  984   Monday, October 30, 2023, 16:01 Aaron Schmidt LP-SIS  45220-245235-13In progressHV power surge test plus mass scans Monday, October 30, 2023, 16:00 
Roughing

Tuesday, October 31, 2023,
  
  983   Wednesday, October 18, 2023, 15:43 Aaron Schmidt LP-SIS  45447-1245235-17In progressConditioning UC#43 (empty) w/ gas lineThermocouples attached on end plate
Indium salt @ 10 µl
3 wraps of Ta HS on oven. Gas line
 UC#43_Conditioning_empty_with_Gas_mod.docxUC#43_HS_with_gas_line_mod_-_Test_2.docxUC#43_HS_with_gas_line_mod_-_HV_Test.docx 
  982   Tuesday, October 10, 2023, 15:46 Aaron SchmidtTa#68 (Spare)LP-SIS  45220-345235-11In progressConditioning Ta#68 (Spare)Tuesday, October 10, 2023, 15:18: Roughing.
Tuesday, October 10, 2023, 15:46:
TP1B on.
 Ta#68-Spare_Conditioning.docx 
  981   Thursday, September 28, 2023, 13:42 Aaron Schmidt       Pump down empty chamberThursday, September 28, 2023, 13:40: Roughing
- BB.

Tuesday, October 10, 2023,
  
  980   Monday, September 25, 2023, 16:31 Aaron SchmidtTa#66LP-SISITWTM245220-545235-9DoneConditioning Ta#66 & HV Tests.Thermocouples installed on the left end
plate x 2.
Monday, September 25, 2023, 16:23:
 Ta#66_HV_Test_1.docxTa#66_HV_test_2.docxTa#66_Conditioning.docx 
  979   Tuesday, August 29, 2023, 12:14 Aaron Schmidt       Pump down empty chamberTuesday, August 29, 2023, 12:14: Roughing.
Tuesday, August 29, 2023, 13:17:
TP1B started. 
  
  978   Friday, August 25, 2023, 17:21 Aaron SchmidtNb#11LP-IG-LISITWTM245447-942132-4In progressConditioning Nb#11Replacement for Nb#10
Friday, August 25, 2023, 17:15: Roughing.
Friday, August 25, 2023, 17:57: Vacuum
 Nb#11_Conditioning.docx 
  977   Wednesday, August 16, 2023, 11:32 Aaron Schmidt       Pump down empty chamberWednesday, August 16, 2023, 11:32: Roughing.

Thursday, August 17, 2023,
11:01: Venting.
  
  976   Monday, August 14, 2023, 12:11 Aaron Schmidt LP-SIS  45220-1145235-3 Graphite target test 2 (C2023B)Graphite experiment insert 1: ID GR-230515,
WO#45220-11. https://elog.triumf.ca/TIS/Evaporator_2/622
New disc form. End caps expanded,
 Graphitetesting_Aug102023.xlsx 
  975   Wednesday, August 09, 2023, 14:29 Aaron Schmidt LP-SIS  45220-645235-3In progressGraphite target test 1 (C2023A)Graphite
experiment 2: ID Gr-230601, WO#45220-6 (
 Graphite_target_45220-6.docxGraphitetesting_Aug102023.xlsx 
  974   Thursday, July 13, 2023, 18:29 Aurelia Laxdal LP-SIS    In progressSpectrometer tests Pumping down: TS loaded with a LP-SIS
container for spectrometer test. 
Started heating up the target container:
  
  973   Thursday, July 13, 2023, 07:37 Aaron Schmidt       Tests - Aurelia LThursday, July 13, 2023, 07:37: Chamber
is vented. Beamline is vented. Interlock
bypassed on TPS:IV4 - AS
  
  972   Monday, July 10, 2023, 15:01 Aaron Schmidt       Pump down empty chamberMonday, July 10, 2023, 15:01: Roughing.

Wednesday, July 12, 2023,
09:38: Venting both chambers. 
  
  971   Thursday, July 06, 2023, 16:55 Aaron SchmidtNb#10LP-IG-LISITWTM245447-742132-2In progressConditioning Nb#10Thursday, July 06, 2023, 16:13: Roughing.
Thursday, July 06, 2023, 16:41: TP1B
on.
 Nb#10_Conditioning.docx 
  970   Thursday, June 08, 2023, 14:22 Aaron Schmidt       Rough down empty chamberThursday, June 08, 2023, 14:22: Roughing.   
  969   Wednesday, May 31, 2023, 15:19 Aaron SchmidtSiC#46HP-SIS  44692-245235-6In progressConditioning SiC#2023A (Spare, renamed SiC-23B) - No salts(Spare HP-SIS SiC SiC-23B)
Wednesday, May 31, 2023, 15:18: Roughing.

Thursday, June 01, 2023,
 SiC#2023A_-_No_Salts.docx 
  968   Thursday, May 25, 2023, 13:47 Aaron Schmidt       Rough down empty chamberThursday, May 25, 2023, 13:47: Roughing.   
  967   Tuesday, May 16, 2023, 14:00 Aaron SchmidtTa#65LP-SISITETM445220-745235-2In progressConditioning Ta#65Calibrated window installed on the beam
line.
Tuesday, May 16, 2023, 13:45: Roughing
 Ta#65_conditioning_-_Mass_&_wire_scans.docx 
  966   Tuesday, May 09, 2023, 10:40 Aaron SchmidtSiC#45HP-SISITETM444692-345235-8In progressConditioning SiC#45Tuesday, May 09, 2023, 10:28: Roughing.
Tuesday, May 09, 2023, 11:25: TP1B
on. 
 SiC#45_Conditioning..docx 
  965   Friday, May 05, 2023, 06:49 Aaron SchmidtTiC#6HP-FEBIADITWTM244692-1045235-12In progressConditioning TiC#6Ceramic elbow installed on the anode.
Friday, May 05, 2023, 06:47: Roughing.
Friday, May 05, 2023, 07:24: TP1B
 TiC#6_Anode_&_Coil_checks.docx 