  Test-Stand, Page 31 of 53  Not logged in ELOG logo
  ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subjectdown Text Attachments
  950   Tuesday, December 13, 2022, 16:12 Aaron Schmidt HP-FEBIAD-CTL  43104-245235-12In progressNew anode routed FEBIAD Test - 2Thermocouples installed (X):
O - O
O - Anode
 Re-routed_Anode_FEBIAD_12-2022_Test_2.docx 
  664   Monday, May 28, 2018, 08:46 Aaron Schmidt LP-FEBIAD TM241790-942752-5In progressNew TM source tray swap out. Monday, May 28, 2018, 08:45: Venting. Prep
For removal.
Close FS#8. Clean up water
 New_TM_Source_Tray_2018.docxTS-2018-05-30-06-30.rgaER-580-310-30kV-m28.txtER-580-320-30kV-M39.txt2018_TM2_Source_Tray_in_Test_Stand_-_Test_Results.docx 
  677   Friday, August 10, 2018, 10:56 Aaron Schmidt      Problems/SolutionsNew PS installation and Cathode BIAS setFriday, August 10, 2018, 10:25: Remove
TBHT 500 PS and replace with TBHT 600 PS.
Friday, August 10, 2018, 10:50: Switch
  
  773   Wednesday, November 27, 2019, 16:01 Fernando Maldonado      Problems/SolutionsNew Controller for TP6Wednesday, November 27, 2019, 15:31: During
HV tests, bias was around 55kV when a spark
occur and almost immediately the controller
  
  639   Friday, February 23, 2018, 08:50 Aaron Schmidt       New Al Corona Friday, February 23, 2018, 08:50    
  421   Tuesday, January 20, 2015, 14:31 Anders Mjos      Problems/SolutionsNe leak disconnected for recallibrationSN 11-231 from VIC   
  817   Tuesday, October 27, 2020, 08:54 Aaron SchmidtNb#9 LP-SISITWTM244508-243515-4In progressNb#9 ConditioningTuesday, October 27, 2020, 08:40: Roughing.
Tuesday, October 27, 2020, 09:13:
TP1B on.
 Nb#9_Conditioning.docxER-580-230-30kV-M133.txtER-580-230-30kV-M23.txt 
  192   Friday, August 31, 2012, 13:59 Anders MjosNb#7LP-SISITWTM1  In progressNb#7 installedFriday, August 31, 2012, 15:19: roughing
Friday, August 31, 2012, 15:39 :
starting turbos
  
  193   Tuesday, September 04, 2012, 08:11 Anders MjosNb#7LP-SISITWTM1  DoneNb#7 installed

    

       
            
  
  910   Wednesday, January 05, 2022, 15:12 Carla Babcock       Modifications to test stand for mass marker testsConnection of TBHT negative to HV common
removed (R4 in circuit diagram). Labelled
and put in MRO bucket.
  
  822   Tuesday, December 01, 2020, 11:56 Carla Babcock      In progressModifications to test stand for TM3 testsTuesday, December 01, 2020, 11:56 :
TSG:BIAS unplugged and controls pigtail
(made by Ray) added in order to connect controls
  
  824   Wednesday, December 02, 2020, 08:32 Carla Babcock       Modifications to test stand for TM3 testsWednesday, December 02, 2020, 08:31 :
Added copper wire connection to multipin
screw terminals in HV cage to make sure they
  
  827   Friday, December 04, 2020, 08:53 Carla Babcock       Modifications to test stand for TM3 testsFriday, December 04, 2020, 08:52 :
Test stand roughed down to 29mT overnight.
Started turbos for testing later.
  
  829   Tuesday, December 08, 2020, 11:54 Carla Babcock       Modifications to test stand for TM3 testsThe copper tubes to be used in the TM3
test piece may have flux inside them from
soldering the end caps on. There are holes
 20201207_135011.jpg20201207_134951.jpgScreenshot_from_2020-12-09_19-41-36.png 
  830   Friday, December 11, 2020, 15:02 Carla Babcock, Sam McEwen, Aaron Schmidt       Modifications to test stand for TM3 testsTest piece installed with Sam, Aaron and
Alexander. Ended up shimming the support
stand (middle foot) since it seemed to be
 20201211_140703.jpg20201211_140639.jpg20201211_140605.jpg 
  826   Thursday, December 03, 2020, 15:55 Carla Babcock, Alexander Shkuratoff       Modifications to ISAC test stand for TM3 testsThursday, December 03, 2020, 15:54 :
Got sign off from John Chow to run
the system, though the nylon insulator was
 20201203_150458.jpg20201203_173725.jpg 
  740   Thursday, June 27, 2019, 09:51 Fernando Maldonado      Problems/SolutionsMelted cables changedSee elog 737 

  
  227   Friday, November 02, 2012, 14:20 Aurelia Laxdal LP-SISITWTM1   Mass scan done

Normal
0




false
false
false
  
  1000   Thursday, April 04, 2024, 10:38 Dave Neilson LP-SIS  44691-845235-26DoneMass marker testing Thursday, April 04, 2024, 09:49:
Target inserted yesterday, April 3. mass
marker tube connections carefully confirmed.
  
  1008   Thursday, May 02, 2024, 13:45 Dave Neilson-LP-SIS  44691-845235-26In progressMass marker testing Wednesday, May 01, 2024, 12:44: 
pumped down to rough vacuum, TP1B now on.
Wednesday, May 01, 2024, 12:49: 
  