  939   Tuesday, August 30, 2022, 13:58 Aaron Schmidt    44062-744378-25In progressConditioning UC#40 assemblyConditioning the UC#40 LP-SIS assembly
& ISAC TS main vacuum chamber. Straight
/ round oven in use (TGHT only).
  
  941   Thursday, September 29, 2022, 13:50 Aaron Schmidt      In progressPump down empty chamberWater loop installed.
Thursday, September 29, 2022, 13:50:
Roughing
  
  942   Tuesday, October 18, 2022, 13:25 Aaron SchmidtC#5LP-SIS  45235-544691-13In progressConditioning C#5Tuesday, October 18, 2022, 13:25: Roughing.
Tuesday, October 18, 2022, 13:28:
BV1A open
 C#5_-_Conditioning_start_-_HV.docx 
  943   Wednesday, October 19, 2022, 12:16 Aaron Schmidt       Test Stand controls changedgenepicsas.triumf.ca
x11 enabled.
Then use login credentials.
  
  945   Tuesday, November 15, 2022, 15:32 Sam Gupta       ATTS tantalum Bracket Heating testHeated up sample 01 for the second time
and measured the temperature with increasing
current. Used pyrometre to measure temperature
  
  946   Wednesday, November 16, 2022, 13:28 Aaron Schmidt      Problems/SolutionsTSG:TP1A Replaced See elog 944
Wednesday, November 16, 2022, 13:23:
TP1 A replaced
  
  947   Wednesday, November 23, 2022, 13:52 Aaron Schmidt     44378-14In progressFEBIAD Coil TestsSam G. & Navid N.
Work Permit# C2022-11-23--1
Wednesday, November 23, 2022, 13:51
  
  948   Monday, December 05, 2022, 15:41 Aaron Schmidt       Source tray insulator replacement Monday, December 05, 2022, 15:38:
Source Tray TGHT & TBHT insulators replaced. 
Torqued @ 75 in-lbs. (Reference image
 7x 
  949   Tuesday, December 06, 2022, 11:20 Aaron Schmidt HP-FEBIAD-CTL  43104-245235-12In progressNew anode routed FEBIAD TestsThermocouples installed:
O - O
O - Anode
 Re-routed_Anode_FEBIAD_12-2022_Test_1.docxITS_FEBIAD_measurements_12-2022_Test_1.xlsx 
  950   Tuesday, December 13, 2022, 16:12 Aaron Schmidt HP-FEBIAD-CTL  43104-245235-12In progressNew anode routed FEBIAD Test - 2Thermocouples installed (X):
O - O
O - Anode
 Re-routed_Anode_FEBIAD_12-2022_Test_2.docx 
  951   Friday, December 16, 2022, 10:32 Aaron Schmidt HP-FEBIAD-CTL  43104-245235-12In progressNew anode routed FEBIAD Test - 3Thermocouples installed (X):
O - O
O - Anode
  
  952   Monday, December 19, 2022, 12:49 Carla Babcock HP-FEBIAD     HP-FEBIAD testsMonday, December 19, 2022, 12:06 : Tomislav
changed the polarity of the anode power supply
last week and everything has been closed
  
  953   Wednesday, December 21, 2022, 17:06 Carla Babcock       Prep for power outageSource and beamline power supplies turned
off in EPICS
HV cage power off
  
  954   Tuesday, January 03, 2023, 10:03 Carla Babcock       Recovery from power outageEasy recovery after power outage, just
had to power cycle the ground PLC IOC and
the BiRa IOC.
  
  955   Thursday, January 12, 2023, 09:04 Aaron Schmidt LP-SIS  44691-1444378-20In progress Test for Aurelia L. Empty LP-SIS w/ end
caps in. Right side expanded.
Thermocouples installed (R - L):
  
  956   Monday, January 16, 2023, 16:02 Aaron Schmidt HP-FEBIAD-CTL    In progressHP-FEBIAD testsExtra wraps of foil around the center block
(6) + 3 full wraps around the shield.
Monday, January 16, 2023, 15:40:
  
  957   Tuesday, January 17, 2023, 09:48 Aaron Schmidt      Problems/SolutionsTMS:RP2 FailureTuesday, January 17, 2023, 09:48: TMS:RP2
off. Audible failure was in progress. Also
observable on the strip tool. Vacuum group
  
  958   Tuesday, January 31, 2023, 10:42 Aaron Schmidt LP-SIS  44062-1-SK45235-7In progressConditioning UC#x assemblySK Series of LP-SIS targets are for conditioning
only.
Tuesday, January 31, 2023, 10:39:
  
  959   Thursday, February 02, 2023, 12:44 Aaron Schmidt LP-SIS  44062-1-SK 45235-1In progressConditioning UC#x assemblySK Series of LP-SIS targets are for conditioning
only.
Thursday, February 02, 2023, 12:41:
  
  961   Thursday, April 13, 2023, 11:07 Aaron Schmidt      In progressInstallation of new IDP-15 TMS:TP2IDP15 Scroll Pump, Std w/ inlet.
TMS:RP2
PN: X3815-64010
  