  144   Thursday, July 12, 2012, 13:41 Anders Mjos      Donepurging gas lines with air
    gas lines purged with air for
60 min (through TSHUHV1 and TSHSV4).

   gas line allowed to fill with nitrogen
  
  250   Friday, December 14, 2012, 20:34 Sebastian RaederRFQ empty     Donepumping downFriday, December 14, 2012, ~ 17:00: start
roughing pumps
Friday, December 14, 2012, 20:33:
  
  750   Friday, August 02, 2019, 13:16 Aaron SchmidtP2N - 1     In progressp2n heating test 4Friday, August 02, 2019: p2n target installed
in the test stand, the ion source was fully
removed to avoid any risk of shorting. The
  
  751   Wednesday, August 07, 2019, 08:18 Luca EgoritiP2N - 1 ITETM2  Problems/Solutionsp2n heating test 4Tuesday, August 06, 2019, 16:00
Start ramp up to 300+300 = 600 A
 
 IMG_20190806_182939.jpgIMG_20190806_182953.jpg 
  748   Sunday, July 28, 2019, 14:22 Luca EgoritiP2N - 1HP-FEBIADITETM2p2n - test1p2n - test1Problems/Solutionsp2n heating test 3Friday. July 26th 2019 
A new electrical configuration of
the test stand was decided and installed.
 20190728_-_p2n_heating_3.PNG 
  749   Tuesday, July 30, 2019, 12:19 Luca EgoritiP2N - 1HP-FEBIADITETM2  Problems/Solutionsp2n heating test - target inspectionThe p2n target was taken out of the test
stand for inspection. Comments and measurements
on the container below:
 IMG_20190730_110927.jpgIMG_20190730_113437.jpgIMG_20190730_105629.jpg 
  802   Wednesday, July 22, 2020, 08:56 Luca Egoriti P2N testHP-SISITETM4  In progressp2n heating test - electrical feedthrough configuration The electrical feedthroughs at the
top of the test stand module were reconfigured
to deliver up to 1200A to the p2n target.
 ISACteststand_TMwiring.pptxP2N-TestStand_20200722.pngP2N-TestStand_1200A.png 
  744   Monday, July 08, 2019, 09:20 Luca Egoritip2n1 ITE   In progressp2n heating test(see entry 742)
 
p2n target heated over the weekend
 Capture.PNGCapture1.PNG 
  284   Tuesday, March 19, 2013, 17:25 Sebastian Raeder      Problems/Solutionsnew turbo installedEdi replaced the faulty turbo pump in the
mass separator section.
Roughing and turbo started
  
  45   Thursday, March 01, 2012, 17:04 Friedhelm Ames       new mass scanbigger mass scan after separator optimization
and with finer step size
 
 grab.S19441.png 
  47   Thursday, March 01, 2012, 17:09 Friedhelm Ames       new mass scan


   
        
            
  
  63   Thursday, March 08, 2012, 17:16 Friedhelm AmesNb#6      mass scan started    
  66   Friday, March 09, 2012, 08:53 Friedhelm AmesNb#6     In progressmass scan startedmass scan started again. Total current
3.2e-8 A
  
  195   Friday, September 07, 2012, 12:11 Friedhelm AmesNB#7LP-SIS    In progressmass scan startedmass scan has been started after optimization
on 23Na
  
  118   Friday, June 29, 2012, 15:02 Friedhelm Ames       mass scan finishedmass spectrum saved as
plotdump-local-clean.txt_Jun29_12_14-55-43.txt


 mass_spectrum_2012_06_29.PNG 
  120   Friday, June 29, 2012, 16:39 Friedhelm Ames       mass scan finished

    

       
            
  
  196   Friday, September 07, 2012, 13:10 Friedhelm AmesNb#7     Donemass scan finishedmass scan is finished saved as 
 
  Normal

 0
  
  
  65   Thursday, March 08, 2012, 18:32 Friedhelm Ames       mass scan crashed due to a network errormass scan crashed due to a network error
will be restarted tomorrow
  
  43   Wednesday, February 29, 2012, 17:22 Friedhelm Ames       mass scan mass scan with valve at 7.2 to let in Al(CH3)3
saved as
plotdump-local-clean.txt_Feb29_12_17-19-20.txt


 grab.BI5978.png 
  1012   Tuesday, July 23, 2024, 09:43 Dave Neilson LP-SIS  44691-845235-26Donemass marker - reservoir testingWednesday, July 22, 2024, 11:41  -
target installed