 09:21: TP1A on.
Entry  Monday, March 21, 2022, 13:59, Carla Babcock, , , , , , , , 3rd mass marker test 
3rd version of the mass marker target has been installed. This one is further back on the heat shield, and has a longer ceramic piece attached. There
are three thermocouples as follows:

    
        
            Thermocouple
       
Entry  Monday, April 04, 2022, 20:44, Carla Babcock, , , , , , , , Change from 9-pin connectors to 5-pin connectors 5pin_pinout_April42022.png
Swapped the old 9pin connectors out and replaced with 2 5-pin connectors, same as on the modules.
See attached for current pin out diagram. Many of the wires are too short to reach the bottom sockets, so wires 2, 8, 9 are not connected in the
connector. 4 spots are empty on connector 2 (right).  (6, 7) and (4, 5) are twisted pairs. Unused wires are tapped up out of the way, but we should
Entry  Monday, April 04, 2022, 20:56, Carla Babcock, , , , , , , , wiring reverted for cathode-bias FEBIAD 
Wiring which was changed to run the mass marker tests has been reverted:

    anode bias cable connected to "B"
    tube negative attached to HV common through "B" to "F"
connection 

Ready for cathode biased FEBIAD operation.
Entry  Tuesday, April 05, 2022, 14:01, Aaron Schmidt, Test FEBIAD TM2-2022, LP-FEBIAD, ITW, TM2, , 42752-5, , Test FEBIAD & TS operation Test_Target_LP-FEBIAD_TM2-2022.docx
Tuesday, April 05, 2022, 13:57: Roughing. BV1B.
Tuesday, April 05, 2022, 14:04: BV1A on.
Tuesday, April 05, 2022, 14:28: TP1B on.
Entry  Thursday, April 07, 2022, 11:19, Aaron Schmidt, Test FEBIAD TM2-2022, , ITW, TM2, , 42752-5, , Test FEBAID & TS operation 
 Gas system switched on manually to use Ar & calibrated leak.
Thursday, April 07, 2022, 10:25: Roughing. 
Thursday, April 07, 2022, 11:17: TP1B on.