331
|
Monday, September 09, 2013, 09:12 |
Anders Mjos | | | | | | | Problems/Solutions | Coil power supply back | Ray D. installed the "standard"
6V 200A FEBIAD COIL P/S on Friday morning.It
has not yet been tested as water supply was |
|
672
|
Monday, July 09, 2018, 10:44 |
Aaron Schmidt | | LP-FEBIAD | | | 41790-9 | 42752-5 | In progress | Coil Test July | Monday, July 09, 2018, 10:43: Rouging.
Monday, July 09, 2018, 13:14: Turbo
pumps on. |
|
674
|
Thursday, July 12, 2018, 10:11 |
Aaron Schmidt | | LP-FEBIAD | | | 41790-9 | 42752-5 | In progress | Coil Test #5 | *** REVIEW Elog entry #673 Power
outage & restart ***
Thursday, July 12, 2018, 10:10: Opened |
|
995
|
Friday, February 16, 2024, 05:03 |
Aaron Schmidt | | | | | | | Problems/Solutions | Coil PS issue | 15-02-2024
The coil PS control card is fried.
Roughly since the beginning of December. |
|
635
|
Friday, February 16, 2018, 15:21 |
Carla Babcock | | | | | | | | Cleaned HV cage - trying bias again | I vacuumed inside the HV cage, though it
has many small areas that are difficult to
access so I am not sure how great a job I |
|
644
|
Thursday, March 08, 2018, 17:47 |
Carla Babcock | | | | | | | | Change of electronics on target and tube power supplies | The resistor/varistor combinations across
the target + / -, tube + / - and target-
/ tube + have been remade and moved to the |
   |
914
|
Monday, April 04, 2022, 20:44 |
Carla Babcock | | | | | | | | Change from 9-pin connectors to 5-pin connectors | Swapped the old 9pin connectors out and
replaced with 2 5-pin connectors, same as
on the modules. |
|
1027
|
Thursday, October 31, 2024, 13:53 |
Aaron Schmidt | | | | | | | In progress | Chamber empty & Fix IG6 | Thursday, October 31, 2024, 13:53:
Roughing down empty chamber. U-Line installed.
Monday, November 04, 2024, |
|
704
|
Wednesday, January 09, 2019, 09:10 |
Aaron Schmidt | | | | | | | | Cathode to Anode. PS to Positive | Wednesday, January 09, 2019, 09:09: Upper
HV cage set to Anode / Positive as per dwg
ISK4523D Rev 6. |
|
110
|
Thursday, June 28, 2012, 11:19 |
Pierre Bricault | | LP-FEBIAD | | | | | In progress | Cathode ramping to 230 A in progress | |
|
111
|
Thursday, June 28, 2012, 11:27 |
Pierre Bricault | | LP-FEBIAD | | | | | In progress | Cathode heating in progress, pressure 8.3e-7 T | |
|
114
|
Thursday, June 28, 2012, 17:00 |
Pierre Bricault | | LP-FEBIAD | | | | | In progress | Cathode heater reached its value of 230 A and stoped. good test. | Now ramp cathode current up to 290 A. The
total current out is 1.e-7 A.
|
|
839
|
Wednesday, January 20, 2021, 11:30 |
Fernando Maldonado | | | | | | | Done | Cathode bias mode configuration confirmed |
|
|
766
|
Wednesday, October 30, 2019, 14:50 |
Fernando Maldonado | | | | | | | Problems/Solutions | Cathode bias mode configuration | Wednesday, October 30, 2019, 14:49: John
C. changed the polarity of the anode power
supply to negative, and Fernando M. rewired |
|
297
|
Friday, May 03, 2013, 14:32 |
Anders Mjos | | | | | | | Problems/Solutions | Cathode PS cable reconnected |
|
 |
556
|
Wednesday, November 30, 2016, 07:25 |
Aaron Schmidt | | | | | | | | Camera Container test 3. | Wednesday, November 30, 2016, 07:23: Venting
Wednesday, November 30, 2016, 08:35:
Roughing. |
 |
553
|
Friday, November 25, 2016, 14:28 |
Anders Mjos | | | | | | | | Camera Container test 2 | Friday, November 25, 2016, 14:28: Roughing
Friday, November 25, 2016, 14:47:
Turbos started |
  |
551
|
Thursday, November 24, 2016, 10:36 |
Aaron Schmidt | | | | | | | | Camera Container test 1. | Thursday, November 24, 2016, 10:15: Discuss
w/ Aurelia. Camera container filled with
Argon. Place under Vacuum, monitor w/ RGA. |
  |
563
|
Tuesday, January 24, 2017, 14:14 |
Aaron Schmidt | | | | | | | | Calibrated leak tanks removed | Tuesday, January 24, 2017, 13:30: Calibrated
leak tanks of Argon & Neon removed. Both
old Neon tanks were re-installed in their |
|
723
|
Wednesday, May 22, 2019, 13:47 |
Aaron Schmidt | | | | | | | | Calibrated Masscorr | Wednesday, May 22, 2019, 13:44: Calibration
Confirmed.
New Masscorr setup: |
|