  854   Thursday, February 18, 2021, 15:15 Fernando Maldonado      DoneHLA testsThursday, February 18, 2021, 15:01: With
the help of Spencer Kiy, we tested the proper
communication from python to epics.
  
  855   Thursday, February 18, 2021, 16:48 Fernando Maldonado      FailedFEBIAD parameter scansThursday, February 18, 2021, 15:19: Gas
lines roughed and refilled. Gauge reads -50
kPa. Absolute pressure is 50 kPa.
  
  856   Friday, February 19, 2021, 13:44 Fernando Maldonado      FailedFEBIAD parameter scansFriday, February 19, 2021, 13:28: Roughing
Friday, February 19, 2021, 13:43:
Power on
 GND-COIL_spark.jpgGND-HS_spark.jpg 
  857   Monday, February 22, 2021, 18:25 Fernando Maldonado HP-FEBIAD    DoneFEBIAD parameter scansMonday, February 22, 2021, 17:48 Roughing
Monday, February 22, 2021, 18:17:
Turbos on.
 ESC_-_Feb_23_FEBAID_parameter_initial_checks.docxER-580-290-30kV-m28_2021-2-23.txt 
  858   Monday, March 01, 2021, 12:58 Fernando Maldonado LP-FEBIAD    DoneFEBIAD parameter scans v2 Monday, March 01, 2021, 12:57: Roughing
Monday, March 01, 2021, 13:30: Turbos
on. Started a bit late as I was distracted.
  
  859   Monday, March 01, 2021, 16:13 Fernando Maldonado      DoneTemporary RGA installation Monday, March 01, 2021, 16:03: An
ExTorr RGA has been installed in the ISAC
test stand.
 EXTorr.PNG 
  860   Tuesday, March 02, 2021, 11:42 Aaron Schmidt       TS Tripped.    
  861   Wednesday, March 10, 2021, 11:10 Carla Babcock       Venting for installation of emittance metersWednesday, March 10, 2021, 10:48 
: Venting beamline section only for installation
of emittance meters.
  
  862   Wednesday, March 10, 2021, 14:28 Aaron Schmidt      In progressRP2 swap.Swapped RP2 out from a Varian SH-110 to
a Varian PTS06001.
Wednesday, March 10, 2021, 14:20:
  
  864   Monday, March 15, 2021, 16:10 Carla Babcock       TISA emittance meter testing with new FEBIAD sourceMonday, March 15, 2021, 16:09 Target and
ion source ramped to 400A/330A this afternoon
Monday, March 15, 2021, 18:53 : Tune
 Carla_tune_tracking.docx 
  865   Thursday, March 25, 2021, 08:11 Aaron Schmidt       Test Stand Tripped. (Water leak)   Mar_2021_-_FS#3_leak..docx 
  866   Friday, March 26, 2021, 17:04 Carla Babcock       Beam line vented for emittance meter exchangeVented beamline and removed ARIEL emittance
meter. In the process of swapping components,
beamline left vented until Monday when we
  
  867   Tuesday, March 30, 2021, 13:19 Carla Babcock       Second emittance meter testingEmittance meter number 2 ready for beam
shortly - installed and pumping down.
No beam found by Thursday evening,
 Carla_tune_tracking.docx 
  868   Sunday, April 04, 2021, 14:16 Carla Babcock       Water leak problem persistsIG1 has been spiking randomly, causing
everything to turn off. Looks like the water
leak is still there.
  
  869   Tuesday, April 13, 2021, 13:27 Aaron Schmidt       Indium gaskets installed FS#3Changed the gaskets from C-seals on FS#3
water blocks E, F,& H. G was already
done.
  
  870   Wednesday, April 14, 2021, 10:21 Luca Egoriti P2N test - Apr 2021HP-SIS    In progress P2N test - Electrical reconfiguration Wednesday, April 14, 2021, 10:18
Work started to bring the ATTS PS
inside the ITS HV cage. HV grounding rod
 ITS_electrical_panel_-_removed.jpgResistance_matrix_2021-04-28.png 
  871   Monday, April 19, 2021, 14:58 Anders Mjos P2N-SIS    Problems/SolutionsWater leak on coil neg (H and F)Determined on Friday April 16th that the
water leak was on the coil negative circuit.
This was determined by circulating water
  
  872   Wednesday, April 28, 2021, 22:34 Luca EgoritiP2N test - Apr 2021P2N-SISITETM4  In progressP2N heating test Wednesday, April 28, 2021, 22:30
First P2N heating test ongoing.
At P2NHT ~ 570 A and TBHT ~ 100 A
 Target_580A_100A_glowing.jpgInitial_rampup.PNG 
  873   Wednesday, May 19, 2021, 16:02 Aaron Schmidt       P2N HS conditioning Parasitic assemblies on the lid & end
plate included. Online HS.
Wednesday, May 19, 2021, 16:00: Roughing.
 HV_test_-_Online_HS_&_parasitic_mods.docx 
  877   Monday, June 07, 2021, 14:40 Aaron Schmidt      DoneFC6 re-installedMonday, June 07, 2021, 14:39: Roughing
beam line section.
Monday, June 07, 2021, 14:46: TMS:TP6
  