950
|
Tuesday, December 13, 2022, 16:12 |
Aaron Schmidt | | HP-FEBIAD-CTL | | | 43104-2 | 45235-12 | In progress | New anode routed FEBIAD Test - 2 | Thermocouples installed (X):
O - O
O - Anode |
|
664
|
Monday, May 28, 2018, 08:46 |
Aaron Schmidt | | LP-FEBIAD | | TM2 | 41790-9 | 42752-5 | In progress | New TM source tray swap out. | Monday, May 28, 2018, 08:45: Venting. Prep
For removal.
Close FS#8. Clean up water |
|
677
|
Friday, August 10, 2018, 10:56 |
Aaron Schmidt | | | | | | | Problems/Solutions | New PS installation and Cathode BIAS set | Friday, August 10, 2018, 10:25: Remove
TBHT 500 PS and replace with TBHT 600 PS.
Friday, August 10, 2018, 10:50: Switch |
|
773
|
Wednesday, November 27, 2019, 16:01 |
Fernando Maldonado | | | | | | | Problems/Solutions | New Controller for TP6 | Wednesday, November 27, 2019, 15:31: During
HV tests, bias was around 55kV when a spark
occur and almost immediately the controller |
|
639
|
Friday, February 23, 2018, 08:50 |
Aaron Schmidt | | | | | | | | New Al Corona | Friday, February 23, 2018, 08:50 |
|
421
|
Tuesday, January 20, 2015, 14:31 |
Anders Mjos | | | | | | | Problems/Solutions | Ne leak disconnected for recallibration | SN 11-231 from VIC |
|
817
|
Tuesday, October 27, 2020, 08:54 |
Aaron Schmidt | Nb#9 | LP-SIS | ITW | TM2 | 44508-2 | 43515-4 | In progress | Nb#9 Conditioning | Tuesday, October 27, 2020, 08:40: Roughing.
Tuesday, October 27, 2020, 09:13:
TP1B on. |
|
192
|
Friday, August 31, 2012, 13:59 |
Anders Mjos | Nb#7 | LP-SIS | ITW | TM1 | | | In progress | Nb#7 installed | Friday, August 31, 2012, 15:19: roughing
Friday, August 31, 2012, 15:39 :
starting turbos |
|
193
|
Tuesday, September 04, 2012, 08:11 |
Anders Mjos | Nb#7 | LP-SIS | ITW | TM1 | | | Done | Nb#7 installed |
|
|
910
|
Wednesday, January 05, 2022, 15:12 |
Carla Babcock | | | | | | | | Modifications to test stand for mass marker tests | Connection of TBHT negative to HV common
removed (R4 in circuit diagram). Labelled
and put in MRO bucket. |
|
822
|
Tuesday, December 01, 2020, 11:56 |
Carla Babcock | | | | | | | In progress | Modifications to test stand for TM3 tests | Tuesday, December 01, 2020, 11:56 :
TSG:BIAS unplugged and controls pigtail
(made by Ray) added in order to connect controls |
|
824
|
Wednesday, December 02, 2020, 08:32 |
Carla Babcock | | | | | | | | Modifications to test stand for TM3 tests | Wednesday, December 02, 2020, 08:31 :
Added copper wire connection to multipin
screw terminals in HV cage to make sure they |
|
827
|
Friday, December 04, 2020, 08:53 |
Carla Babcock | | | | | | | | Modifications to test stand for TM3 tests | Friday, December 04, 2020, 08:52 :
Test stand roughed down to 29mT overnight.
Started turbos for testing later. |
|
829
|
Tuesday, December 08, 2020, 11:54 |
Carla Babcock | | | | | | | | Modifications to test stand for TM3 tests | The copper tubes to be used in the TM3
test piece may have flux inside them from
soldering the end caps on. There are holes |
|
830
|
Friday, December 11, 2020, 15:02 |
Carla Babcock, Sam McEwen, Aaron Schmidt | | | | | | | | Modifications to test stand for TM3 tests | Test piece installed with Sam, Aaron and
Alexander. Ended up shimming the support
stand (middle foot) since it seemed to be |
|
826
|
Thursday, December 03, 2020, 15:55 |
Carla Babcock, Alexander Shkuratoff | | | | | | | | Modifications to ISAC test stand for TM3 tests | Thursday, December 03, 2020, 15:54 :
Got sign off from John Chow to run
the system, though the nylon insulator was |
|
740
|
Thursday, June 27, 2019, 09:51 |
Fernando Maldonado | | | | | | | Problems/Solutions | Melted cables changed | See elog 737
|
|
227
|
Friday, November 02, 2012, 14:20 |
Aurelia Laxdal | | LP-SIS | ITW | TM1 | | | | Mass scan done |
Normal
0
false
false
false
|
|
1000
|
Thursday, April 04, 2024, 10:38 |
Dave Neilson | | LP-SIS | | | 44691-8 | 45235-26 | Done | Mass marker testing | Thursday, April 04, 2024, 09:49:
Target inserted yesterday, April 3. mass
marker tube connections carefully confirmed. |
|
1008
|
Thursday, May 02, 2024, 13:45 |
Dave Neilson | - | LP-SIS | | | 44691-8 | 45235-26 | In progress | Mass marker testing | Wednesday, May 01, 2024, 12:44:
pumped down to rough vacuum, TP1B now on.
Wednesday, May 01, 2024, 12:49: |
|