ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
|
1015
|
Monday, July 29, 2024, 23:02 |
Aurelia Laxdal | Ta#67 Thin foils | LP-SIS | ITE | TM3 | 45447-14 | 45235-10 | | Cooldown for removing the V wires | 22:55 Cooldown completed to remove
the voltage wires from inside the vacuum
box. |
|
322
|
Wednesday, July 17, 2013, 12:55 |
Anders Mjos | | | | | | | Problems/Solutions | Controls are removing dust/cleaning their devices | Thursday, July 18, 2013, 08:41: Restarting
archivers |
|
116
|
Friday, June 29, 2012, 08:57 |
Pierre Bricault | | LP-FEBIAD | | | | | In progress | Continue cathode heating | This morning the pressure was 3.5E-7
T. Current at 275 A is 30nA.
Continue cathode heating to 290 A |
|
275
|
Friday, January 18, 2013, 15:57 |
Anders Mjos | | | | | | | Problems/Solutions | Conductor bolts to be replaced | After the last test at the test stand,
one of the conductor bolts (ITD0058) is damaged.
To prevent damage to the thread inserts, |
|
996
|
Friday, February 16, 2024, 10:30 |
Aaron Schmidt | SiC# (Stock) | HP-FEBIAD | | | 45447-4 | 45235-21 | In progress | Conditioning stock SiC HP FEBIAD | Friday, February 16, 2024, 10:30: Roughing
Friday, February 16, 2024, 17:38:
TP1B on. |
|
630
|
Thursday, February 08, 2018, 14:44 |
Carla Babcock | | | | | | | Done | Conditioning station power supply integrated into EPICS | The 75kV power supply is now in EPICS under
the usual TSG:BIAS controls. The upper limit
has been set to 70kV to protect the transformer. |
|
1010
|
Thursday, May 30, 2024, 16:00 |
Aaron Schmidt | | LP-FEBIAD | | | 44692-4 | 45235-18 | In progress | Conditioning spare FEBIAD | Anode short repaired (Should be :) )
Thursday, May 30, 2024, 15:56: Roughing.
Thursday, May 30, 2024, 16:10: Waterline |
|
330
|
Friday, August 30, 2013, 15:09 |
Anders Mjos | NiO#2 | HP-FEBIAD | ITE | TM3 | 39530-6 | 39069-4 | Done | Conditioning of NiO#2 | Friday, August 30, 2013, 15:09 : Turbos
stopped in preparation for installation.
Friday, August 30, 2013, 16:22: Venting |
|
683
|
Friday, August 31, 2018, 12:27 |
Aaron Schmidt | nSiC#1 | LP-SIS | ITW | TM2 | 43044-1 | 42752-4 | In progress | Conditioning nSiC#1 | Friday, August 31, 2018, 12:27: Roughing.
Friday, August 31, 2018, 13:19: Turbo
pumps started. |
15x |
1004
|
Wednesday, April 17, 2024, 14:16 |
Aaron Schmidt | Empty (Online) | LP-FEBIAD | ITW | TM4 | 45447-24 | 42972-8 | In progress | Conditioning empty FEBIAD for online use - Run 2 | https://elog.triumf.ca/TIS/Test-Stand/1003
EE Issue resolved. TS closed up.
Wednesday, April 17, 2024, 14:08: |
|
1002
|
Tuesday, April 09, 2024, 16:01 |
Aaron Schmidt | Empty (Online) | LP-FEBIAD | ITW | TM4 | 45447-24 | 42972-8 | In progress | Conditioning empty FEBIAD for online use | Tuesday, April 09, 2024, 15:25: Roughing.
Wednesday, April 10, 2024,
05:41: TP1B on. |
|
722
|
Tuesday, May 14, 2019, 10:22 |
Aaron Schmidt | ZrC#8 | LP-SIS | ITE | TM2 | 43044-5 | 42972-3 | In progress | Conditioning ZrC#8 HS | Tuesday, May 14, 2019, 10:21: Roughing
Tuesday, May 14, 2019, 10:51: Turbo
pumps on. |
|
992
|
Monday, January 22, 2024, 13:55 |
Aaron Schmidt | | LP-SIS | | | 45447-19 | 45235-22 | In progress | Conditioning UCx HS - 2 | Conditioning HS for UCx. LP-SIS oven /
end caps installed
Monday, January 22, 2024, 13:53: |
|
991
|
Thursday, January 18, 2024, 10:49 |
Aaron Schmidt | | LP-SIS | | | 44139-2 | 45235-22 | In progress | Conditioning UCx HS | Straight/closed TGHT tube oven installed.
SIS Assembly.
Thursday, January 18, 2024, 10:32: |
|
958
|
Tuesday, January 31, 2023, 10:42 |
Aaron Schmidt | | LP-SIS | | | 44062-1-SK | 45235-7 | In progress | Conditioning UC#x assembly | SK Series of LP-SIS targets are for conditioning
only.
Tuesday, January 31, 2023, 10:39: |
|
959
|
Thursday, February 02, 2023, 12:44 |
Aaron Schmidt | | LP-SIS | | | 44062-1-SK | 45235-1 | In progress | Conditioning UC#x assembly | SK Series of LP-SIS targets are for conditioning
only.
Thursday, February 02, 2023, 12:41: |
|
1029
|
Wednesday, November 13, 2024, 14:36 |
Aaron Schmidt | UC#(47) - Not included | LP-SIS | ITE | TM3 | 44691-8 | 45235-24 | In progress | Conditioning UC#47 (Assembly only) | Gas line is attached.
Wednesday, November 13, 2024, 14:18:
Roughing. |
|
1026
|
Tuesday, October 29, 2024, 18:25 |
Aaron Schmidt | UC#46 (assembly only) | LP-IG-LIS | ITW | TM4 | | 42972-6 / 39956-1 | In progress | Conditioning UC#46 Assembly | 42972-6 Base / 39956-1 Lid
Tuesday, October 29, 2024, 18:20:
Roughing. |
|
983
|
Wednesday, October 18, 2023, 15:43 |
Aaron Schmidt | | LP-SIS | | | 45447-12 | 45235-17 | In progress | Conditioning UC#43 (empty) w/ gas line | Thermocouples attached on end plate
Indium salt @ 10 µl
3 wraps of Ta HS on oven. Gas line |
|
944
|
Tuesday, November 15, 2022, 11:24 |
Aaron Schmidt | UC#41 assembly | LP-SIS | ITE | TM4 | 45220-8 | 45235-4 | In progress | Conditioning UC#41 assembly | LP-SIS 45220-8 is empty & for
testing only.
Tuesday, November 15, 2022, 11:00: |
|