  995   Friday, February 16, 2024, 05:03 Aaron Schmidt      Problems/SolutionsCoil PS issue15-02-2024
The coil PS control card is fried.
Roughly since the beginning of December.
 Coil_PS_Control_Card.png 
  635   Friday, February 16, 2018, 15:21 Carla Babcock       Cleaned HV cage - trying bias againI vacuumed inside the HV cage, though it
has many small areas that are difficult to
access so I am not sure how great a job I
  
  644   Thursday, March 08, 2018, 17:47 Carla Babcock       Change of electronics on target and tube power suppliesThe resistor/varistor combinations across
the target + / -, tube + / - and target-
/ tube + have been remade and moved to the
 IMG_20180308_152637.jpgIMG_20180308_152645.jpgTargetNeg.jpgTubeNegPos.jpg 
  914   Monday, April 04, 2022, 20:44 Carla Babcock       Change from 9-pin connectors to 5-pin connectorsSwapped the old 9pin connectors out and
replaced with 2 5-pin connectors, same as
on the modules.
 5pin_pinout_April42022.png 
  1027   Thursday, October 31, 2024, 13:53 Aaron Schmidt      In progressChamber empty & Fix IG6 Thursday, October 31, 2024, 13:53:
Roughing down empty chamber. U-Line installed.

Monday, November 04, 2024,
  
  704   Wednesday, January 09, 2019, 09:10 Aaron Schmidt       Cathode to Anode. PS to PositiveWednesday, January 09, 2019, 09:09: Upper
HV cage set to Anode / Positive as per dwg
ISK4523D Rev 6.
  
  110   Thursday, June 28, 2012, 11:19 Pierre Bricault LP-FEBIAD    In progressCathode ramping to 230 A in progress    
  111   Thursday, June 28, 2012, 11:27 Pierre Bricault LP-FEBIAD    In progressCathode heating in progress, pressure 8.3e-7 T    
  114   Thursday, June 28, 2012, 17:00 Pierre Bricault LP-FEBIAD    In progressCathode heater reached its value of 230 A and stoped. good test.Now ramp cathode current up to 290 A. The
total current out is 1.e-7 A.
 
  
  839   Wednesday, January 20, 2021, 11:30 Fernando Maldonado      DoneCathode bias mode configuration confirmed

    

       
            
  
  766   Wednesday, October 30, 2019, 14:50 Fernando Maldonado      Problems/SolutionsCathode bias mode configurationWednesday, October 30, 2019, 14:49: John
C. changed the polarity of the anode power
supply to negative, and Fernando M. rewired
  
  297   Friday, May 03, 2013, 14:32 Anders Mjos      Problems/SolutionsCathode PS cable reconnected 

 ISK4523D-rev4.pdfISK4563D-rev3.pdf 
  556   Wednesday, November 30, 2016, 07:25 Aaron Schmidt       Camera Container test 3.Wednesday, November 30, 2016, 07:23: Venting
Wednesday, November 30, 2016, 08:35:
Roughing.
 Camera_Case_Test_3.docxTS-2016-11-30-09-00_Test_3.rga 
  553   Friday, November 25, 2016, 14:28 Anders Mjos       Camera Container test 2Friday, November 25, 2016, 14:28: Roughing
Friday, November 25, 2016, 14:47:
Turbos started
 Camera_Case_Test_2.docxTS-2016-11-25-14-50_Test_2.rgaTS-2016-11-28-08-40_Test_2.rga 
  551   Thursday, November 24, 2016, 10:36 Aaron Schmidt       Camera Container test 1.Thursday, November 24, 2016, 10:15: Discuss
w/ Aurelia. Camera container filled with
Argon. Place under Vacuum, monitor w/ RGA.
 Camera_Case_Test_1.docxTS-2016-11-24-12-50.rgaTS-2016-11-25-10-10.rga 
  563   Tuesday, January 24, 2017, 14:14 Aaron Schmidt       Calibrated leak tanks removedTuesday, January 24, 2017, 13:30: Calibrated
leak tanks of Argon & Neon removed. Both
old Neon tanks were re-installed in their
  
  723   Wednesday, May 22, 2019, 13:47 Aaron Schmidt       Calibrated MasscorrWednesday, May 22, 2019, 13:44: Calibration
Confirmed.
New Masscorr setup:
  
  999   Thursday, March 14, 2024, 17:43 Dave Neilson LP-FEBIAD  44692-4 42972 Calibrated Leak Development Thursday, March 14, 2024, 15:39:
Roughing
Thursday, March 14, 2024, 16:20:TP1B
  
  308   Wednesday, May 29, 2013, 12:10 Anders MjosCTL FEBIADHP-FEBIAD  38481-5 DoneCTL TestWednesday, May 29, 2013, 12:09: Debiased
to insert temp logger
Wednesday, May 29, 2013, 14:40: Temp
 Photo_2013-06-13_10_33_42_AM.jpg 
  301   Tuesday, May 21, 2013, 14:58 Rick MaharajCTL Febiad      CTL Febiad InstalledCeramic coated coil development target
removed. CTL Febiad target installed.
Roughing chamber.
  