Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 43 of 53  Not logged in ELOG logo
ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subjectdown Text Attachments
  1015   Monday, July 29, 2024, 23:02 Aurelia LaxdalTa#67 Thin foilsLP-SISITETM345447-1445235-10 Cooldown for removing the V wires  22:55 Cooldown completed to remove
the voltage wires from inside the vacuum
box. 
  
  322   Wednesday, July 17, 2013, 12:55 Anders Mjos      Problems/SolutionsControls are removing dust/cleaning their devicesThursday, July 18, 2013, 08:41: Restarting
archivers
  
  116   Friday, June 29, 2012, 08:57 Pierre Bricault LP-FEBIAD    In progressContinue cathode heating This morning the pressure was 3.5E-7
T. Current at 275 A is 30nA.
Continue cathode heating to 290 A
  
  275   Friday, January 18, 2013, 15:57 Anders Mjos      Problems/SolutionsConductor bolts to be replacedAfter the last test at the test stand,
one of the conductor bolts (ITD0058) is damaged.
To prevent damage to the thread inserts,
 Model.jpgdamaged_bolt.JPG 
  996   Friday, February 16, 2024, 10:30 Aaron SchmidtSiC# (Stock)HP-FEBIAD  45447-445235-21In progressConditioning stock SiC HP FEBIADFriday, February 16, 2024, 10:30: Roughing
Friday, February 16, 2024, 17:38:
TP1B on. 
 Stock_SiC_Elog_996_HP-FEBIAD_Cathode_BM_-_HV_&_Coil.docxHP-FEBIAD_Elog_996_-_Ramp_up_&_mass_scans.docxStock_SiC_Elog_996_HP-FEBIAD_Cathode_BIAS_mode_-_2.docx 
  630   Thursday, February 08, 2018, 14:44 Carla Babcock      DoneConditioning station power supply integrated into EPICSThe 75kV power supply is now in EPICS under
the usual TSG:BIAS controls. The upper limit
has been set to 70kV to protect the transformer.
  
  1010   Thursday, May 30, 2024, 16:00 Aaron Schmidt LP-FEBIAD  44692-445235-18In progressConditioning spare FEBIADAnode short repaired (Should be :) )
Thursday, May 30, 2024, 15:56: Roughing.
Thursday, May 30, 2024, 16:10: Waterline
  
  330   Friday, August 30, 2013, 15:09 Anders MjosNiO#2HP-FEBIADITETM339530-639069-4DoneConditioning of NiO#2Friday, August 30, 2013, 15:09 : Turbos
stopped in preparation for installation. 
Friday, August 30, 2013, 16:22: Venting
 2013-09-12_NiO#2_TBHT_jump.PNG 
  683   Friday, August 31, 2018, 12:27 Aaron SchmidtnSiC#1LP-SISITWTM243044-142752-4In progressConditioning nSiC#1Friday, August 31, 2018, 12:27: Roughing.
Friday, August 31, 2018, 13:19: Turbo
pumps started.
 15x 
  1004   Wednesday, April 17, 2024, 14:16 Aaron SchmidtEmpty (Online)LP-FEBIADITWTM445447-2442972-8In progressConditioning empty FEBIAD for online use - Run 2https://elog.triumf.ca/TIS/Test-Stand/1003
EE Issue resolved. TS closed up.
Wednesday, April 17, 2024, 14:08:
 2024_-_ITW-_TM4_LP_FEBIAD_-_2.docx 
  1002   Tuesday, April 09, 2024, 16:01 Aaron SchmidtEmpty (Online)LP-FEBIADITWTM445447-2442972-8In progressConditioning empty FEBIAD for online useTuesday, April 09, 2024, 15:25: Roughing.

Wednesday, April 10, 2024,
05:41: TP1B on. 
 EE_issue_-_Conditioning_LP-FEBIAD_ITW-TM4.docx2024_-_ITW-_TM4_LP_FEBIAD.docx 
  722   Tuesday, May 14, 2019, 10:22 Aaron SchmidtZrC#8LP-SISITETM243044-542972-3In progressConditioning ZrC#8 HSTuesday, May 14, 2019, 10:21: Roughing
Tuesday, May 14, 2019, 10:51: Turbo
pumps on.
 ZrC#8.docxTS-2019-05-14-11-05.rgaTS-2019-05-16-07-30.rgaTS-2019-05-21-07-10.rgaITE-TM2-ZrC#8-LP-SIS_Test_Stand.docx 
  992   Monday, January 22, 2024, 13:55 Aaron Schmidt LP-SIS  45447-1945235-22In progressConditioning UCx HS - 2Conditioning HS for UCx. LP-SIS oven /
end caps installed
Monday, January 22, 2024, 13:53:
  
  991   Thursday, January 18, 2024, 10:49 Aaron Schmidt LP-SIS  44139-245235-22In progressConditioning UCx HS Straight/closed TGHT tube oven installed.
SIS Assembly.
Thursday, January 18, 2024, 10:32:
  
  958   Tuesday, January 31, 2023, 10:42 Aaron Schmidt LP-SIS  44062-1-SK45235-7In progressConditioning UC#x assemblySK Series of LP-SIS targets are for conditioning
only.
Tuesday, January 31, 2023, 10:39:
  
  959   Thursday, February 02, 2023, 12:44 Aaron Schmidt LP-SIS  44062-1-SK 45235-1In progressConditioning UC#x assemblySK Series of LP-SIS targets are for conditioning
only.
Thursday, February 02, 2023, 12:41:
  
  1029   Wednesday, November 13, 2024, 14:36 Aaron SchmidtUC#(47) - Not includedLP-SISITETM344691-845235-24In progressConditioning UC#47 (Assembly only)Gas line is attached. 
Wednesday, November 13, 2024, 14:18:
Roughing.
 UC#47_empty_conditioning_test_1_-_Failed.docxUC#47_empty_conditioning_test_2.docx 
  1026   Tuesday, October 29, 2024, 18:25 Aaron SchmidtUC#46 (assembly only)LP-IG-LISITWTM4 42972-6 / 39956-1In progressConditioning UC#46 Assembly 42972-6 Base / 39956-1 Lid
Tuesday, October 29, 2024, 18:20:
Roughing. 
  
  983   Wednesday, October 18, 2023, 15:43 Aaron Schmidt LP-SIS  45447-1245235-17In progressConditioning UC#43 (empty) w/ gas lineThermocouples attached on end plate
Indium salt @ 10 µl
3 wraps of Ta HS on oven. Gas line
 UC#43_Conditioning_empty_with_Gas_mod.docxUC#43_HS_with_gas_line_mod_-_Test_2.docxUC#43_HS_with_gas_line_mod_-_HV_Test.docx 
  944   Tuesday, November 15, 2022, 11:24 Aaron SchmidtUC#41 assemblyLP-SISITETM445220-845235-4In progressConditioning UC#41 assembly LP-SIS 45220-8 is empty & for
testing only.
Tuesday, November 15, 2022, 11:00:
 UC#41_assembly_conditioning.docx 
ELOG V2.9.2-2455